Watermain Replacement and Connection Procedure

Similar documents
Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure

Water Main Break Response Protocols for Chlorinated Systems (In Development Version )

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

PHYSICAL FACILITIES Consultant s Handbook Division 33 Utilities 1300 Disinfecting Underground Potable Water Piping.

SECTION PRESSURE TESTING OF PIPING

Disinfection procedure for water mains and services

SECTION DOMESTIC WATER PIPING

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

DW Module 8: Distribution Answer Key

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

Excavation safety around natural gas

Excavation safety around natural gas

Well Disinfection NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM

HYDROSTATIC LEAK TEST PROCEDURE

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300

SECTION WATER MAIN CONSTRUCTION

1 Exam Prep. Tabs and Highlights

WEEKLY CONSTRUCTION REPORT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

Trainers Manual A412. CITY OF SASKATOON Water and Sewer Section. Water Connection Repair Trainer s Manual. Version # 1-0-2

Irrigation System Winterization and Pressurization Procedures

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

22. Specialty Valves.

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE COMMUNICATION PIPE REPAIRS

CITY OF ROSEVILLE DESIGN STANDARDS

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

HYDRANT/WATER POINT INSPECTION AND MAINTENANCE

Confined Space Entry

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

TECHNICAL MEMORANDUM 002 EMORANNO. 001

Working in Confined & Enclosed Space Policy

Model GPR Primary Pressure Regulating Valve. Instruction Manual

TRADESMAN DRAINLAYER

MUELLER. Xp, & Lineseal 350 Butterfly Valves

Engineering Design Criteria & Standard Drawings

IL Route 71 Construction Update

PROPOSAL. PROPOSAL OF, a corporation a

Water Distribution Study Guide Class II (Made available by: Kansas Rural Water Association)

ECS Protector Nitrogen Generator PGEN-30 (PGEN-30E)

O&M Receiving and Inspection. Storage of Water Treatment Media

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

Construction Dewatering

Winter Shut Down Procedure

Flow Stopping & Under Pressure Drilling. 312 Bag Pipe Equipment 50. Single Entry Bagging Off Kit 50. PE Adaptor Kit 51.

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

MOREHEAD CITY COUNTRY CLUB POOL BUILDING

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

THERMAL POLITERM WALL AND POLITERM WALL FIX APPLICATION MANUAL. POLITERM WALL / POLITERM WALL FIX. Insulation & Chemicals Division

Confined Space Entry

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

FIRE FIGHTER II SKILL PERFORMANCE CHECK SHEETS NFPA FIRE FIGHTER II SKILL STATION MENU

Associated Hazard (outcome) Control Measures. Reduction of water supply

Dolphin Hybrid RS1 - Suction Pool Cleaner. Operating Instructions

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

TECHNICAL DATA ACCELERATOR MODEL E-1

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

SIZING OF WATER PIPING SYSTEM

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

6900 Maintenance Instruction System Flush

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

OCTOBER 2017 ISSUE Page 1 of 7

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Appendix 4C - Sample SWMS Trenching

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

Mainsflush Troubleshooting Guide

BUTTERFLY VALVES Series 800

Easy Nest Kits. Installation Suggestions

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

User's Manual. MixRite TF 10. Edition 05.08

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

New Jersey State Sanitary Code Chapter IX Public Recreational Bathing N.J.A.C. 8:26 Changes 1/16/18

SIZING OF WATER PIPING SYSTEM

Elevator Concepts ltd. by Wurtec Krause Riverview, MI Fax:

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

Seattle s Experience with Water Main Depressurization Events

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

Gas Injection Systems

Vacuum Excavation in the vicinity of the Wellington Electricity Network

EQUIPMENT AND MATERIALS

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

NORMAL OPERATING PROCEDURES Operating Parameter Information

Purifier for Vinyl Lined Pools

MB-SP Series Solvent Purification System

STEEL TRENCH SHIELDS TUFF-LITE MODELS

Transcription:

Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 January 2015 Connection Procedure Table of Contents TS 7.70.01 Scope... 2 TS 7.70.02 New Watermain System... 2 TS 7.70.03 Connecting to Branch Connections... 3 TS 7.70.04 Connecting to Source Feeder Watermain... 5 Connection Procedure Page 1 of 7

TS 7.70.01 Scope The work involves the procedure for making watermain replacement and connection to an existing watermain system. All work shall be done to the satisfaction of the Contract Administrator. Instructions for making a connection are based on the scenarios in Figure 1 and Figure 2. TS 7.70.02 New Watermain System 1 Pressure test, flush, swab and chlorinate new watermain. Pressure testing and chlorination of new watermains will be in isolation from the existing water distribution system. 2 Service connections larger than 50 mm in diameter shall be installed to street line. The service connection will be pressure tested, flushed, chlorinated and water sampled as part of the watermain system. 3 Contractor will use a portable field test kit to check for residual chlorine and turbidity. If the sample passes, then the two consecutive sampling procedures can begin. The residual chlorine should be better or equivalent to the source sample. Turbidity should be less than < 1 nephelometric turbidity units (NTU). Engineering & Construction Services division Contract Administrator to discuss with Toronto Water operations representative to accept if non-health related. 4 Take two consecutive samples at sampling stations S1, S2, S3, S4 and S5 as shown on Figure 1 and according to TS 7.30 Procedure for Disinfecting Watermains. 5 If samples pass at all five sampling stations, then the new watermain can be connected to the existing watermains. 6 All valves which are part of the isolated section of new watermain shall remain closed until Contractor's bacteriological sample from the filler spool piece has passed. The Contractor shall notify the Contract Administrator with an e-mail message that the sample results indicate a pass. Contractor shall request valving 48-hours in advance. After valving is scheduled, Toronto Water can then begin to open the valves. 7 The new watermain pipe permitted to be dewatered is from the isolation valve on the new watermain to the connection point on the existing watermain which shall be less than 6.1 m in distance. 8 After all branch connections to side streets are connected, the Contractor shall begin reconnecting all existing water services from the existing live watermain to the newly installed watermain. Connection Procedure Page 2 of 7

TS 7.70.03 Connecting to Branch Connections The following is a typical procedure for the connection of a replacement watermain to an existing watermain on street B as shown in Figure 1. 1 Contractor to restrain valve V_3 to anchor tee and valve ATV_1 to ensure the valve does not blow-off. Toronto Water to close valves V_E, V_C, V_D and V_J on the existing watermain system. 2 Toronto Water to open fire hydrant on street B so as to depressurize existing watermain system. 3 Contractor to cut into watemain pipe before valve V_E, that is to say the left side of valve V_E on Figure 1 and install mechanical cap on existing water main. Contractor to pump out water and ensure all discharge water in excavation is below open ends of existing pipes. 4 Valve V_3 is to remain closed. Contractor shall ensure valve V_3 is properly restrained. Contractor to remove blow-off used as a sampling point S_2 for the two samples. 5 Contractor to manually swab and disinfect filler piece which makes up pipe B if length is less than 6.1 m. If length of filler piece is greater than 6.1 m, then standard disinfection methods apply. 6 Contractor to install filler piece of watermain pipe between valve V_3 and V_E. 7 Contractor to install 25 mm corporation stop and new 25 mm copper sampling pipe to grade with blow-off on watermain pipe between V_3 and V_E. 8 Contractor to open valve ATV_1 and then open valve V_3. 9 Toronto Water to open valve V_J. Valve V_E to remain closed. 10 Contractor to flush main in one direction through new 25 mm copper sampling pipe. Contractor then to close valve V_3. 11 Contractor to take a water sample from new copper sampling pipe. Contractor shall notify the ECS Contract Administrator whether the water sample results passed. ECS Contract Administrator to advise Toronto Water of sample results. For water samples with passing results, Toronto Water to advise ECS Contract Administrator when Contractor can proceed with removal of 25 mm copper sampling pipe and backfilling of access pit. 12 Contractor to reopen valve V_3 and Toronto Water to reopen valve V_E after pipe segment water sample has passed. 13 Existing valve V_E will remain in place in an open position. Existing valve box shall be removed or existing valve chamber to be broken down one metre below subgrade according to TS 510. Toronto Water to confirm valve V_E is in the open position. In the event of failing water sample results, Contactor to coordinate with Toronto Water for operation of valve V-3 for any additional sampling. 14 Valves V_C and V_D to remain in the closed position. Page 3 of 7 Connection Procedure

Figure 1: Scenario one connecting to branch connections Connection Procedure Page 4 of 7

TS 7.70.04 Connecting to Source Feeder Watermain Procedure for connecting new watermain system to existing watermain system. For this example the connection will be for a permanent connection on street A as shown on Figure 2. 1 Toronto Water staff to close valves V_A, V_B and V_C on the existing watermain system. 2 Contractor to close TS&V only on new watermain system. The Contractor may need to close valve V_1 and release pressure in the main by partially opening blow-off through the temporary bypass to avoid blowing out valve V_1 if there is insufficient installed pipe lengths between valve V_1 and the connection. Also ensure valve V_1 is properly restrained to avoid blowing-out and injuring a worker should valve V_2 fail. 3 Depressurize existing watermain through fire hydrant on street A. If there is no fire hydrant between the valves, tapping in a blow-off on the existing watermain may be necessary. 4 Pump out excess water from trench. 5 Remove temporary backflow protected by-pass and blow-off connection. 6 Manually swab and disinfect filler pieces of watermains 7 If length of filler piece is greater than 6.1 m, then standard disinfection methods apply. 8 Install filler piece. 9 Contractor to install 25 mm corporation stop and new 25 mm copper sampling pipe to grade. 10 Toronto Water to open fire hydrant on street A. 11 Toronto Water to open valve V_A and flush main in one direction. 12 Toronto Water to close valve V_A and open valve V_B and flush main in one direction through hydrant on street A. 13 Contractor to take a water sample from copper sampling pipe. Sample must first pass before Contractor proceeds with removal of 25 mm copper sampling pipe and backfilling of access pit. 14 Toronto Water to open valve V_1. Page 5 of 7 Connection Procedure

Note 1: Contractor shall collect the sample while the excavation is open and notify the Engineering & Construction Services division Contract Administrator whether water sample results passed. ECS Contract Administrator to advise Toronto Water of sample results. For water samples with passing results, Toronto Water to advise Contract Administrator when Contractor can proceed with removal of 25 mm copper sampling pipe and backfilling of the access pit. Note 2: As a good practice, valves V_A and V_1 should remain closed while valve V_B is left open until acceptable disinfection results are obtained. If there are any existing water services between valves V_A to V_1 or V_B to V_1 or both, the valves should remain closed except for valve V_B until acceptable disinfection test results are confirmed. Only open more than one valve at an intersection, if there is a water supply issue for the area. Connection Procedure Page 6 of 7

Figure 2: Scenario two connecting to source feeder watermain Page 7 of 7 Connection Procedure