COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Similar documents
Nitrous Oxide / Oxygen FLOOR MOUNTED OUTLET STATION Installation and Instructions

Compact Triple Cabinet Outlet Station Model B Installation and Operating Instructions

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

PC7-C Flowmeter O2/N2O Sedation Unit Instruction Manual

Installation and Maintenance Manual. Compact Medical Gas Outlets

2 CYLINDER MOBILE CART USER S MANUAL / INSTRUCTIONS

MOBILE E TANK STAND INSTALLATION AND INSTRUCTIONS

STANDARD FLOWMETER USER S MANUAL

Yoke Block Instruction Manual

PORTER INSTRUMENT COMPANY, INC.

Yoke Block Instruction Manual

Product Description 3 Cleaning and Lubricating 4 Inspection and Testing 4

Parker Hannifin Corporation Porter Instrument Division 245 Township Line Road Hatfield, PA USA Tel: Ref Rev.

Instruction Manual Updated 7/26/2011 Ver. 2.2

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

Pressure Dump Valve Service Kit for Series 2300 Units

Operation and Maintenance Manual for GENTEC Medical Gas Outlets

Installation and Maintenance Manual. Dual Medical Gas Outlets

MXR FLOWMETER USER S MANUAL

Hydraulic Piston Accumulators

Pressure Dump Valve Service Kit for Series 3000 Units

ABRASIVE REGULATOR II

Booster Pump PB4-60 Replacement Kits

Smooth Vent Valve. Series XVD XL XL Q D- XVD XGT CYV

MAINTENANCE PROCEDURE FOR X 650

Installation Instructions

1700ESL Kamvalok Coupler

RG1200 Service and Repair Manual

INSTALLATION INSTRUCTIONS 1/2 THERMOSTATIC VALVE AND TRIM

ABRASIVE REGULATOR II

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

// ADapters GUIDelines

Aquor House Hydrant V2

Porter Conscious Sedation Flowmeters and Bag Tee (Accessory)

INSTALLATION GUIDELINES

Installing ASI Umbilical Delivery Systems

Smooth Vent Valve. XVD Series

CART FOR CENTURION 1500+

NITRONOX SCAVENGER SYSTEM USER S MANUAL / INSTRUCTIONS

Smooth Vent Valve XVD. Series

User Instruction Manual

3/8" Dr. Air Butterfly Impact Wrench

JARVIS. Model CPE Hock and Neck Cutter EQUIPMENT... TABLE OF

Hydraulic Piston Accumulators

Installation Instructions for NP100 Series Nitrogen Control Panels

PANACEA P100 LOW PRESSURE USER MANUAL

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

DIGITAL MXR-D FLOWMETER USER S MANUAL

SERVICE INSTRUCTIONS

Anti-flood device Model B-1

Bermad Pressure Reducing. Model: 42T

12S 1st Stage. -Maintenance Procedure-

Model VR6 System. Installation, Operation & Maintenance

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

INSTALLATION INSTRUCTIONS

Installation Instructions

SCUBAPRO. Balanced Power Inflator

Halsey Taylor Owners Manual

3M Liqui-Cel EXF-10x28 Series Membrane Contactor with ANSI or JIS Connections with Integrated End Caps

Model: 43T. Bermad Pressure Relief Valve

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

LIQUIP DRYBREAK COUPLER. API800 Series MAINTENANCE INSTRUCTIONS

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

Halsey Taylor Owners Manual STOP!

LUBRICATOR ASSEMBLY AND OPERATING INSTRUCTIONS

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Medical Gas Control Panel

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

3M Liqui-Cel EXF-10x28 Series Membrane Contactor

INSTALLATION GUIDELINES

TECHNICAL TRAINING SS1

Helium-Oxygen Blender

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION

Air-Oxygen Blender. Service Manual. Model No. PM5200 Series PM5300 Series (shown)

Fiber Optic Lighted Bubbler Spillway Pot (DLP-45) Installation Manual

TECHNICAL DATA CAUTION

Product Information News

Replacing the Reverse Osmosis ( RO ) Membranes

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

UltRo Dual Flow Reverse Osmosis Water System

Equinox II USER MANUAL NITROUS OXIDE/ OXYGEN 50%/50% USER ADMINISTRATION SYSTEM 01EQ7000E DEMAND VALVE 01EQ7001E TABLE OF CONTENTS

FLEXAIR PNEUMATIC CONTROL VALVES

TECHNICAL DATA. Q = C v P S

Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!

APP pumps APP and APP Disassembling and assembling

PANACEA P200 STAINLESS STEEL USER MANUAL

H4802, H4802-1, H , and Pole Tampers

Operation Manual Piston Sensed Gas Pressure Regulators

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

PANACEA P125 USER MANUAL

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

Hydraulic Punch Drivers

TriPod Safety Coupler Installation & Operating Instructions for Models TP4, TP5, TP6, and TP7

CO2 Tank Conversion Kit P.N , P.N , and P.N

Pure Water Power Purification System 4-Stage RODI Operations Manual

AREA VALVE SERVICE UNITS

TECHNICAL DATA. Q= Cv S

Mounting and Operating Instructions EB 8546 EN. Type 4708 Supply Pressure Regulators. Translation of original instructions. Type Type

Transcription:

COMPACT TRIPLE WALL OUTLET STATION MODEL 6255-1 INSTALLATION AND OPERATING INSTRUCTIONS To assure safe operation and conformation to local fire codes, all Porter Outlet Stations are designed to be used with sedation delivery systems mounted inside walls and they meet or exceed the guidelines established by the National Fire Protection Association for Nonflammable Medical Gas Systems, NFPA 99. Copies of NFPA 99 or portions thereof may be obtained by writing to: National Fire Protection Association Batterymarch Park, Quincy, MA 02269-9904 Or call: 1-800-344-3555 See Page 3 and 6 for Dimensions The Porter Compact Triple Wall Outlet Station (6255-1) provides a quick, safe, and reliable method of connection to both Porter Sedation and Clean-Air outlet service. The 6255-1 provides all the service features of the Porter 6200-1 N 2 O/O 2 outlet station, and the Porter 5600-3 Clean-Air outlet station. Features include the cross+protection system to prevent unintentional misconnection to the central piping system. The outlet station utilizes a duplex connector which prevents the Nitrous Oxide from being connected unless the Oxygen is connected, and offers oxygen resuscitator quick connect compatibility. Compact stainless steel face plate is color coded for instant gas identification. A qualified plumber can install the outlet station by following the details listed in this brochure. STATION INSTALLATION INSTRUCTIONS 1. LOCATION: Select appropriate location for mounting station to a stud prior to installing drywall or wall board. Secure bracket (left or right side) to stud. (Figure 1) WARNING Porter, Outlet Stations utilize the cross+protection system. The copper tubing is diameter indexed; 3/8 O.D. for Nitrous Oxide and ½ for Oxygen. The cross+protection system is designed to prevent misconnection of Oxygen and Nitrous Oxide piping. DO NOT ATTEMPT TO CHANGE THE DIAMETERS! Tampering with the cross+protection system constitutes acceptance of liability by the installer. For your own protection, as well as that of the Doctor and the patients, use 3/8 O.D. tubing for all Nitrous Oxide lines and ½ O.D. tubing for all Oxygen lines. Figure 1 FM-962 Rev. D 11/21

WARNING Dental workers are exposed to N 2 O during administration of N 2 O/O 2 conscious sedation analgesia. NIOSH has recommended that exposures should be minimized. Contact NIOSH (1-800-35- NIOSH) to receive NIOSH Publications on Control of Nitrous Oxide in Dental Operatories. Exposure can be minimized by effective controls. National Institute for Occupational Safety and Health (NIOSH) publications state that controls, including System Maintenance, Ventilation and Work Practices can effectively reduce N 2 O concentrations in dental operations. Your Porter Scavenger System is an important part of the system of controls. 2. PIPING REQUIREMENTS 2.1. Sedation Outlet Connections (N 2 O/O 2 ) This portion of the 6255-1 outlet station has the option of unscrewing the gas block, (N 2 O/O 2 ) (Figure 2) from the support plate (three screws), inverting the block so the pipes may extend downward (Figure 3). 2.2. IMPORTANT: When remounting the blocks to the support plate use the lower set of holes on the plate (Figure 3) to insure the faceplate will line up. (Note: This is only when pipes are pointing down.) 2.3. Pipes can then be joined to their appropriate 3/8 OD tube for Nitrous Oxide, and ½ OD tube for Oxygen. (See section below.) 2.4. Central Suction Powered Systems: Determine the direction in which the piping is needed. 2.5. If the vacuum tube (1/2 OD) is required in the upward position, be aware that moisture could drain back into the tubing. It is recommended that a trap be used. 2.6. If the vacuum tube (1/2 OD) is required in the downward position, unscrew the vacuum block from the support pole (two screws), invert the block (Figure 4) and screw the vacuum block back onto the support plate. 2.7. IMPORTANT: When remounting the block to the support plate use the upper set of holes on the plate. (Note: This is only when pipe is pointing down.) Figure 2 Figure 3 2

3. DRYWALL OR WALL BOARD CUT-OUT AND STATION FIXTURING DETAILS 3.1. Closing up walls requires a 2 1/2 H. x 4 1/2 L. cut-out opening. See template diagram for actual cut-out outline on page 6. 3.2. Bracket opposite stud butts up to underside of drywall. 4. INSTALL THE GAS SUPPLY LINES: Figure 4 Note: The station is designed and intended to be used with gas supply lines installed using NFPA 99 guidelines, including a 150 PSI piping integrity test. Medical grade dry Nitrogen should be used as a forming gas while soldering. To prevent oxidation inside supply lines: (a) Use type K or L, pre-cleaned, degreased, capped copper tubing ONLY. (b) Use 3/8 O.D. for Nitrous Oxide, use ½ O.D. for Oxygen. DO NOT CHANGE TUBING DIAMETERS!! (c) All copper to copper joints are to be made using a brazing allow conforming to AWS Classification BcuP-5 (see AWS Std. A5.8). Flux shall not be used. (d) After connecting all gas lines, check the system for leaks with dry Nitrogen per NFPA 99, by performing a 150 psi, 24 hour piping integrity test (5 psi drop allowed). 5. Check for Crossed Lines. (Refer to NFPA Gas and Vacuum Systems Code for Type II Systems) (See cross+protection Warning in this brochure.) AFTER DRY WALL IS INSTALLED 6. Remove cover cap. Check to make sure leading edge of box is flush with dry wall. If mounting box is incorrectly aligned, loosen bracket mounting nuts with a 11/32 open end wrench, adjust to fit, re-tighten nuts. IMPORTANT NOTE: If installing with Model 2022 Slide Mount Bracket, set the leading edge of box out of the drywall to compensate for 2022 plate thickness. (Refer to LB-313) 7. Alignment and Adjustment for Front Plate Installation The Oxygen and Nitrous Oxide Valve Bodies are factory adjusted to allow for the back of the Front Plate to press against the metal surfaces of all three valve bodies. If adjustment is needed, follow these steps: 7.1. Rotate the Oxygen and Nitrous Oxide valve bodies so they both uniformly contact the back of the Front Plate. Oxygen has right hand threads and Nitrous Oxide has left hand threads. 7.2. Adjust the right hand thread vacuum valve body to align with the metal surfaces of the other valve bodies 3

8. Install Front Plate with the six 4-40 flat head screws. 9. Apply diameter indexed N 2 O/O 2 gas label in place over diameter indexed check valve connector bushings. Pull off center strip backing, and press label in place. Remove top and bottom backing strips, and finish securing label. 10. Connect an 8060 series duplex connector and hoses into the completely assembled Triple Outlet Station. Attach the other end of the hoses to a flowmeter and turn the flow control knobs to the off position and the on/off switch to the off position. 11. Leak test the entire system for working pressure leaks. Pressurize the sedation gas supply lines with 50 PSI. Observe any pressure decay overnight. This 50 PSI test with the flowmeter tubing connections in place tests the seal of the duplex connector extended into the o- rings of the outlet station primary check valves. (5 PSI drop allowed.) 12. Attach the appropriate vacuum lines from the rubber goods to the outlet station vacuum source via the quick connect (5602). CONNECTIONS TO FLOWMETER OPERATING INSTRUCTIONS Flowmeter Gas Supply Tubing and Vacuum Tubing is connected to the Triple Outlet Station via two quick connect couplers. The Porter 8060 series duplex connector simultaneously connects the Oxygen and Nitrous oxide tubing, and prevents the Nitrous Oxide from being connected unless the Oxygen is connected. The Porter 5602 vacuum quick connect with hose barb separately inserts into the vacuum check valve of the station. QUICK CONNECTING You may quick connect to the station when the system pressure is at its normal 50 PSI; the primary check valves seal this pressure. Both couplers have locating latches. Simply insert the couplers into the appropriate check valve and confirm the latch is in place behind the catch feature of the valve. A gentle tug on the coupler will confirm a stable latch position. Internally, within the primary check valve, an o-ring seals against a poppet. The same o-ring seals against the quick connect extensions upon insertion. Slide the latch out of position to remove the connector and the internal poppet will automatically move back into its sealing position. 4 OXYGEN RESUSCITATOR By removing the duplex connector, an oxygen resuscitator quick connect may be inserted into the oxygen station position. MAINTENANCE AND SERVICE Use Scavenging Monitor for N2O in the operatory to insure that controls are effective in achieving low levels of ppm (parts per million) exposure. Contact your Porter dealer for details on monitors and testing. Inspect and maintain the analgesia delivery system to prevent N2O leaks in all hoses, connections and fittings. Repair all leaks immediately. Opposite position for 5602 right angle vacuum quick connect hose barb: Reconfigure the fitting using the following steps if you need the barb to point in the opposite direction. Clip Reversal Instructions: 1. Note orientation of Clip on Assembly: Hold assembly with Hose Barb in the down position, and with the smooth post facing you. 1.1. Note the position of the clip on the assembly. This is important, as you will need to rotate the clip 180 from its original position. 2. Remove the Crescent Ring using the blade of a small flat blade screwdriver. 3. Lift the clip from the assembly, and as you do so, the spring will fall from the clip. 4. Slide the clip back onto the assembly in a position 180 from its original location. 5. As the clip is brought down onto the post, place the spring onto the pin (located on the clip), and tuck the opposite end into the pocket on the adapter body. 6. Again using a flat bladed screwdriver, push the Crescent Ring back into the groove on the post. Orient the Crescent Ring such that the opening in the ring faces away from the spring. 7. Actuate clip to ensure proper operation of the assembly.

MONTHLY CHECK Leak test the entire system for working pressure leaks. Connect an 8060 series duplex connector and hoses into the Triple Outlet Station. Attach the other end of the hoses to a flowmeter and turn the flow control knobs to the off position and the on/off switch to the off position. Pressurize the sedation gas supply lines with 50 PSI. Observe any pressure decay overnight. This 50 PSI test with the flowmeter tubing connections in place tests the seal of the duplex connector extended into the o-rings of the outlet station primary check valves. (5 PSI drop allowed.) SERVICE PRIMARY AND SECONDARY CHECK VALVE ASSEMBLIES The Oxygen and Nitrous Oxide primary and secondary check valve assemblies may be field disassembled and replaced. 1) Primary Check Valve Assembly O2 A-2689-000 N2O A-2690-000 2) Cartridge Body O2 B-2237-000 N2O B-2275-000 3) 016 O Ring PB-102-215 4) Secondary Check Valve Assembly A-2699-000 5) Compression Spring PB-115-63SS PRIMARY CHECK VALVE DISASSEMBLY INSTRUCTIONS SERVICE PRIMARY CHECK VALVE May be serviced with station pressurized to 50 PSI. 1. Remove front plate. Mounting screws are behind plate labels. 2. Unscrew the primary check valve assembly. Oxygen right hand threads; Nitrous Oxide left hand threads. Note: the secondary check valve will move into position and seal the 50 PSI of the station pressure as the primary check valve assembly is removed. WARNING Do not remove the cartridge body while servicing the primary check valve assembly. The secondary check valve cannot seal the 50 PSI pressure if the cartridge body is removed. 3. Replace the entire assembly. 4. Screw the replaced assembly into the cartridge body. 5. Alignment & Adjustment for Front Plate Installation The Oxygen and Nitrous Oxide Valve Bodies are factory adjusted to allow for the back of the Front Plate to press against the metal surfaces of all three valve bodies. If adjustment is needed, follow these steps: 5.1. Rotate the Oxygen and Nitrous Oxide valve bodies so they both uniformly contact the back of the Front Plate. Oxygen has right hand threads and Nitrous Oxide has left hand threads. 5.2. Adjust the right hand thread vacuum valve body to align with the metal surfaces of the other valve bodies. 6. Leak test the entire system for working pressure leaks per the Monthly Check. 5

SECONDARY CHECK VALVE DISASSEMBLY AND SERVICE INSTRUCTIONS WARNING To service the secondary check valve, first turn off pressure. Do not remove the cartridge body until the pressure is bled off. The secondary check valve cannot seal the 50 PSI pressure if the cartridge body is removed. 1. Turn off pressure at tanks in tank room. 2. Follow procedure to remove primary check valve assembly. 3. Depress secondary check valve further into station block using a small probe or screw driver to bleed off pressure. 4. Unscrew cartridge body out of the station block. 5. Take a small screw driver or needle nose pliers and insert into holes at the center of secondary check valve. Carefully remove check valve and spring. 6. Replace the 016 o-ring and secondary check valve parts as required and place in position for reassembly. 7. Screw in the cartridge body and tighten. 8. Screw in the primary check valve assembly and align and adjust for front plate installation. 9. Leak test the entire system for working pressure leaks per the Monthly Check. 6