by Rob Chopowick General Manager, Con- Test

Similar documents
Statesville, NC. Results of AM ASHRAE 110 Laboratory Fume Hood Performance Evaluations Venturi Hood

Fumehood Performance Test Report

University of North Florida Performance Requirements For Laboratory Fume Hoods. As Manufactured Performance Tests. As Installed Performance Tests

MANAGEMENT PROCEDURE FOR LABORATORY VENTILATION

LABORATORY FUME HOOD/CANOPY USE AND MAINTENANCE PROGRAM

Mott Manufacturing Limited

LABORATORY FUME HOOD SPECIFICATION AND MAINTENANCE PROGRAM

H V A C C o n t r o l s L a b o r a t o r y. Application Note

Laboratory Guidelines and Standards Application Note LC-125

APPENDIX A SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from

OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE

"LABORATORY SAFETY SERIES"

Mott Manufacturing Limited

Kansas State University Fume Hood Operation

The primary purpose of laboratory fume hoods is to keep toxic or irritating vapors out of the general laboratory working area.

LABORATORY SAFETY SERIES: Laboratory Hoods

Laboratory Ventilation. Environmental, Health, and Safety

Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program

Chapter 4: Implementing Effective Exposure Controls

IH Report: SUFMO 08/09-CC21 1/27/2009 Stanford University Gas Cabinet Installation and Performance Criteria

Scientific Equipment & Furniture Association SEFA Recommended Practices For Laboratory Fume Hoods

FUME CUPBOARD PERFORMANCE CHECK

CTG Certification Protocol -- Version 3.0 SUMMARY

ASHRAE-110 Type-Test Report for 1.5m Wide Bench-Type fumetop1500 FH-150 Fume Hood of TopAir, USA Ref: ANSI/ASHRAE

The routine maintenance and inspection of local exhaust ventilation (LEV)

HVAC Air Duct Leakage. Tech University 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA

LEV Issues. Local Exhaust Ventilation. A Salesman Approaches! Why is LEV important? What is it supposed to do? What comprises an LEV system?

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems

Calibration Requirements for Direct Reading Confined Space Gas Detectors

Nitrous Oxide as a Tracer Gas in the ASHRAE Standard

INTERPRETATION IC OF ANSI/ASHRAE STANDARD VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

Work Equipment: LOCAL EXHAUST VENTILATION

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

Vision Painting Inc Safety Management System

MINIMUM SAFETY REGULATIONS

Don t Forget About Fit What You Need to Know About Respirator Fit-testing

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

Standards of Practice Respiratory Protection: Appendix C

SURROGATE POWDER AND ASHRAE-110 TESTING OF A MULTI-PURPOSE ENCLOSURE FOR WEIGHING/SIEVING/FLUID BED DRYER APPLICATIONS

UHSE. Bath University HR Department UHSE. Safe Use of Fume Cupboards. Document Information

MINNESOTA STATE UNIVERSITY MOOHREAD CHEMICAL HYGIENE PLAN

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

How to Test Air Change Effectiveness

Space Pressurization: Concept and Practice ASHRAE Distinguished Lecture Series

Issue Date: Revision Date: Version 1 1. IDENTIFICATION

Title: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

Laboratory Inspection Checklist


A. Evaluation of the written program

Testing the Vented, 7-Liter Induction Chamber. Report 6 April 2008

Issuing Date January 8, 2019 Revision Number 3 1. IDENTIFICATION. For Transportation Emergencies, call Aquaphoenix Scientific:

Results of Field Measurements and CONTAM Simulation. Building Science

ALBUQUERQUE PUBLIC SCHOOLS RESPIRATORY PROTECTION PROGRAM

2014 STATE OF THE SYSTEM REPORT

RESIDENTIAL AND COMMERCIAL REGULATORS FOR ABNORMAL OPERATING CONDITIONS (AOC) WITH 3 FOOT CLEARANCE INSTALLATION REQUIREMENTS.

Safety Data Sheet acc. to OSHA Hazard Communication Standard (29 CFR )

Laboratory Fume Hood and Exhaust Fan Penthouse Exposure Risk Analysis Using The ANSI/ASHRAE and Other Tracer Gas Methods

CHEMISTRY FACULTY LABORATORY SAFETY CONTRACT CENTRAL CAMPUS

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

ACCESSORY KIT INSTALLATION INSTRUCTIONS

LEV GUIDANCE FOR SAFE USAGE, TESTING AND MAINTENANCE OF LOCAL EXHAUST VENTILATION SYSTEMS WITHIN ANGLIA RUSKIN UNIVERSITY RISK MANAGEMENT

HPI-4N1 NEGATIVE PRESSURE COMPOUNDING ASEPTIC ISOLATOR PERFORMANCE EVALUATION

Course Learning Outcomes for Unit VIII. Reading Assignment. Unit Lesson

Safety Data Sheet (SDS) OSHA HazCom Standard 29 CFR (g), Rev and GHS Rev 03.

LABORATORY SAFETY. By EOHS. ILRI Nairobi, 7th August, 2016

SECTION 12.0a CONSTRUCTION SYSTEMS AND ASSEMBLIES STANDARDS AND GUIDELINES ADDENDUM A: LABORATORY BUILDINGS

Australian/New Zealand Standard

Laboratory Safety Review Checklist One Shields Ave Davis, CA Phone: (530) Fax: (530)

Texas Department of Insurance. Respiratory Protection. Provided by. Workers Health & Safety HS01-027B (1-06)

Measuring range Δp (span = 100%) Pa

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment

EFFECTIVE DESIGN OF CONVERTER HOODS. 111 Ferguson Ct. Suite 103 Irving, Texas U.S.A. 400 Carlingview Dr. Toronto, ON M9W 5X9 Canada.

Vertebrate Animal Biosafety Level 1 Criteria

COMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS

MATERIAL SAFETY DATA SHEET

To ensure compliance to WorkSafeBC Regulation Part 9 Confined Space Entry which states:

Environmental: Hazardous Waste: Satellite Accumulation Areas (SAA)

Safe Work Practices (SWP) SWP (3) CONFINED SPACE ENTRY

MULTI CASUALTY INCIDENTS IN THE MOUNTAINS AND REMOTE AREAS GENERAL ASPECTS MARC BLANCHER, MD FIDEL ELSENSOHN, MD

How to Ensure AMCA-Certified Products Get Installed. An AMCA International White Paper. September, 2015

Half Facepiece Respirator Assembly 5000 Series, Dual Cartridge, Organic Vapor/P95, Disposable

SAFETY AND HEALTH IN THE USE OF CHEMICALS AT WORK

MATERIAL SAFETY DATA SHEET (MSDS) MATERIAL SAFETY DATA SHEET EM SCIENCE 1. CHEMICAL PRODUCT AND COMPANY IDENTIFICATION. Catalog Number(s):

Technical Specifications (In-Cash Procurement)

Safety Services. Introduction

Product Test Report F.A. Lennon Drive December 2015 Solon, Ohio U.S.A. Page 1 of 7. Valve Series Description Test Pressure Test Qty.

TABLE OF CONTENTS PART 2 - CONFINED SPACES

EMERGENCY PHONE: or (651) (24 hours)

Airtightness Testing in Large Buildings: NESEA 2016

Biological Safety Cabinet Guidelines

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

This program shall contain, as a minimum, the following components:

Respiratory Protection for Producers

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

LEV Inspection & Test Report

AWS C2.21M/C2.21:2003 An American National Standard. Specification for Thermal Spray Equipment Acceptance Inspection

Health, Safety, Security and Environment

Safety Data Sheet acc. to OSHA Hazard Communication Standard (29 CFR )

POTENTIAL HEALTH & SAFETY HAZARDS

Enclosure Sealing Webinar: Overview

Transcription:

by Rob Chopowick General Manager, Con- Test

ASHRAE & G.W. Knutson and K.J. Caplan, University of Minnesota RP- 70 The Effect of Room Air Challenge on the Efficiency of Laboratory Fume Hoods

1. Smoke test 2. Face velocity 3. Tracer gas Method of tesong only

The purpose to provide Industry Standard Prac7ces (2010 version, sec7on 1.0) SEFA encourages the use of third party independent tes7ng where appropriate (2010 version, Disclaimer)

This prac:ce is designed to be consistent with the ASHRAE 110 protocol (sec:on 3.2) Refer to ASHRAE 110-1995 (or latest edi:on) for velocity measurement procedures (sec:on 4.4.1, 5.3.4) The ASHRAE 110 is the recognized method for evalua:ng the performance of fume hoods. (sec:on 5.3) SEFA recommends the ASHRAE 110-1995 (or most current edi:on) test (sec:on 5.3.5 - Containment tes:ng - As Installed)

it remains the responsibility of the users of the Standard to judge the suitability for their par7cular purpose (Preface, note 2) Tracer gas test MAY be performed Tracer gas SHALL be performed

The test specified in ASHRAE 110 shall be performed. (Sec:on5.3 - Manufacturer's test - Containment test) Face velocity shall be determined in accordance with the containment test specified in Clause 5.3 (see above) (SecOon 9.4.1 - Face velocity test) The test specified in ASHRAE 110 shall be performed (Sec:on 9.4.2 - Field Test - Containment Test)

The primary purpose of this standard is to establish minimum requirements and best prac7ces for laboratory ven7la7on systems (2012 version, sec7on 1.2)

Test specifica:ons used for selec:ng a hood, in commissioning or in rou:ne tes:ng, shall refer to the applicable ANSI/ASHRAE 110 defined performance tests or to a test standard recognized to be equivalent. (sec:on 6.1.1) Airflow visualiza:on tests shall be conducted as described in the ANSI/ ASHRAE 110-1995 Method of Tes:ng Performance of Laboratory Fume Hoods. (sec:on 6.1.2.1) The average face velocity shall be determined by the method described in the current version of ANSI/ASHRAE 110 Method of Tes:ng Performance of Laboratory Fume Hoods. (sec:on 6.1.2.5) The tracer gas containment tests shall be conducted as described in the ANSI/ASHRAE 110-1995 Method of Tes:ng Performance of Laboratory Fume Hoods. (sec:on 6.1.2.7)

< 60 fpm 60-80 fpm 80-100 fpm 100 120 fpm 120 150 fpm > 150 fpm < 0.30 m/s 0.30-0.40 m/s 0.40-0.50 m/s 0.50-0.60 m/s 0.60-0.75 m/s > 0.75 m/s - not recommended - environmental and user dynamics have much greater impact - tracer gas tesong should be used to verify containment - environment should be relaovely ideal - requires prudent user pracoces - hood must have excellent containment characterisocs - most recommended range - containment usually effecove - reasonable cost effecoveness - similar containment characterisocs as 80 to 100 fpm range but at higher operaong costs - may be a opoon if containment at 80 to 100 fpm is inadequate - containment characterisocs may be comparable to lower ranges - operaong costs very much higher - generally agreed that there may be turbulent flow which increases potenoal for leakage

While ASHRAE 110 has defined basic fume hood test procedures, a performance guideline was not available. A primary feature of MD15128 is the iden7fica7on of specific pass/fail performance criteria (2004 version, pg 3-4)

While American Society of Hea:ng, Refrigera:ng and Air- Condi:oning Engineers ASHRAE 110-1995: Method of Tes:ng Performance of Laboratory Fume Hoods has defined the basic fume hood test procedures, a guideline that defines fume hood performance in not currently available. MD 15128 has been developed to fulfill this need.(preface, pg.3) Use equipment and procedures as described in ANSI/ASHRAE 110-1995, with the following excep:ons... (Sec:on 6.9.4 - Tracer Gas Procedures) The devices and apparatus described below were designed to facilitate implementa:on of this guideline and the ANSI/ASHRAE 110 standard's smoke visualiza:on test, and to provide a consistent test protocol (Appendix A.2)

CANADA CSA Z316.5 MD 15128 OHS Regs. Fire Codes MD 15129 (Perchloric acid) GD- 52 (Radioisotope hoods) UNITED STATES ASHRAE 110 AIHA Z9.5 NEBB Procedural Standard NIH SpecificaOons SEFA 1 Industrial VenOlaOon Book Prudent PracOces in the Lab OSHA RegulaOons NFPA Organiza-on Canadian Standards AssociaOon Public Works and Government Services Canada (PWGSC) Federal and Provincial OHS Agencies Canadian Commission of Building and Fire Codes (CCBFC) Public Works and Government Services Canada (PWGSC) Canadian Nuclear Safety Commission American Society of HeaOng, RefrigeraOon and Air CondiOoning Engineers American Industrial Hygiene AssociaOon NaOonal Environmental Balancing AssociaOon U.S. NaOonal InsOtutes of Health ScienOfic Equipment and Furniture AssociaOon American Conference of Governmental Industrial Hygienists NaOonal Research Council OccupaOonal Safety and Health AdministraOon NaOonal Fire ProtecOon AssociaOon

Process Authority Recognized As What makes it different? Bind- ing* Modi- fiable Regula-ons LegislaOon Government Law Codified Rules Standard Consensus Recognized Body Necessary "Shall", "Will", "Must * ** Guidelines Consensus Recognized Body Desirable "Should", "Would", "May" Recommended Prac-ces Consensus Recognized Body EffecOve Benchmarks * Standards can be adopted by authorita:ve bodies and become enforceable ** Standards may have specified discre:onary elements

CANADA Document Type Jurisdic-on CSA Z316.5 Standard None MD 15128 Guideline Laboratories managed by PWGSC OHS Regs. Law Provincial (and Federal) Fire Codes Standard Provincial MD 15129 (Perchloric acid) Guideline Laboratories managed by PWGSC GD- 52 (Radioisotope hoods) Guideline Nuclear Laboratories UNITED STATES ASHRAE 110 Standard None AIHA Z9.5 Standard None NEBB Procedural Standard Standard None NIH Guideline NIH buildings and facilioes SEFA 1 Recommended Pract. None Industrial VenOlaOon Book Recommended Pract. None Prudent PracOces in the Lab Recommended Pract. None OSHA Regs. and NFPA Law State (and Federal)

Predominantly all fume hood reference documents are either: 1. non- binding or at least modifiable 2. limited in their jurisdicoon

CANADA Document Type Jurisdic-on CSA Z316.5 Standard None MD 15128 Guideline Laboratories managed by PWGSC UNITED STATES ASHRAE 110 Standard None AIHA Z9.5 Guideline None SEFA 1 Recommended PracOce None

Assurance about safety

ProtecOon from harmful gases, vapours and aerosols generated within the fume hood.

Nothing is absolute Many factors involved

Proximity of supply air diffusers Proximity of doors (and windows) LocaOon of hood in room rela:ve to other lab equipment and furniture

Inadequate exhaust draw Incorrect system configura:on Baffles, bypasses, air foils or sashes improperly set or misaligned Makeshio user modificaoons Poor workmanship

Interfering with air flows Overloading hood with equipment, improperly placing apparatus and containers, covering air foil CreaOng excessive thermal challenges within the hood Improper use Using it for purposes that would be beber served by other equipment such as biosafety cabinets and glove boxes

Limited breadth Lacks performance criteria $$$$

Airflow Visualiza-on Inflow Velocity Tracer Gas Bypass Effec-veness VAV Func-on Exhaust Flow Installa-on Cross DraR Airflow monitor/alarm Exhaust System Hood sta-c pressure Noise CSA 316.5 110 110 110 MD 15128 110 BC OHS Part 30 ASHRAE 110 AIHA Z9.5 110 110 SEFA 1 110 110 110

Test name Acceptance Criteria 1. Airflow visualizaoon No visible escape of smoke 2. Inflow face velocity VARIOUS 3. Tracer gas <0.10 ppm (<0.05 ppm MD15128) 4. Bypass effecoveness < 3x avg. velocity at design height (<250 fpm (1.25 m/s) MD15128) 5. VAV funcoon Response Ome < 3 sec., Time to steady state < 5 sec. 6. Minimum exhaust flow 150-375 hood ACH (NFPA > 25 cfm/sq.o. work surface) 7. InstallaOon Sash, baffles, exhaust duct, lights, power, noise ok 8. Cross drao < 30 fpm or < 50% of avg. face velocity (<30 fpm MD15128) 9. Airflow monitor/alarm Installed properly, accurate within 10%, <3 sec delay 10. Exhaust System Exhaust stack >10 o, exhaust vel. prevents re- entrainment 11. Hood StaOc Pressure 0.1-0.75 in.w.g. (<.25 MD15128) 12. Noise Approx. 50 dba (<70 dba MD15128) *Criteria may vary from document to document but selected criteria above are commonly referenced.

SpecificaOon agreement Pass/Fail protocol agreement

1. All manufacturers test the fume hoods so that is enough 2. TesOng a fume hood means that it is cerofied 3. Once it is tested it is safe to use 4. TesOng only takes a few minutes 5. TesOng is not expensive

The manufacturer can create a very effec7ve safety device but its effec7veness is significantly dependant on how well it is integrated into the lab environment.

To authorita7vely or officially a[est or confirm someone or something as being genuine or true as represented, or as complying or mee7ng specified requirements or standards.

False sense of security Adhesive socker Too many variables

Historical methods took only a few minutes Dependent of total number of tests

Test descrip-on Set- up and take down Es-mated -me to complete tests (varies with hood sizes and sash configura-ons) 5-15 min (+ 15 min for tracer gas set- up) 1. Airflow visualizaoon 6 locaoons x 2 challenges x 10-15 secs/observ = 2-3 min 2. Inflow face velocity 2 sash heights x 8-12 locaoons x 30 sec rdgs = 8-12 min SUB- TOTAL (approx.) 20-25 min (limited set- up and take down) 3. Tracer gas 3 staoc tests + 1 dynamic + 1 perimeter scan = 25-35 min 4. Bypass effecoveness 5-8 min 5. VAV funcoon 5-8 min 6. Exhaust flow 5-8 min (if accessible longer of difficult to access) 7. InstallaOon 3-5 min 8. Cross drao 6 locaoons x 30 sec readings = 5-6 min SUB- TOTAL (approx.) 9. Airflow monitor/alarm 3-8 min No tracer gas = ¾ - 1¼ hrs / With tracer gas: 1½ 2 hrs 10. Exhaust System 15-30 min (coordinaong roooop access and ease of access 11. Hood StaOc Pressure 10-15 min 12. Noise 3-5 min TOTAL (approx.) 1¼ 2 ¼ hrs / With tracer gas: 1¾ 3 hrs