Watermain Replacement and Connection Procedure

Similar documents
Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure

Water Main Break Response Protocols for Chlorinated Systems (In Development Version )

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

DW Module 8: Distribution Answer Key

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

PHYSICAL FACILITIES Consultant s Handbook Division 33 Utilities 1300 Disinfecting Underground Potable Water Piping.

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

Disinfection procedure for water mains and services

SECTION PRESSURE TESTING OF PIPING

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK INSTRUCTION ISOLATION OF A WATER NETWORK

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

PAGE 1 OF 7 HEALTH, SAFETY & ENVIROMENTAL MANUAL PROCEDURE: S230 Lock-Out Tag-Out (LOTO) Program REV 4.0 8/13/2012

PORT ST. LUCIE UTILITY SYSTEMS DEPARTMENT FLUSHING REPORT

Excavation safety around natural gas

SECTION DOMESTIC WATER PIPING

Excavation safety around natural gas

HYDROSTATIC LEAK TEST PROCEDURE

WEEKLY CONSTRUCTION REPORT

Trainers Manual A412. CITY OF SASKATOON Water and Sewer Section. Water Connection Repair Trainer s Manual. Version # 1-0-2

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

Irrigation System Winterization and Pressurization Procedures

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE COMMUNICATION PIPE REPAIRS

Confined Space Entry

Control of Hazardous Energy Lockout / Tagout Program

EQUIPMENT AND MATERIALS

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

SECTION WATER MAIN CONSTRUCTION

Well Disinfection NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

CITY OF ROSEVILLE DESIGN STANDARDS

Confined Space Entry

1 Exam Prep. Tabs and Highlights

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAG OUT PROGRAM) Washington State University Tri-Cities (all departments)

TANK MATE INCLUDES: TOOLS REQUIRED: CONRADER VALVES 3/4 WRENCH **TUBING CUTTERS TEE PETCOCK TEE ASSEMBLY 8 FOOT NYLON TUBING

MUELLER. Xp, & Lineseal 350 Butterfly Valves

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Appendix 4C - Sample SWMS Trenching

Working in Confined & Enclosed Space Policy

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

BUTTERFLY VALVES Series 800

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

PROPOSAL. PROPOSAL OF, a corporation a

Hawai'i Rural Water Association Water Course Listing updated 10/4/18 HRWA COURSE TITLE COURE LENGTH (HRS) WBOC APPROVED CEU'S

Flow Stopping & Under Pressure Drilling. 312 Bag Pipe Equipment 50. Single Entry Bagging Off Kit 50. PE Adaptor Kit 51.

SAFETY AND HEALTH STANDARD CONFINED SPACE ENTRY REQUIREMENTS Effective Date: 06/10/10 Standard: 16.2 Document Number: KUCSH0038 Rev: 07

Gas Injection Systems

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

December MTS Houston Luncheon. Hoover Offshore Oil Pipeline System (HOOPS) GA-A244 Bypass and Wye Inspection

Electric and Natural Gas Safety Slide Show Presenter s Notes

(MSW) Process Overview. Introduction Chevron Corporation. All rights reserved.

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

A MESSAGE FROM THE MD

Confined Spaces. 1. Definition Permit/Non-Permit

6900 Maintenance Instruction System Flush

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Construction Dewatering

Site Specific Rules at Plants. Individual Unit Function: Safety Procedure No.: SOP-0135 Page: 1 of 8

Water Distribution Study Guide Class II (Made available by: Kansas Rural Water Association)

Section GATE VALVES

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

22. Specialty Valves.

Lockout/Tagout Program

THE UNIVERSITY OF NORTH CAROLINA

Mainsflush Troubleshooting Guide

SAFETY AND HEALTH INDUSTRIAL HYGIENE Hazard Communication Program Effective Date: 08/07/14 Standard: 10.1 Document Number: KUSHIH0008 Rev: 01

Division of Environmental Quality Wellhead Protection Section

LO/TO LOCKOUT/TAGOUT PROGRAM

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS

LOCKOUT/TAGOUT POLICY

ARKANSAS TECH UNIVERSITY FACILITIES MANAGEMENT HEALTH AND SAFETY MANUAL (LOCKOUT/TAGOUT) 30.0

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY ASSET MANAGEMENT WORK PROCEDURE REPAIR OF BURST MAINS

Warm Water Systems A Practical Guide. Based on over 24 years experience

Seattle s Experience with Water Main Depressurization Events

Florida Senate SB 1694 By Senator Haridopolos

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE

MCW s Control of Hazardous Energy Program

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

Hazardous Energy Control (Lockout-Tagout)

In an emergency the safety of all personnel and the public is of priority.

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

Lockout/Tagout Safety Policy

Confined Space Entry Safety Program

STEEL TRENCH SHIELDS TUFF-LITE MODELS

29 CFR CONFINED SPACE ENTRY

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide)

TJF-Q180V Cleaning and Disinfection Checklist

PROCEDURE NUMBER: PRC-SAF-16 (Preparation of Piping and Equipment for Repair) Page 1 of 10 Rev. 1.4 Date: 10/17/2016 Rev. 2.

Chapter 14 Water Shuttle Operations

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Transcription:

Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 April 2013 Connection Procedure Table of Contents TS 7.70.01 SCOPE... 2 TS 7.70.02 NEW WATERMAIN SYSTEM... 2 TS 7.70.03 CONNECTING TO BRANCH CONNECTIONS... 3 TS 7.70.04 CONNECTING TO SOURCE FEEDER WATERMAIN... 5 Connection Procedure Page 1 of 7

TS 7.70.01 SCOPE The work involves the procedure for making watermain replacement and connection to an existing watermain system. All work shall be done to the satisfaction of the Contract Administrator. Instructions for making a connection are based on the scenarios in Figure 1 and Figure 2. TS 7.70.02 NEW WATERMAIN SYSTEM 1 Pressure test, flush, and chlorinate new watermain. Pressure testing and chlorination of new watermains will be in isolation from the existing water distribution system. 2 Service connections larger than 50 mm in diameter will be terminated as close as possible to the street line. The service connection will be pressure tested, flushed, chlorinated and water sampled as part of the watermain system. 3 Contractor will use a portable field test kit to check for residual chlorine and turbidity. If the sample passes, then the two consecutive sampling procedures can begin. The residual chlorine should be better or equivalent to the source sample. Turbidity should be less than < 1 nephelometric turbidity units (NTU). Technical Services Contract Administrator to discuss with Toronto Water operations representative to accept if non-health related. 4 Take two consecutive samples at sampling stations S1, S2, S3, S4 and S5 as shown on Figure 1 and according to TS 7.30 Procedure for Disinfecting Watermains. 5 If samples pass at all five sampling stations, then the new watermain can be connected to the existing watermains. 6 All valves which are part of the isolated section of new watermain shall remain closed until Toronto Water s bacteriological sample from the filler spool piece has passed. The Toronto Water supervisor will notify the Contract Administrator with an e-mail message that the sample results indicate a pass. Valving is scheduled and Toronto Water can then begin to open the valves. 7 The new watermain pipe permitted to be dewatered is from the isolation valve on the new watermain to the connection point on the existing watermain which shall be less than 6.1 m. 8 Contractor starts reconnecting existing water services from the existing live watermain to the new isolated watermain. Connection Procedure Page 2 of 7

TS 7.70.03 CONNECTING TO BRANCH CONNECTIONS The following is a typical procedure for the connection of a replacement watermain to an existing watermain on street B as shown of Figure 1. 1 Contractor will close valves V_3, V_2 and V_4 and restrain valve V_3 to ensure the valve does not blow-off. 2 Toronto Water to close valves V_C, V_D and V_J on the existing watermain system. 3 Toronto Water to open fire hydrant on street B so as to depressurize existing watermain system. 4 Close hydrant isolation valve to ensure water from hydrant lead does not flow back into watermain pipe. Remove valve V_E or keep in place in a closed position. Pump out water to keep water level in excavation below existing pipe. If valve V_E was kept in place, open valve after permanent connection is complete, and break down one metre below subgrade and abandon in place. 5 Valve V_3 is to remain closed. Ensure valve is properly restrained and remove blow-off. 6 Manually swab and disinfect filler piece which makes up pipe B if length is less than 6.1 m. 7 If length of filler piece is greater than 6.1 m, then standard disinfection methods apply. 8 Install filler piece of watermain pipe. 9 Contractor to install 19 millimetres corporation stop and copper sampling pipe to grade with blow-off on watermain pipe on the dead side of valve V_3. 10 Open valves V_2 and V_4. 11 Valves V_C, V_D and V_J to remain in the closed position. 12 Toronto Water to open fire hydrant on street B. 13 Toronto Water to open valve V_3 and flush main in one direction through fire hydrant on street B. 14 Toronto Water to close valve V_3 and open valve V_J and flush through same fire hydrant on street B. 15 Toronto Water to take a water sample from copper sampling pipe. Sample must first pass before contractor proceeds with removal of 19 mm copper sampling pipe and backfilling of access pit. Since the existing watermain on street B is dewatered, it is a requirement for Toronto Water staff to collect a water sample for bacteriological analysis. Toronto Water will be able to collect a sample at Step 15 to satisfy their regulatory requirement for testing the existing water on street B. Using a fire hydrant as a sampling point is not acceptable. Toronto Water staff will collect the sample while the excavation is open and notify the Technical Services contract administrator whether the water sample results passed. Toronto Water to advise Technical Services when to proceed with the removal of the 19 mm copper sampling pipe and backfilling of the access pit. Page 3 of 7 Connection Procedure

Figure 1: Scenario one connecting to branch connections Connection Procedure Page 4 of 7

TS 7.70.04 CONNECTING TO SOURCE FEEDER WATERMAIN Procedure for connecting new watermain system to existing watermain system. For this example the connection will be for a permanent connection on street A as shown in Figure 2. 1 Toronto Water staff to close valves V_A, V_B and V_C on the existing watermain system. 2 Contractor to close valve V_1 only on new watermain system. The contractor may need to close valve V_2 and release pressure in the main by partially opening valve V_1 and blowing off through the temporary bypass and blow-off to avoid blowing out valve V_1 if there is insufficient installed pipe lengths between valve V_1 and the connection. Also ensure valve V_1 is properly restrained to avoid blowing-out and injuring a worker should valve V_2 fail. 3 Depressurize existing watermain through fire hydrant on street A. If there is no fire hydrant between the valves, tapping in a blow-off on the existing watermain may be necessary. 4 Remove temporary by-pass connection. 5 Cut into the existing pipe on street A and remove the old tee and replace with a suitable length of pipe. 6 Cut into the existing pipe on street A space for the new tee which will be connected to the new watermain. 7 Pump out excess water from trench. 8 Remove old section of watermain pipe marked "A" and discard off-site. 9 Manually swab and disinfect filler pieces of watermains 10 If length of filler piece is greater than 6.1 m, then standard disinfection methods apply. 11 Install filler piece. 12 Contractor to install 19 mm corporation stop and copper sampling pipe to grade. 13 Toronto Water to open fire hydrant on street A. 14 Toronto Water to open valve V_A and flush main in one direction. 15 Toronto Water to close valve V_A and open valve V_B and flush main in one direction through hydrant on street A. 16 Toronto Water to take a water sample from copper sampling pipe. Sample must first pass before contractor proceeds with removal of 19 mm copper sampling pipe and backfilling of access pit. 17 Toronto Water to open valve V_1. Since the existing watermain on street A is dewatered, it is a requirement for Toronto Water to collect water samples for bacteriological analysis. Toronto Water will be able to collect a water sample at Step 16 to satisfy their regulatory requirement for testing the water on street A and in the filler piece. Using a fire hydrant as a sampling point will not be acceptable. Page 5 of 7 Connection Procedure

Note 1: Toronto Water staff will collect the sample while the excavation is open and notify the Technical Services contract administrator whether water sample results passed. Toronto Water to advise Technical Services when to proceed with removal of 19 mm copper sampling pipe and backfilling of the access pit. Note 2: As a good practice, valves V_A and V_1 should remain closed while valve V_B is left open until acceptable disinfection results are obtained. If there are any existing water services between valves V_A to V_1 or V_B to V_1 or both, the valves should remain closed except for valve V_B until acceptable disinfection test results are confirmed. Only open more than one valve at an intersection, if there is a water supply issue for the area. Connection Procedure Page 6 of 7

Figure 2: Scenario two connecting to source feeder watermain Page 7 of 7 Connection Procedure