Midfield Satellite Concourse (MSC)

Similar documents
REQUEST FOR QUOTATION 3-10-B037 METROPOLITAN WASHINGTON AIRPORT AUTHORITY SPRINKLER SYSTEM TESTING AND INSPECTION. July 22, 2010

OPTION 1: TWO-RUNWAY SYSTEM

SUPPLEMENTAL AGREEMENT NO. 24 TO THE AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN THE WICHITA AIRPORT AUTHORITY, OWNER, AND

FALL 2014 WORKSHOPS TAKEAWAYS

Airside Expansion at Lambert Field: The Blues in St. Louis. Tudor Masek December 6, Airport Systems Planning, Design, and Management

The Public Safety Complex Southampton MA. a critical time

UDB. Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

19th St/Oakland Station Modernization

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Rio Mills Rd/Berkmar Dr Extended Connection

VIRGINIA RAILWAY EXPRESS

PEDESTRIAN ACTION PLAN

Discussion on Super Splash USA. December 14, 2015

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

Public Meeting #1 January 30, 2018

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

2. Context. Existing framework. The context. The challenge. Transport Strategy

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development.

Project Budget and Schedule Status

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Pavement Management Report. City Council Meeting of May 21, 2013

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Technical Working Group November 15, 2017

Wellington Public Transport Spine Study

integrated action plan

2026 Olympic and Paralympic Winter Games Bid Book Overview

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Transit Signal Preemption and Priority Treatments

Thoreau Path Master Plan Final Draft. prepared for: The Boston Redevelopment Authority West End Community November 2007


Broad Street Bicycle Boulevard Design Guidelines

ANALYZING THE SHIP DISPOSAL OPTIONS

2017 SCRUM GUIDE CHANGES USES OF SCRUM (NEW SECTION) 2017 CONTENT CHANGES AND ADDITIONS

Sliding Hill Road - Widening (UPC )

to the Public Information Centre for the Downtown Traffic Study

#!! "$% ##! &! # '#! % $ #!

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

PHASE 1 WIND STUDIES REPORT

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

County of Fairfax, Virginia. Department of Transportation

Aquatic Concepts. July 23, 2018

BOARD OF AIRPORT COMMISSIONERS

New Orleans Municipal Yacht Harbor

Sacramento Grid 2.0. The Downtown Transportation Study

Fulton Market Streetscape

Sidewalkology A Path to Solving San Antonio s Sidewalk Problem

October 30 th, 2012 Committee of the Whole Meeting Cycling Task Force Recommendations BIKE RACKS

CHAPTER SIXTEEN THE MASTER PLAN. Oakland Alive

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

The Air Travel Value Proposition: Safer, Cheaper, Greener, Quieter and Fast

Rose Bowl Tenant Amendments UCLA Lease Tournament of Roses License. City Council Meeting December 16, 2013

TRANSPORTATION ELEMENT

PEDESTRIAN ACTION PLAN

Olympic Preparation Work of Beijing Capital International Airport. April, 2008

Community Task Force November 15, 2017

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

AGENDA STAFF REPORT. CEO CONCUR COUNTY COUNSEL REVIEW CLERK OF THE BOARD Pending Review Approved Agreement to Form Discussion 3 Votes Board Majority

Maywood Town Hall Meeting. May 4, 2016

APWA. Presenters. Joseph Shaffer, P.E. Director of Engineering for GCRTA Project Manager of ECTP

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

IFE Level 3 Diploma in Fire Science and Fire Safety

Superintendent s Proposed Capital Improvements Program. Fiscal Years (Revised January 14, 2019)

Virginia Beach Transit Extension Study Draft Environmental Impact Statement Town Center Alignment Alternative Public Informational Meetings September

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Application of Value Engineering The Crosstown Project

Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services

Moving Towards Complete Streets MMLOS Applications

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

C C C

Welcome. If you have any questions or comments on the project, please contact:

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

March 12, 2018 ADDENDUM #1 Northbrook Park District Request for Architectural Services Golf Course & Clubhouse Renovation

Public Hearing Tarrant County. October 11 th, 2012

Finance & Insurance Committee Item 8 February 12, 2018

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

BIKE PLAN CONTENTS GATEWAY

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

ELEMENT 11 TRANSPORTATION ELEMENT

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

North Coast Corridor:

Governor s Transportation Vision Panel

SECTION TRAFFIC REGULATIONS

Secondary Road Program

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

See Figure 38, Existing Nonmotorized Connections.

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Redondo Beach Boat Launch Ramp Facility

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018

New Brunswick Strategic Planning Proposal

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

Albany Shaker Road Corridor Study Public Meeting # 2

Transcription:

Los Angeles Midfield Satellite Concourse (MSC) 18 June 2015 Presented by: Roger A. Johnson, Deputy Executive Director

olos ï Angeles MIDFIELD SATELLITE CONCOURSE NORTH MSC North Overview LAWA is undergoing a multi -billion dollar modernization program at LAX to upgrade its facilities Development of the MSC Program is a major component of this program and will facilitate: - Closure of other gates for terminal renovations - Maintain number of available gates at LAX - Mitigate delays and customer inconvenience - Provide additional wide -body aircraft gates to serve current and future demand - Enhance and expand international travel through LAX

, Los Angeles MIDFIELD SA ELLITE CONCOURS MSC North Overview The MSC Program is envisioned as a multi -phased design and construction program Phase 1 design and construction includes - MSC North Concourse "Part A" Bradley West Gateway (Annex) Passenger and Utility UNN tunnels Utilities and Aircraft Apron l i 1 1 I.J +++ 1 PART `B' I PART `A' - 3

Los Angeles MIDFIELD SATELLITE C ONCOURSE NORTH MSC North Overview Project Goals -...create an enjoyable design experience that allows travelers to use and move intuitively within the airport...facilitate "Speed to Market" for gates...be architecturally complementary to Bradley West...create a "World Class" traveler experience...be the international gateway of choice for the West Coast

Los Angeles MIDFIELD SATELLITE C ONCOURSE NORTH MSC North Overview The Project Team was given three directives to complete: Validate the MSC North Program Complete Design to Budget Analysis Develop 3 Concept Designs Progress update provided on all three directives

0: Los Angeles MIDFIELD SATELLITE CONCOURSE AIRPORTS DEVPLOPMENI GROUP 1. Program Validation Project began with the evaluation of the planning documents provided in the Project Definition Book A Visioning Session was conducted with LAWA Executive Team to understand program priorities Top Priorities - - Elevate the Passenger experience - Maximize Revenue Generation - Provide Gate Flexibility - Be Operationally Efficient

Los Angeles AO AIRPORTS DEV1-1.OPME T GROUP MIDFIELD SATELLIT CONCOURSE NORTH 1. Program Validation Weekly work sessions held between LAWA Executive Team and TPJV Team to resolve planning and design challenges Decision Matrix developed to track conclusions - - Passenger Flow - Vertical Movement - Aircraft Fleet Mix - Gate & Boarding Circulation International Passenger Processing

Los Angeles MIDFIELD SATELLITE C ONCOURSE NORTH 2. Design to Budget TPJV estimated planning scope and Faithful & Gould provided independent estimate Process provided LAWA validation of TPJV estimate Scope of program was clarified during weekly LAWA Executive Team / TPJV meetings with decisions documented in Design Decisions Log TPJV updated cost of MSC North based on validated program TPJV validated design to budget cost

l World Los Angeles Airports MIDFIELD SATELLITE CONC U RSE NORTH 2. Design to Budget Hard Costs December -14 Design, Preconstruction, & Fee 92,695,169 Estimated Construction Costs 700,000,000 Midfield Satellite Concourse (MSC) 450,000,000 w /above MSC Gateway 40,000,000 w /above Passenger Tunnel 83,000,000 w /above Baggage /Utility Tunnel 43,000,000 w /above Airfield Improvements and Site Utilities 84,000,000 w /above Add for Reef Design Option Allowances - North Ext., Baggage Handling, Etc. 168,575,000 Sub Total Hard Costs - DB Contract Value * 961,270,169 Other Hard Costs - 110,085,875 Interdepartmental Orders (IDO) & PMO - DWP, LADBS, Etc. 65,000,000 w /above Construction Support Services 39,085,875 w /above Public Art 6,000,000 w /above Total Hard Costs 1,071,356,044 Soft Costs & Contingency Program Management / Design Review 69,486,000 Owner Contingency 96,127,017 Prior Related Costs - Planning, Environmental, Reports, Surveys 11,681,091 Total Soft Costs & Contingency 177,294,108 GRAND TOTAL MSC NORTH BUDGET 1,248,650,152 * DB Contract Value includes a design contingency of 12 %, escalation contingency of 9.25 %, and contractor contingency of 4% AIM NA

Los Angeles MIDFIELD SATELLITE CO COURSE NORTH MiPORTS DEVELOPMENT GROUP 3. Develop Concept Design Resolution of functional issues allowed development of design concepts - - Terminal planning to define passenger flow through the concourse - Finalize Aircraft Fleet Mix - Plan Development Site Gateway MSC North - Development of multiple architectural character studies - Refinement of three concepts 10

Los World Lrports MIDFIELD SA ELLITE CONCOU SE NORTH MtPORTS DEVELOPMENT GROUP r -/ PART `B' PART `A' PART `C' MSC - Full Build -Out 11

Los Angeles MIDFIELD SATELLITE CO COURSE N RTH JRPOR'FS DEVELOPMENT GROUP 00 I UNNtL-S I I CT- D0,r-;.,. J ly PART `B' PART `A' MSC - Initial Builct-=Ctut A HANARf

Los Angeles MIDFIELD SA ELLITE CO COURSE N RTH L 777_: U =1 L f TUNNELS D0 PART `B' - PART `A' MSC - Optional BuiltkOut

Los Angeles MIDFIELD SATELL TE CONCOURSE NORTH n :: S 'lll r H ß B A PAX ACCESS Legend SOH DWP VAULT IJ EGRESS IT LAWA SWITCH GEAR SECURE SECURE ELEV MECH SHAFT OPENING STERILE n STERILE ELEV VAULT MSC - Level 0

I Los Angeles MIDFIELD SATELLITE CONCOURSE NORTH o 11 27 7; 22 43 a 7 ta 71 75 B A A C' C' C STERILE BUS BAG MAKE -UP SECURE BUS I4 1 G Legend AIRLINE ORS BOH RESTBOOMS CIRC CONCESSION SUPPORT EGRESS FIRE E FIRE PUMP E CONTROL ELEC ROOM ROOM FREIGHT ELEV IT LOADING DOCK AREA MECH E RESTROOMS E SECURE SHAFT OPENING Room.SECUREELEV DSTERILE E STERILE ELEV MSC - Level 1

.! EGRESS li.iii. 3Sx$'1i41!t146x.,, Los Angeles CONCOURSE NORTH JRPOR'FS DEVELOPMENT GROUP n 42 43 44 IC 2 31.: A.i, 34 42 41 44. 54 55 55 57 57 59 71 ]2 Z. v4 i 6 A A C' _ I 1 I _ iit!;. 9á$ti;lp CONCOURSE R1iIE,^ i. -, Legend U ROH CSP SEARCH ROOM fl CLUe Loney CONCESSION CONCESSION SUPPORT PROMENADE LI SECURE SHAFT OPENING FREIGHT ELE,/ 0 MECH RESTROOMS SECURE ELEV HHOLOROOM H H STERILE CI STERILE REV MSC - Level 2

Los Angeles MIDFIELD SATELL TE CONCOURSE NORTH m -1 D T v a 5C 5- III 7., I:i 71 L IC 7.' 171 24 5,fi fi'l il 51 55 5L- B A A C' C. C `Ì JJ ij -- Mis':slíÌN IIlT:. ill :;, :.: STERILE A r- Legend BALCONY BOH H CLUB SPACE J EGRESS MECH OPEN TO BELOW RESTROOMSH STERILE ELEV STERILE MSC - Level 3

I World I_os Angeles Airports MIDFIELD SATELLITE CONCOURSE NORTH AREA INC *Eß BY u SQ FT Eco -system Concepts

Los Angeles MIDFIELD SATELLITE CO COURSE NORTH 3. Develop Concept Design Development of the concept design - - Exploration of contextual design influences - Design from inside -out: taking the passenger perspective - Continuation of `Ocean' theme set by Bradley West The `SWELL' The `WAVE' The `REEF' - Incorporation of Sustainable Design Practices

Los Angeles MIDFIELD SATELLITE CONCOURSE NORTH r VIEW OF SITE FROM NORTHWEST (WESTCHESTER PKWY)

e Los Angeles.00 I` JRPORîS DEVELOPMENT GROUP MIDFIELD SATELLITE CONCOURS THE `SWELL' - Inspired by precursor to the crashing wave THE `WAVE' THE `REEF' - Inspired by a cross current - Inspired by outlying rocks generating the wave

.. -,Irllrii;:i I ea.,' Los Angeles.4.0 r l 1 ' 1'"i :!l 7n í ' -: MIDFIELD SATELLITE CO COURSE --.- I"I a f lam= IR 1 i + ```I' 1/ 'i!; "Si. poi F!!wine: `- R.1 ' THE --`SWELL' 1ir 1 y.la THE `SWELL' - Inspired by precursor to the crashing wave THE `WAVE' THE `REEF' - Inspired by a cross current - Inspired by outlying rocks generating the wave

i World Los Angeles Airports MIDFIELD SATELLITE CON COURSE NORTH THE `SWELL' - Inspired by precursor to the crashing wave THE `WAVE' THE `REEF' - Inspired by a cross current - Inspired by outlying rocks generating the wave

ea.,' Los Angeles.00 JRPORîS DEVELOPMENT GROUP LD SATELLITE CO COURSE THE "SWELL" - VIEW TO SOUTHEAST

,* if n Los Angeles 400 AIRPORTS DEVELOPAÆMGROUP SATELLITE CONCO THE "WAVE" - VIEW TO SOUTHEAST

e Los Angeles..00 JRPORîS DEVELOPMENT GROUP LD SATELLITE CO COURSE THE "REEF" - VIEW TO SOUTHEAST

so ««,P Los Angeles SE NORTH THE "SWELL" - DETAIL VIEW 27

. ea.,' Los Angeles.00 JRPORîS DEVELOPMENT GROUP LD SATELLITE CO COURSE '` I ü 111 1!wn II i 1!; Ilr i.;,,.; -.:,. _'. >wÿ THE "WAVE" - DETAIL VIEW 28

e Los Angeles..00 JRPORîS DEVELOPMENT GROUP LD SATELLITE CO COURSE THE "REEF" - DETAIL VIEW 29

Los Angeles MIDFIELD SATELLITE CO COURSE NORTH ll THE "SWELL" - INTERIOR CONCESSION CORE

Los Angeles MIDFIELD SATEL ITE CONCOURSE NORTH im II= Mils IF THE "WAVE" - INTERIOR CONCESSION CORE 31

e Los Angeles.00 COURSE NORTH THE "REEF" - INTERIOR CONCESSION CORE 32

Los Angeles MIDFIELD SATELLITE CO COURSE NORTH rm THE "SWELL" - INTERIOR CONCESSION CORE 33

0 Los Angeles MENT GROUP MIDFIELD SATELLITE C ONCOURSE NORTH THE "WAVE" - INTERIOR CONCESSION CORE

,5,10 Los Angeles LD SATELLITE CO COURSE NORTH JRPORîS DEVELOPMENT GROUP THE "REEF" - INTERIOR CONCESSION CORE 35

: ort50los Angeles.4,04 MIDFI LD SATELLITE CO COURSE THE "SWELL" - INTERIOR CONCOURSE VIEW 36

elos Angeles 1 MIDFIELD SATELLITE CO COURSE NORTH THE "WAVE" - INTERIOR CONCOURSE VIEW 37

e Los Angeles..00 LD SATELLITE CO COURSE NORTH 1 i r THE "REEF" - INTERIOR CONCOURSE VIEW 38

Los Angeles MIDFIELD SATELLITE CONCOURSE NORTH Yr, CC Bradley West Y5 CD Va Y3 xie xi6 X15 M1ad x12.6 Gateway - Level 2

Los Angeles 1 MIDFIELD SATELL TE CONCOURSE NORTH Q Q Q C) L) CJ C) O o 0 0 O BRADLEY WEST - CUSTOMS INBOUND BAGGAGE SECURE Gateway - Level 1

Los World Lrports MIDFIELD SATELL TE CONCOURSE NORTH BRADLEY WEST - BAGGAGE CLAIM f7 o SECUR STERfEE Gateway - Level 0

s World Los Angeles Airports MIDFIELD SATELLITE CON COURSE NORTH GATEWAY - BRADLEY WEST SIMILAR ROOF FORM

Los Angeles MIDFIELD SA ELLITE CONCOURSE GATEWAY - BRADLEY WEST SIMILAR ROOF FORM

e Los World Lrports MIDFIELD SATELLITE CON COURSE NORTH W. GATEWAY- BRADLEY WEST EXTERIOR TERRACE

e World Los Angeles Airports MIDFIELD SATELLITE CON COURSE NORTH GATEWAY- INTERIOR ACCESS TO MSC

Los Angeles MIDFIELD SATELLITE CONCO GATEWAY - INTERIOR ACCESS FROM MSC

Los Angeles MIDFIELD SATELLITE C ONCOURSE NORTH MiPORTS DEVELOPMENT GROUP CONCEPT EVALUATION Concept Evaluations L' -=..- -.r ti, - Strategic Factors Concept 1 - Swell Concept 2 - Wave Concept 3 - Reef Complimentary to Bradley West S O w Complete Design at any Phase O Interior View / Wayfinding / Daylighting O Achieves Reasonable Operational I Maintenance Cost O Cost Ranking Overall Best Customer Experience Potential Most Favorable Public Reaction O O

Los Angeles MIDFIELD SATELLITE CONCO Staff Preference: - The "REEF" 10. LAX Los Angeles MIDFIELD SATELLITE CONCOURSE NORTH The "REEF" Concept June 18, 2015 ensler gkk

Los Angeles MIDFIELD SATELLITE CONCOU SE NORTH MSC North Scope Scop Required Scope Change Ramp Control Tower $12M to $15M - Required function to meet FAA directive - Visibility requirement to control ground movement of aircraft and vehicles - Can be incorporated into concourse footprint and building structure

Los Angeles MIDFIELD SATELLIT MSC North Scope Project Enhancements cop Additional Gate South of Core 1 - Provides 1 additional Group VI gate in Phase 1 and 2 additional Group V gates after the removal of the AA Hangar - Increases level of service - Gate remains operational during Phase 2 construction - Front load cost anticipated to be expended in Phase 2

5 Los Angeles.11 MIDFIELD SATEL LITE CONCOURSE NORTH MSC North Scope Project Enhancements MSC Gateway (annex) flat roof and Mezzanine MSC Gateway (annex) curved roof and Mezzanine Cost Range Base Cost $9M to $10.5M Flat roof as base design emulating gate boarding piers Enhanced roof more comparable to Bradley West in lieu of "add -on" Increased floor area for additional revenue generating space