Precision Hydrogen (All B&W Screen Models)

Similar documents
Solaris Nitrogen. Installation Guide. Solaris Nitrogen Installation Guide Rev 1 PN IG /09/16

Solaris Nitrogen. User Manual. Solaris Nitrogen User Manual Rev 1 PN UM /09/16

Genius 1022, 1023 & NM32LA (All Models)

Genius 3051 & User Manual. Genius User Manual Rev 1 PN UM /05/16

Your local gas generation partner. Precision series Modular gas generation solution for GC.

Your local gas generation partner. Precision series Modular gas generation solution for GC.

Your local gas generation partner. Precision series Modular gas generation solution for GC.

AutoChanger Installation & User Guide Issue 2

AB-3G User Manual Peak Scientific - Rev. 6A 15/09/15

Model GFC 7000T CO 2 Analyzer (Addendum to GFC 7000TA Manual, PN 07272)

OPERATION & MAINTENANCE MANUAL NG6/1 YOUR RELIABLE PARNTER IN LABORATORY GAS HANDLING

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

Pressure Automated Calibration Equipment

Genius 3010 User Manual

700 SERIES BMS II BUBBLER MONITORING SYSTEM

Instruction Manual. Model DSP-Ex Portable Dewpoint Meter. Alpha Moisture Systems Alpha House 96 City Road Bradford BD8 8ES England

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Float Operated Level Controllers

TECHNICAL INFORMATION

DPC-30 DPC-100. Reference Manual

490 Micro GC Site Preparation Checklist

SC505 Sof Care Inflator. Operating Instructions and Service Manual

Using the UltraRAE. Firmware 2.35

D Series Air and Water Kit Part# 02550

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

In Vivo Scientific, LLC INSTRUCTION MANUAL

Preferred Instruments Danbury, CT USA

RAM 4021 Operation Manual

Pneumatic high-pressure controller Model CPC7000

OPERATING INSTRUCTIONS Sherlock Chamber Testing System

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

CalCheck. Instrument User Manual V1.8

USER MANUAL SAVE THESE INSTRUCTIONS. For the most current manual revision, please visit our Website:

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

The Univentor 1250 Anaesthesia Unit

Digital Melting Point Apparatus

Installation, operating and maintenance Instructions for Seemag bypass level indicator

Operating Instructions Part No

Portable oxygen concentrator

Glove Box Installation Manual

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

User Manual GRI- 1500Li

RPS900W Redundant Power Supply. Installation Guide.

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

XpressFill XF2500 Counter Pressure Filler. Operating Instructions

Performa Cv Twin Alternating and High Flow Systems. Manual Supplement

DF-550E PROCESS ANALYSERS APPLICATIONS FEATURES

MASK INTEGRITY TEST ACCESSORY (MITA) MODEL 8120

Pneumatic high-pressure controller Model CPC7000

Varian 325-MS LC/MS Quadrupole Mass Spectrometer Pre-installation Instructions

MODEL 269DF-LCF-LCF/WS FILLING SYSTEM

User Manual CFH PSI CFH PSI CFH PSI

GALISO SOAP OPTION FOR PCT-ADW-D

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

KGW - ISOTHERM. Operating Instructions. Level controlling device for liquid nitrogen LEVEL CONTROL LN2

water purification cylinders & accessories

Table of Contents. Sensor Calibration and Troubleshooting CDS4000 CO 2. Introduction 1. Handling Information. Calibration 2.

BUBBLER CONTROL SYSTEM

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

OPERATION MANUAL NTF-15

Installation, use and maintenance instructions. Gas burner (5)

USER GUIDE. Fog Generator. ATMOSPHERE APS Series Haze Generator. MAX APS Series. No: , Revision A/d

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

BUBBLER CONTROL SYSTEM

RAM 4021-DPX Operation Manual

MP15 Jockey Pump Controller

SANP ACTING RELAYS YT-520/525/530 SERIES

Valve test benches. Systems overview

J Air and Water Kit Instructions Part# 02584

LOCK UP VALVES YT-400/405/430/435 SERIES

CALIBRATION KIT. Instruction Manual

CCT-7320/ROC-2313 Reverse Osmosis Controller

RAM Operation Manual

Instruction Manual. PLT Series. 1. General Specification. 2. Installation. 3. Wiring. 4. Function. 5. Setting & Calibration

INSTALLATION, OPERATION, SERVICE & PARTS MANUAL FOR STOCK POT RANGE MODELS VSP100, VSP200 & VSP300

GASGUARD VENT LINE3 Ammonia Sensor OPERATING & INSTALLATION MANUAL

Maintenance Manual. Liquid Level Transmitter CT801-SI, CT801-TA

Budget Range Operators Handbook

UltraLo 1800 Alpha Particle Counter

Setup Guide for your HVO Naked Drone

User Manual MFCS TM -EZ

XpressFill XF4500C Counter Pressure Can Filler. Operating Instructions

GV Standard X-Vent. Setup, Commissioning & Installation Guide

User manual CF8-D/W-IN

Digital Tourniquets. Product Details. For electricity VAC, 50/60 Hz

KJ1000 Operating Instructions & Parts Manual NSN

Manifolds & pressure reducing sets

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Pneumatic High-Speed Pressure Controller Model CPC3000

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

OPERATION AND MAINTENANCE INSTRUCTION MANUAL

from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010

U S E R M A N U A L. Model: PM4300 Series SAVE THESE INSTRUCTIONS

MODELS (2 foot Version) (4 foot Version)

ST53SD. Self Contained Breathing Apparatus. User Manual

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin

KJ4000 Operating Instructions & Parts Manual NSN

Information Sheet. About this information sheet. Floor and wall loadings. Attachment of process module to floor. PlasmaPro Estrelas100

Transcription:

Precision (All B&W Screen Models) Installation Guide Precision Installation Guide Rev 5 PN IG-PREC-H2 28/03/18

Fittings Kit x1 US Mains Cable C13 6-15 04-1029* x2 Transit Plug 3301437 x1m Tygon Tubing 05-3131 x1 US Mains Cable C13 5-15 04-1039* x1** Barbed Fitting 05-7029 x1m ****Teflon Tubing 00-4411 x1 UK Mains Cable C13 04-1028 x1 ***4L Water Bottle 10-9016 x1 Deioniser Column 05-7062 Page 2 x1 EU Mains Cable C13 04-1038 * See Section 14, Regarding Connection Type ** Additional Barbed Fitting with 4L Water Bottle *** Optional Extra **** Precision Trace Only

1. Unpack the generator from the shipping crate and position on a flat surface, in desired area. CAUTION the weight of the unit constitutes a two man lift. Safe lifting practices are advised. 2. 7.5 cm 7.5 cm 7.5 cm Page 3 Ensure that there is at least 7.5 cm of space, to the sides and rear of the generator.

3. 3301437 Remove the two Transit Plugs from the H 2 and O 2 Vent ports located at the rear of the generator. 4. Trace Copper / Stainless Steel only Copper / Stainless Steel only Connect tubing, to the H2 Delivery port at the rear of the generator. Tubing must be clean grade copper or stainless steel only. Page 4

5. Connect the other end of the tubing to the Application. 6. Trace 00-4411 Fit appropriate tubing to H2 Exhaust output. For Trace models use the supplied Teflon Tubing. Flow from the exhaust is minimal during operation. Page 5

7. 05-7029 05-3131 The Tygon Tubing and Barbed Fitting supplied in the generator fittings kit should be connected to the Fill port at the rear of the generator. 8. If using a Peak Water Bottle, connect the remaining Barbed Fitting, from the fittings kit, to the other end of the Tygon Tubing. If using an alternative water bottle, connect the Tygon Tubing to your High Grade De-Ionised Water Supply (<1 µs/cm) and continue from step 13. Page 6

9. Remove the lid from the bottle by unscrewing anticlockwise and rinse the bottle with High Grade De-Ionised Water (<1 µs/cm). 10. After the bottle has been rinsed it should be filled with High Grade De-Ionised Water (<1 µs/cm). Page 7

11. Once the bottle has been filled, replace the lid. 12. Ensure the lid is securely fastened by turning it clockwise, and that the air-holes on the lid are free from obstruction. Page 8

13. Connect the Barbed Fitting on the end of the Tygon Tubing to the connection on the top of the filled Water Bottle, ensuring there is a secure connection. 14. Make sure the Water Bottle is on a level surface at the same height as the generator. Page 9

15. 04-1028 04-1029 04-1038 04-1039 Select the appropriate mains cable from the fittings kit and insert the IEC 60320/C13 plug into the mains input at the rear of the generator. Please note both 110V and 230V US cables have been supplied, ensure correct mains cable is used to match the rating on the generators serial plate. 16. 100-230VAC 50/60Hz Plug the mains cable into an appropriate 100-230VAC 50/60Hz single phase power supply. Page 10

17. Turn the generator on, using the switch on the back of the unit. 18. The touch HMI screen will illuminate and the start screen will be displayed. Page 11

19. Trace Peak Scientific Precision H 2 Trace PLC Software Version - *.** HMI Software Version - *.** Peak Scientific Precision H 2 PLC Software Version - *.** HMI Software Version - *.** The system will now run diagnostics and a leak detection test. Note: In the unlikely event that diagnostics are unsuccessful, an alarm will sound and a red failure screen will be displayed, complete with a mute button. The user is prompted at this point to contact their Peak service provider. 20. Trace DELIVERY PRESSURE - *.* BAR SYSTEM STAND-BY @ -*.* BAR SYSTEM STAND-BY % FLOW GEL LIFE - *** % USED START MENU START MENU Upon completion of the diagnostic checks, the home screen will be displayed. The user should now select MENU. Page 12

21. Trace CHANGE UNITS TO PSI CHANGE UNITS TO PSI SET PRESSURE -*.* BAR SET PRESSURE -*.* BAR BACK SHUT DOWN BACK SHUT DOWN The desired unit of measure and pressure should now be selected, by pressing the unit or pressure displayed. 22. Trace CHANGE UNITS TO BAR CHANGE UNITS TO BAR SET PRESSURE 75 PSI SET PRESSURE 75 PSI BACK SHUT DOWN BACK SHUT DOWN Once the desired unit of measure and pressure have been selected, pressing BACK will return the user to the home screen. Page 13

23. Trace DELIVERY PRESSURE - 75 PSI SYSTEM STAND-BY @ 75 PSI SYSTEM STAND-BY % FLOW GEL LIFE - *** % USED START MENU START MENU Pressing START will start the supply to the application. The unit may take a few minutes to adjust to the desired pressure. 24. Trace DELIVERY PRESSURE - 75 PSI SYSTEM RUNNING @ 75 PSI SYSTEM RUNNING % FLOW GEL LIFE - *** % USED STOP MENU STOP MENU The unit will now maintain the desired pressure, while the application is supplied. Page 14

25. Trace DELIVERY PRESSURE - 75 PSI SYSTEM RUNNING @ 75 PSI SYSTEM RUNNING % FLOW GEL LIFE - *** % USED STOP MENU STOP MENU The system can be stopped at any time by pressing STOP. This will return the generator to Standby mode. 26. Trace 24 Hours 12 Hours It is recommended that the unit is left to run for 12 hours () or 24 hours ( Trace) before utilisation. Page 15

27.. CONGRATULATIONS Your PEAK SCIENTIFIC gas generator is now fully installed, operational and ready to supply gas on demand to your instrument. Page 16

General Notes Ensure water supply bottle is not located above the height of the generator, and that the supply is not pressurised. ' ' Electrical requirements are 100-230V rms nominal. However, running continuously at voltages outwith this is not recommended. Extended periods at extremes can have a detrimental effect on the operation and life of the Generator. Ensure that all pipework between generator and equipment is checked for leaks. Please familiarise yourself with the full User Manual supplied at www.peakscientific. com. This includes all other technical specifications, operating instructions, service requirements, contact details and trouble shooting. It is very important to register your generator with PEAK SCIENTIFIC. This will initiate your warranty entitlement. Please use the form on the next page to register your generator. You will need the generators serial number which can be found on the serial label on the rear of the generator. Page 17

Go Online or Complete and Return You can register for your FREE 12 month Warranty with ease online at www.peakscientific.com/protected. Alternatively, you can send the completed form to Peak Scientific by post or email at warranty@peakscientific.com. Go Online or Complete and Return You can register for your FREE 12 month Warranty with ease online at www.peakscientific/protected. Alternatively, you can send the completed form to Peak Scientific by post or email at warranty@peakscientific.com. Product Warranty Registration Contact name Email address Company Address City/town Postcode Country Telephone Generator serial # Model type Installation date Do you still use an alternative gas solution i.e. Yes No cylinders or bulk liquid? What gas requirements do Nitrogen Zero Air you have in your lab? Extend your cover with Peak Scientific offer comprehensive gas generator after sales support packages. Peak [Protected] aftercare support can guarantee an on-site response within 72 hours*, genuine parts from our ISO9001 approved factory and a 95% first-time fix rate. See our enclosed Peak [Protected] leaflet for further information. Important! You have 1 month to register your Peak Scientific product from the date of installation. Once registered the warranty will be honoured for a period of 12 months. If you wish to defer the installation of your generator, you must notify Peak Scientific immediately by emailing warranty@peakscientific.com. For generators that remain unregistered after 1 month from the shipment date, the warranty will be considered active from the date of factory dispatch. * Complete Plan only Important! You have 1 month to register your Peak Scientific product from the date of installation. Once registered the warranty will be honoured for a period of 12 months. If you wish to defer the installation of your generator, you must notify Peak Scientific immediately by emailing warranty@peakscientific.com. For generators that remain unregistered after 1 month from the shipment date, the warranty will be considered active from the date of factory dispatch. Page 18

Page 19

Peak Scientific has highly trained, fully certified Field Service Engineers located in over 20 countries across every continent around the world. This allows us to provide an industry-leading rapid response service to our customers. With [Peak Protected], your laboratory s productivity becomes our top priority. To discuss Peak Protected generator cover and payment options speak to your local Peak Representative or for further information contact: protected@peakscientific.com Peak Scientific Fountain Crescent Inchinnan Business Park Inchinnan PA4 9RE Scotland, UK Tel: +44 141 812 8100 Fax: +44 141 812 8200 For further information on any of our generator products please contact marketing@peakscientific.com Precision Installation Guide Rev 5 PN IG-PREC-H2 28/03/18