Risk Assessment Examples

Similar documents
RISK ASSESSMENT Date Of Assessment:

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Tower Tours

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Lighting in and around church towers a guide for bell-ringers

RISK ASSESSMENT POLICY

Health and Safety Policy

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

Staff Contractors. Public. Staff Contractors

Charmborough Bells Risk Assessment and Method Statement

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Specific Risk Assessment Partyrocksbounce

HS26 Working at Height Policy and Procedure

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Working at Height

Hazard Injury Who at Risk Existing Control Measures Risk Score Further Control Measures Needed

Risk assessment (all vessel types)

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

The Yorkshire Waterways Museum, Dutch River Side, Goole, POND AND NATURE TRAIL RISK ASSESSMENT SHE/RA/00

Understanding health and safety in gas utilisation

Climbing Area. Review Completed by: Jamie Brunt Approved By: Steve Allard Date: June 2012

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

CUSTODIAL Safety Inspection Checklist

What we are already doing Working at Height comes within the framework of St. Matthew s Health and Safety and Fire arrangements policy

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT

A Checklist for a Health and Safety Risk Assessment

Checked / Validated* by: (3) Date: (1) Assessed by: (2) Location: (4) Assessment ref no (5) Review date: (6) 19/09/2011. E.J.Griffin.

Kettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall

Prevention of Falls and Working at Heights

Risk Assessment Checklist (Schools) Form Number F625d

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET

ACTIVITY RISK ASSESSMENT

Fall Protection PPT-SM-FALLPROT V.A.0.0

Hazard Identification and Risk Assessment Form. Risk Assessment

Abseiling Risk Management Plan Lutanda Yarramundi

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator

Risk Assessment. Appendix A contains

FALL PROTECTION GUIDELINE

University College Dublin Machinery/Equipment Risk Assessment Template

Hazard Injury Who at Risk Existing Control Measures Risk Score Further Control Measures Needed

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS

BICETSER RUFC HEALTH & SAFETY POLICY

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Risk Assessment (Worked Example)

Workplace Safety Inspection Sheet

FIRE HYDRANT TESTING METHOD STATEMENT.

GENERAL RISK ASSESSMENT FORM

Pre-control risk estimate. Likelihood Risk

December 2012 Safety Meeting. Fall Protection Answer Key 1. B 2. B 3. D 4. B 5. D 6. C 7. A 8. C 9. D 10. A KEY-SM-FALLPROT V.A.0.

2.0 Management Systems and Documentation

Risk Assessment Code of Practice

FALL PROTECTION / ELEVATED WORK

Morden Hall DHQ. Please record any problems or concerns you have about the DHQ so the Maintenance Team can deal with them

Hampstead Hill School Health and Safety Policy: Confined Spaces

S31 Opening Statement Working at Height

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Contractor handbook. Purpose

Defective Fixed Signals - Rules 1 to 6

Risk Assessment Form

HSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS

MOD Risk Assessment Form

CLUB RISK ASSESSMENT TEMPLATE

Generic Health and Safety Risk Assessment

RISK ASSESSMENT RECORD SHEET

HEALTH & SAFETY RISK ASSESSMENTS for

HEALTH AND SAFETY POLICY

Health and Safety Inspection Procedure

RISK Assessment & Management Plan

Group Guidance Risk Assessment Form

University of Lincoln Students Union Annual Risk Assessment for Activities

Rock Climbing Risk Management Plan Lutanda Yarramundi

Safe Use of Access Equipment

CHRISTIAN YOUTH CAMPS BURLEIGH HEADS MOUNTAIN BIKING

Powerplay Paintball Brighouse Risk Assessment

SOAS LONE WORKING GUIDANCE

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

High visibility jacket/tabard to be worn by all staff working on site and on the yard.

Safety Risk Assessment Hand and Power Tools

Contractor / Exhibitor Handbook

2000 lb manual winch

University risk assessment form and guidance notes. Oct 06

Exercise IARD. Risk Assessment & Management Plan

Grizedale Zip Trekking Adventure Risk Assessment

New OSHA Rescue Requirements for Confined Space Retrieval: What You Should Know

East roof, access via east staircase Risk Assessment Yes Ref no. EFM-RRA Date 04 May 2017

Slips, Trips, Falls Safety Meeting

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

CHRISTIAN YOUTH CAMPS BURLEIGH HEADS INDOOR ROCK CLIMBING

The NEC Group, Birmingham - RISK ASSESSMENT

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

Example of an Occupational Health Risk Assessment

Safety Risk Assessment

Risk Assessment & Safe Working Practice

THE UNIVERSITY OF SHEFFIELD ACCIDENT AND INCIDENT REPORTING AND INVESTIGATION POLICY AND PROCEDURES

To comply with the OHS Act, the responsible manager must carry out and document the following:

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

RISK ASSESSMENT: Education Directorate - basic guidance

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

Transcription:

Central Council of Church Bell Ringers "Registered Charity number 270036" Tower Stewardship Committee Risk Assessment Examples Two examples of a risk assessment, compiled specifically for use in a church bell ringing environment. Issue 1 Jan 2016 Risk Assessment Examples Page 1 of 12

Example 1 The following is a sample of a risk assessment, as used on the Ecclesiastical Insurance Group website. This example have been kindly provided by The Harry Windsor Ringing Centre The normal procedure is: 1. Identify the risk/hazard. 2. Identify the existing controls in use (ie keeping doors to the bell chamber locked). 3. Use the following to classify the risk Liklihood The likelihood of something happening Can be graded as: Severity The severity of injury if something does happening can be graded as: 1 = Low (seldom) 1 = Low (minor cuts and bruises) 2 = Medium (frequently) 2 = Medium (serious injury or incapacity for 3 or more days) 3 = High (certain or near certain) 3 = High (fatality or number of persons injured) Risk Rating Multiply the likelihood by the servierty to give a risk rating. 1 3 = low priority no action may be required 3 4 = medium priority additional controls may be nessecary 6 9 = high priority action must be taken to reduce the risk or stop the activity. Issue 1 Jan 2016 Risk Assessment Examples Page 2 of 12

Risk Details Under additional controls you should note the additional measures that are needed to reduce the risk to an acceptable level and record when they have been implemented. Hazards/risks/ persons affected Falling from Ladder to Clock Chamber Existing controls Likelihood Severity Risk Additional (L) (S) Rating (L x S) Controls 2 2 4 Access only by or in presence of nominated person who will give instruction and supervise. Lock on trapdoor to be changed to ensure three points of contact Padlock Falling from 2 2 4 Change to fixed lock Trapdoor Falling through 1 3 3 Fix part guardrail around top of trapdoor. Trapdoor Contractors/Visitors leaving bells in potentially dangerous 1 2 2 Nominated person to agree access by all contractors/visitors Nominated person to check after all visitors/contactors have been above ringing chamber level. state Hole in belfry Floor where old Clockcase 1 2 2 Verbal warning to all belfry visitors restore floorboards permanently was. Fire 1 3 3 Key of Balcony to be in door when tower in use. Extinguisher for Electric to be in ringing chamber. Move electric boxes from access. Unauthorised Access to tower falls, swinging bells etc. 2 2 2 Warning note on key safe key not to be used without permission of NG Power failure 1 2 2 Emergency Light in Ringing Chamber to be tested quarterly Slipping/Falling from Frame or on steps 1 2 2 Only nominated persons to work in tower alone and must have Mobile Phone Issue 1 Jan 2016 Risk Assessment Examples Page 3 of 12

Signed by: Assessor: Date Tower Captain: Date: Church Official: (I.e. Vicar, Church Warden, Health and Safety Officer) Date Agreeded Review Date: Copies to be kept in Ringing Chamber and Church Health and Safety File. Issue 1 Jan 2016 Risk Assessment Examples Page 4 of 12

Example 2 The following is a sample of a risk assessment, as used on the HSE website. This example has been kindly provided by The Kent County Association of Change Ringers CHURCH NAME: Name of Assessor: Date: What are the hazards? Who might be harmed and how? What is already being done? What further action is necessary? Action by who? Action by when? Date complete Security of the tower Access to tower Condition and lighting of external path Non ringers gaining access to the bells and ropes - major injuries from accidentally puling ropes or moving bells whilst up Ringers and visitors accessing the tower - slips and trips especially after dark Outside tower door locked and keys held only by tower captain and wardens Nothing Training to be given to wardens to ensure they understand the reasons why non ringers must not be allowed in the tower without prior agreement from the tower captain. Internal doors to ringing room, clock room and belfry to be locked and keys retained by tower captain and in ringing room PCC to consider external lighting Tower captain Steeplekeeper PCC Issue 1 Jan 2016 Risk Assessment Examples Page 5 of 12

Condition and lighting of stairs Ringers and visitors accessing the tower - slips and trips Lights well maintained Repairs to worn out treads on 1st 2 steps Installing new handrail/rope PCC Steeplekeeper and ringers Ringing room Getting caught up in moving ropes Ropes breaking near the sally and flailing around Non ringers, visitors, trainees, ringers whilst not ringing, ringers - potentially serious injuries varying from rope burns to being hauled up in the tower resulting in broken bones etc. All personnel in the area could become snagged by the ropes and suffer injuries as above Visitors and non ringers instructed not to touch ropes prior to entry. All persons not ringing instructed to keep feet firmly on the floor. Removal of loose clothing such as ties, scarves etc prior to ringing. Learners are closely supervised by competent instructor. Ropes are checked on a monthly basis as part of the regular tower maintenance. Mats installed to minimise wear on the tail ends. Issue 1 Jan 2016 Risk Assessment Examples Page 6 of 12

Stay breaking or similar mechanical failure Power cuts whilst in the process of ringing slips and trips on items on the floor Portable electrical equipment The ringer could be lifted off their feet as the bell 'goes over' and then dropped to the ground causing various injuries including major ones Loss of control of the ropes resulting in all personnel in the area at risk of becoming snagged by the ropes and suffer injuries as above All personnel could be injured by tripping over items on the floor All personnel could be injured by tripping over electrical leads or getting Ringers to be properly trained to avoid 'over pulling'. Steeplekeeper ensures all equipment around the bells is checked as part of the tower maintenance. Automatic emergency lighting in place enabling the bells to be safely stood or lowered General good housekeeping. Trailing leads not left in walking areas but tucked neatly behind furniture etc. All equipment regularly PAT tested Emergency lighting check to be added to monthly tower maintenance schedule Steeplekeeper Issue 1 Jan 2016 Risk Assessment Examples Page 7 of 12

electric shocks Clock Room Getting caught up in the ropes when the bells are ringing or when the bells are up and the ropes are disturbed Access to belfry Falling from wooden steps Belfry Getting caught up with moving bells, wheels etc Accidentally dislodging bells whilst up All personnel could become caught up in the ropes and suffer a variety of injuries including major ones Steeple keeper and other maintenance personnel could fall and suffer serious injuries All personnel - could result in multiple injuries or even fatalities All personnel - could result in multiple injuries or even fatalities Access door is locked and keys controlled by tower captain. Area only to be accessed when bells are down Steps in good condition and suitable handrail provided. Condition checked as part of steeplekeeper's 6-monthly checklist. Access door is locked and keys controlled by tower captain. Area only to be accessed when bells are down Access door is locked and keys controlled by tower captain. Area only to be accessed when bells are down Issue 1 Jan 2016 Risk Assessment Examples Page 8 of 12

Falling from frame into pit whilst carrying out maintenance, muffling bells etc Steeplekeeper and other ringers Avoid accessing area via frame as far as practical. Ensure steeple keeper is fit enough for task or obtain suitable assistance. Use additional 'crawling boards' where appropriate or for longer duration work. Tower captain/ steeplekeeper Noise from ringing bells Poor lighting Noise could cause permanent hearing damage Noise could cause imbalance and subsequent falls into moving bells Poor lighting could lead to all sorts of accidents Access door is locked and keys controlled by tower captain. Area only to be accessed when bells are down Access door is locked and keys controlled by tower captain. Area only to be accessed when bells are down PCC to consider improving lighting levels generally. Additional lighting to be installed when carrying out maintenance - lead lights etc Lone working Any accident involving anyone working on their own could result in any injuries becoming significantly worse through lack of immediate attention Lone working is not permitted under any circumstances, whether raising or lowering bells or for carrying out any form of maintenance. Issue 1 Jan 2016 Risk Assessment Examples Page 9 of 12

Asbestos Structural defects generally All personnel, but especially those involved in maintenance - breathing in of asbestos fibres could result in death Structural defects could affect anyone in the tower, but especially those carrying out maintenance in areas not normally accessed, resulting in major injuries Copy of the church's latest asbestos survey obtained and checked. All asbestos in good condition Steeplekeeper and ringers have been made aware of any defects identified in the Quinquennial Report that could affect them. Asbestos to be marked so all are aware of its location. Those involved with any form of maintenance to be aware of asbestos locations. Copies of other surveys and reports to be obtained. Structural defects to be remedied as soon as practical. Fire General storage area at the bottom of stairs contains combustible materials Portable electrical equipment is a potential source of fire Fire breaking out could trap ringers and others in the tower causing serious injuries/loss of life Fire breaking out could trap ringers and others in the tower causing All electrical equipment is PAT tested All combustible materials to be removed. Consideration to be given to find alternative escape route Steeple keeper to ensure cables etc are kept free from potential damage as part of monthly checks PCC and ringers Steeplekeeper Issue 1 Jan 2016 Risk Assessment Examples Page 10 of 12

serious injuries/loss of life Naked flames from candles etc Mains electrical cabling could start a fire Heating Heating boiler at the bottom of the tower and flue running up the inside of the tower Fire breaking out could trap ringers and others in the tower causing serious injuries/loss of life Fire breaking out could trap ringers and others in the tower causing serious injuries/loss of life Ringers could be trapped by fire - see Fire above Ringers and others in the tower could suffer from carbon monoxide poisoning resulting in loss of life All cabling checked as part of the church's regular maintenance Avoid use of candles or anything else with naked flames Ringers, visitors and maintenance personnel As above As above As above Boiler being regularly maintained Installation of CO monitor PCC Issue 1 Jan 2016 Risk Assessment Examples Page 11 of 12

Signed by: Assessor: Date Tower Captain: Church Official: (I.e. Vicar, Church Warden, Health and Safety Officer) Date: Date Agreeded Review Date: Copies to be kept in Ringing Chamber and Church Health and Safety File. Issue 1 Jan 2016 Risk Assessment Examples Page 12 of 12