ACTION TRANSMITTAL No

Similar documents
ACTION TRANSMITTAL No

ACTION TRANSMITTAL No

Metropolitan Council Transportation Committee. Twin Cities Regional Bicycle Barriers Study

Twin Cities Regional Bicycle System Study

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

Regional Bicycle Barriers Study

Bus Rapid Transit Plans

Introduction and Authority

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

ACTION TRANSMITTAL No

Regional Bicycle System Master Study. Preliminary Results Update

Twin Cities Bicycle Barriers Study Technical Advisory Work Group December 19, 2016

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

TABLE OF CONTENTS. Executive Summary

ACTION TRANSMITTAL No

Hennepin/First Transportation Study

Bicycle and Pedestrian Investment Direction

Chapter 7: Bicycle And Pedestrian Investment Direction

Midtown Corridor Alternatives Analysis

Update on Traffic Implications of Viking Lakes Development Including Vikings Practice Facility

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

Appendix C. Corridor Spacing Research

Information Item. Transit and TDM Projects. Range of 22%-32% of Funds. Range of $31.58-$45.94 M

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

CHAPTER 7: TRANSPORTATION

Dakota County CSAH 31. Corridor Transportation Study

ACTION TRANSMITTAL No

DRAFT 04/18/2017. This transportation plan includes the following information:

Chapter 9: Pedestrians and Bicyclists

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

Enhancing Return on Investment for MnPASS Express Lanes

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Pedestrian Project List and Prioritization

BIKE PLAN CONTENTS GATEWAY

DAKOTA COUNTY PLANNING COMMISSION

Durham Region Long Term Transit Strategy

Project Update May 2018

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

This page intentionally left blank.

BIKE ON ROAD NETWORKS: URBAN & RURAL. Non-motorized Transportation Networks. Madison County Council of Governments

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Chapter 7 Bicycle and Pedestrian Investment Direction

The Florida Bicycle and Pedestrian Partnership Council

Chapter 6: Transportation

MnDOT Implementation of Complete Streets Policy. January 2014

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

MEETING NOTES Meeting notes - User -.docx. Jiaro Viafara, MPO David Kuharenko, GF Engineering Kim Greendahl, City of GF

MnPASS System Today and the Future

Rochester Downtown Bicycle Study 2009

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

CHIEF PEGUIS TRAIL EXTENSION WEST

Intersection Traffic Control Feasibility Study

We want to hear from you!

CITY OF ELKO BICYCLE AND PATHWAY PLAN

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Hennepin County Bicycle and Pedestrian Planning

Almon Street Bike Lane Planning

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

2016 Neighborhood Street Fund Application

ACTION TRANSMITTAL No

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Montgomery County Bicycle Master Plan

Staff Report City of Manhattan Beach

Bicycle and Pedestrian Plans and Improvements

Stakeholder Communication and Public Involvement Plan

Perryville TOD and Greenway Plan

Arterial Transitway Corridors Study. Ave

5. RUNNINGWAY GUIDELINES

Philip Schaffner Minnesota Department of Transportation October 22, 2013

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Corridor Management Committee. February 11, 2016

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

This page intentionally left blank.

2. THAT the Mayor and Corporate Officer be authorized to execute all documents related to this matter.

San Mateo County Comprehensive Bicycle and Pedestrian Plan

Castro Valley Municipal Advisory Council March 19, 2018

Community Task Force July 25, 2017

Transportation Master Plan Advisory Task Force

Shifting Gears for a Healthier City.

I-35W Solutions Alliance Project Update July 13, 2017

Bicycle Friendly Niagara Falls

Acknowledgements PROJECT MANAGEMENT TEAM (PMT) TECHNICAL ADVISORY WORKING GROUP (TAWG) CONSULTANT TEAM. Metropolitan Council

Primary Contact. Organization Information. Application Multiuse Trails and Bicycle Facilities

MASTER BICYCLE AND PEDESTRIAN PLAN

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Update of the Master Transportation Plan s (MTP) Bicycle Element

Caddo Parish Bicycle Plan

Regional Trails Corridor Assessment

Chapter 6 Transportation Plan

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

Transcription:

Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2016-15 DATE: February 5, 2016 TO: FROM: Transportation Advisory Board Technical Advisory Committee PREPARED BY: Steven Elmer, Planning Analyst, (651) 602-1756 SUBJECT: REQUESTED ACTION: RECOMMENDED MOTION: Regional Bicycle Transportation Network (RBTN) Change Requests Dakota County requests that specific Tier 1 and Tier 2 alignments be designated on the Met Council s on-line, interactive RBTN map for use in the 2016 Regional Solicitation. That TAB approve the Met Council s on-line, interactive RBTN map with changes requested by Dakota County, for use in the 2016 Regional Solicitation. BACKGROUND AND PURPOSE OF ACTION: The Regional Bicycle Transportation Network (RBTN) was developed through a Regional Bicycle System Study conducted in 2013 2014 and later adopted by the Met Council as the official regional bicycle network in the 2040 Transportation Policy Plan (TPP). The goal of the RBTN is to establish an integrated seamless network of on-street bikeways and off-road trails to most effectively improve conditions for bicycle transportation at the regional level and to encourage planning and implementation of future bikeways by cities, counties, parks agencies, and the state, in support of the regional network vision. The Met Council is the responsible government agency to designate the various corridors and alignments through the development and adoption of the TPP. In order to provide the best opportunity for local jurisdictions to implement the RBTN through the regional solicitation process, the Council notified local governments in November of this opportunity to request minor refinements to the RBTN map. The following specific types of administrative or technical change requests were accepted for consideration at this time: A. Designating an official alignment within an established Tier 1 or Tier 2 corridor; B. Establishing a designated alignment that parallels and is within ½-mile of an established Tier 1 or Tier 2 corridor; C. Moving a designated Tier 1 or Tier 2 alignment to a parallel location within ½-mile of the original alignment. The Met Council received two requests for changes to the RBTN map and each is described below: 1) Dakota County is requesting that CSAH 38 (McAndrews Road) be designated as the official Tier 2 alignment for the RBTN Tier 2 corridor between Nicollet Avenue in Burnsville and TH 3 in Rosemount. This proposed change would be an administrative revision, as defined in the 2040 TPP, that identifies a more specific alignment within what is shown as a conceptual one-mile wide corridor in the TPP (see attached Map A). Page 1 of 3

2) Dakota County is requesting that a Tier 1 alignment be designated to replace the northsouth RBTN Tier 1 corridor centered along Galaxie Avenue between CSAH 42 in Apple Valley and CSAH 32 in Eagan (see attached Map B). The proposed alignment would lie approximately 1/8 th to ½-mile east of the established Tier 1 corridor; it would parallel the Tier 1 corridor and would follow Flagstaff Avenue and Johnny Cake Ridge Road. RELATIONSHIP TO REGIONAL POLICY: The RBTN was adopted into the 2040 Transportation Policy Plan in January 2015. The RBTN sets the region s priorities for bicycle planning and investment. STAFF ANALYSIS: Staff reviewed each request to determine how the regional intent of the original RBTN corridor or alignment was maintained, improved, or impacted. Change Request #1: Designate Dakota County State Aid Highway 38 as the Tier 2 alignment for the existing Tier 2 corridor between Nicollet Avenue in Burnsville and TH 3 in Rosemount. The review and analysis for this proposed change resulted in the following findings: All of the criteria were met regarding the original RBTN corridor directional orientation and proximity to the proposed alignment, and regarding support within local plans. All criteria were met with regard to the RBTN guidelines established in the 2040 TPP for designating RBTN corridors and alignments. As a result of this review and analysis, staff recommends accepting the request to designate CSAH 38 as the official RBTN Tier 2 alignment between Nicollet Avenue and TH 3. Change Request #2: Designate a Tier 1 alignment approximately 1/8 th to ½-mile east of and generally parallel to the north-south RBTN Tier 1 corridor centered along Galaxie Avenue between CSAH 42 and CSAH 32 in Dakota County. The review and analysis for this proposed change resulted in the following findings: All of the criteria were met regarding the original RBTN corridor directional orientation and proximity to the proposed alignment, and regarding support within local plans. All but one criteria were met with regard to the RBTN guidelines established in the 2040 TPP for designating RBTN corridors and alignments. One criterion, follow spacing guidelines that reflect established development and transportation patterns was partially met. Although the original spacing of the RBTN corridors/alignments is narrowed, the proposed alignment improves direct connections to a major high school and other regional destinations that would increase potential bicycle travel compared to the expected demand within the original corridor. As a result of this review and analysis, staff recommends accepting the request to designate a Tier 1 alignment east of and generally parallel to the existing north-south RBTN Tier 1 corridor centered along Galaxie Avenue in Dakota County. COMMITTEE COMMENTS AND ACTION: At its January 14, 2016, meeting, TAC Planning recommended adoption of the updated map for use in the Regional Solicitation. Page 2 of 3

At its February 3, 2016, meeting, TAC recommended adoption of the updated map for use in the Regional Solicitation. ROUTING TO ACTION REQUESTED DATE COMPLETED TAC Planning Committee Review & Recommend January 14, 2016 Technical Advisory Committee Review & Recommend February 3, 2016 Transportation Advisory Board Review & Approve Page 3 of 3

DAKOTA COUNTY RBTN Change Request A: Designate CSAH 38 (McAndrews Road) as an RBTN 2 official alignment The proposed designation of CSAH 38 as a Tier 2 Alignment addresses the following. (See Attachment 2) Proposed Change Map - Aligns with both Apple Valley and Rosemount Bicycle Pedestrian Plans - Aligns with Dakota County Regional Trail System Plan - Connects Regional Destinations including Minnesota Zoo, Lebanon Hills Regional Park, BurnsvilleCenter, Cedar BRT, North Creek Regional Greenway, Rosemount Regional Greenway

Map A 30 Attachment C BURNSVILLE 32 77 EAGAN 43 32 5W L e b a n o n H i l l s R e g i o n a l P a r k 13 11 35E 35E 35 38 B u r n s v i l l e C e n t e r R e g i o n a l B i c y c l e T r a n s p o r t a t i o n N e t w o r k P r o p o s e d C h a n g e RBTN 1 - Alignment RBTN 1 - Corridor RBTN 2 - Corridor 42 0 0.25 0.5 1 Miles RBTN 2 - Alignment RBTN 2 - Alignment "PROPOSED" 46 23 Galaxie Ave. APPLE VALLEY Eastview HS LAKEVILLE M i n n e s o t a Z o o N e w D e v e l o p m e n t Flagstaff Ave. Johnny Cake Ridge Road 31 North Creek Regional Greenway 38 ROSEMOUNT 33 42 EMPIRE 46 3

Potential Regional Trail Alignments A = Dakota County South Urban Regional Trail B = North Creek Greenway Trail 7-16 Parks and Active Living October 2009 Attachment B Future People Movement Plan Figure 7.4 City of Apple Valley

Map B SVILLE 32 35E R e g i o n a l B 31i c y c l e T r a n s p o r t a t i o n N e t w o r k P r o p o s e d C h a n g e EAGAN RBTN 1 - Alignment RBTN 1 - Corridor RBTN 2 - Alignment RBTN 2 - Corridor Existing Trail Funded Trail Planned Trail Schools RBTN 1 - Alignment "PROPOSED" Planned Separated Crossing Existing/Funded Separated Crossing 0 0.25 0.5 1 M i n n e s o t a Z o o L e b a n o n H i l l s R e g i o n a l P a r k Miles 77 APPLE VALLEY 38 Johnny Cake Ridge Road 31 ROSEM 23 Galaxie Ave. Eastview HS 33 North Creek Regional Greenway 42 Flagstaff Ave. 46 N e w D e v e l o p m e n t LAKEVILLE EMPIRE TWP