Figure 1 BASIC AIRCRAFT PITOT-STATIC SYSTEM

Similar documents
1811G/H PITOT-STATIC TEST SET

PS-425 Pitot-Static/Air Data Tester

PITOT STATIC TEST EQUIPMENT PRODUCT CATALOG. Testing, Tools and Ground Support Equipment

PITOT-STATIC TEST SET

MODEL 6600 Rev. B4 USER'S MANUAL LAVERSAB INC., 505 GILLINGHAM LANE. SUGAR LAND TX (281) FAX: (281)

Pitot-Static System - Inspection/Check ICA Supplement

MODEL 6500 Rev. E USER'S MANUAL

MODEL 6500 Rev. F4 USER'S MANUAL LAVERSAB INC., 505 GILLINGHAM LANE SUGAR LAND TX, (281) FAX: (281)

SECTION 6-16 FLIGHT INSTRUMENTS

PS-525 Pitot-Static/Air Data Tester. OPERATION AND MAINTENANCE MANUAL For Models PS-525 and PS-525A

PS-525 Pitot-Static/Air Data Tester. OPERATION AND MAINTENANCE MANUAL For Models PS-525 and PS-525A

DMA AERO MPS38 VER 1.0 DMA- AERO. Ground Support Test Equipment. MPS 38 Air Data Test Set User Manual

Fresenius Medical Care North America Service Bulletin

SAI-340 Pilot Guide Osuna Road NE Suite 711 Albuquerque, NM Rev 3

Fokker 50 - Air Conditioning & Pressurization

Discuss: 1. Instrument Flight Checklist

Bearhawk #164 Three Sigma Checkout Report. Date: Mar 08. Objectives:

Subject: ALTITUDE REPORTING EQUIPMENT AND TRANSPONDER SYSTEM MAINTENANCE AND INSPECTION PRACTICES

DO NOT PRINT THIS PAGE

I2102 WORKSHEET. Planned Route: Takeoff: KNSE, RWY 32 Altitude: 12,000 Route: RADAR DEPARTURE. Syllabus Notes None. Special Syllabus Requirements None

Technical Knowledge and Aerostatics (Balloon) This syllabus presupposes a knowledge and understanding already attained at PPL level.

Attitude Instrument Flying and Aerodynamics

ENVIRONMENTAL CONTROL SYSTEM (ECS)

I2103 WORKSHEET. Planned Route: Takeoff: KNSE, RWY 32 Altitude: 12,000 Route: RADAR DEPARTURE. Syllabus Notes None

Flying The Boeing

MPS45 AIR DATA TEST SET

GENERAL AVIATION - CLIMBING

The ASV-2 is a 3 1/8 sunlight readable encoding altimeter, airspeed and wide range vertical speed indicator.

DBI version 002 User Manual US version Free Balloon Flight Instrument

S-Tec System 55 Autopilot

Installing ASI Umbilical Delivery Systems

Pressure Calibration Solutions

300 Held Drive Northampton Pa

PROCEDURES GUIDE CESSNA 172N SKYHAWK

PPL Exam 1 Working File. Where significant calculation/thinking is required.

628 Differential Pressure Decay Leak Tester

Operation Manual. Diaphragm Sensed Gas Pressure Regulators

Commercial Maneuvers for PA28RT-201

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

INSTALLATION AND OPERATING INSTRUCTIONS

PRESSURE COMPARATOR 10000PSI 700bar. Operator Instructions CRYSTAL. engineering corporation

Mountain Flying. the Mountains. challenging to do as long as we obey some long taught rules. and not above them?

The ASV-1 is a 2 1/4 sunlight readable encoding altimeter, airspeed and wide range vertical speed indicator.

S-TEC. Pilot s Operating Handbook

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

HOW WISE TECHNOLOGY WORKS INFICON Protec P3000 sensor powered by Wise Technology, consists of an evacuated gas cell covered by a quartz membrane.

Revision Number Revision Date Insertion Date/Initials 1 st Ed. Oct 26, 00 2nd Ed. Jan 15, 08

MPC1-D-1000/MPC1-D-3000 Manual Pressure Controller for Differential Pressure User s Manual

Flying The Boeing Advanced

VISO Manual. LARSEN & BRUSGAARD Mosevej Kirke Hyllinge, Denmark Phone: Fax:

RD(H)20/25 Pressure-Reducing Regulator User Manual

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Your safety and the safety of others are very important.

ADSE 735 Pitot Static Tester User Manual

NORMAL TAKEOFF PILOT TRAINING MANUAL KING AIR 200 SERIES OF AIRCRAFT

Learning. Goals Speeds. Air speed. the air ASI. figure 1. Page 1 of 6. Document : V1.1

Mass Spec will not Autotune

Pressure calibration. 20

Operation and Maintenance Manual for GENTEC Model 881VR Continuous/Intermittent Digital Suction Regulators

HYDRAULIC CYLINDER TEST

OPERATION MANUAL NTF-15

Kelowna Heat Blast Spring Hockey Tournament 2018 Tournament Rules

Protec P3000 (XL) Helium Sniffer Leak Detector

RK-IR Sample Draw Aspirator Adapter Operator s Manual

6890 GC Site Preparation

The Military CYPRES Quick Guide For Operators

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

ECHO MANUAL WARNING. L B A ltim e te rs. ECHO is a trademark of LB Altimeters, Denmark

The ALT-5 is a 2 1/4 (57mm) sunlight readable encoding altimeter and a wide range vertical speed indicator.

Flight Profiles are designed as a guideline. Power settings are recommended and subject to change based

BGA244 Binary Gas Analyzer

Stratomaster Extreme X Owner s manual

Concentrate Distribution System (Stand Mounted) A-CDS-70-X & A-CDS-TANK-X-ST Industrial Drive, Orlinda, TN 37141

Leak Checking Large Vacuum Chambers

36H SERIES Combination Gas Valve

5 Function Indicator. Outside Air Temperature (C) Outside Air Temperature (F) Pressure Altitude Density Altitude Aircraft Voltage STD TEMP SL 15000

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Easy Nest Kits. Installation Suggestions

CDS-2000 CO 2 Sensor Verification, Calibration, and Troubleshooting Bulletin

VIII.A. Straight and Level Flight

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

Beechcraft Duchess 76 Maneuver Notes

Digital Vacuum Regulator

CSA Sample Draw Aspirator Adapter Operator s Manual

Digital Tourniquets. Product Details. For electricity VAC, 50/60 Hz

CS Controlled Dissolved Gas assembly with optional CS Air Aspirator assembly. Installation and Operation information

BUBBLER CONTROL SYSTEM

Advisory Circular (AC)

GAS VALVE RETROFIT KIT Pull Through Tube Heater Models

Model 106 DPI "Micro-switch" Installation and Operating Instructions

Chamber Test Testing Theory

AcornVac Vacuum Plumbing Systems - Trouble Shooting Guide

CO2 Tank Conversion Kit P.N , P.N , and P.N

OPERATION INSTRUCTIONS

AIR CONDITIONING AND PRESSURIZATION CONTROLS AND INDICATORS

Constant Pressure Inlet (CCN) Operator Manual

Mountain Fury Mountain Search Flying Course Syllabus Fourth Sortie : High Altitude Search

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

Customer Responsibilities

Update to Airline Transport Pilot Test July 2010 Airline Transport Pilot Test Prep 2010

Transcription:

1. INTRODUCTION This competition is designed to test the skills of each participating team in their understanding of and ability to troubleshoot an aircraft Pitot- Static system. Barfield recommends participants fully understand a basic aircraft Pitot-Static system (shown below) and potential issues that could be found. The faults found during this procedure will test this knowledge. Figure 1 BASIC AIRCRAFT PITOT-STATIC SYSTEM To ensure Teams which have yet to compete in this competition do not gain an unfair advantage by observing the earlier competitors, Barfield may have unidentified members of our team monitoring spectators in the testing area. Any team members or associates to a team identified to be loitering in the Pitot-Static area may result in a 3 min penalty being assessed when the team actually completes the competition. This penalty may be done without a warning to the offending party found in the testing area and is at Barfield s, AMC and/or the judge s discretion.

2. INSTRUMENT CONFIGURATION SINGLE SYSTEM (PILOT & COPILOT) A. Airspeed 420 knot, Rate of Climb 6000 feet/min, Altimeter 50,000 feet 3. GOAL OF THE EXERCISE A. Leak test both Pitot and Static system and record results that are within tolerance level. B. Isolate, ID and Document trouble if found 4. ITEMS KNOWN GOOD A. Test Equipment and test equipment hoses B. Nav-Aids Adapters C. Pitot-Static Ports D. Both Manifolds for Pilot s side and interconnecting hoses to Pitot-Static probe E. Both Manifolds for Copilot s side and interconnecting hoses to Pitot-Static probe F. All plumbing on the rear of the bench 5. TOOLS A. Copy of Written Procedures B. Form 611-00052 Test Data Sheet for annotating the test results. C. DPS1000 Automated Air Data Tester. D. Tablet Computer for control of DPS1000 E. Set of Four known-good replacement hoses, PT1 (Red), PS1, PS2, PS3 (Blue) F. The Airspeed, VSI and Altitude indicators may include potential failures. If an instrument is determined to be unserviceable during testing the participants will inform the judge which indicator is damaged. G. 9/16 Wrench for replacing hoses.

Figure 2 PITOT-STATIC TEST BENCH

Pilot Airspeed Same Pilot VSI Pilot Altimeter Same Instrument Configuration for Co- Pilot Side Figure 3 Instrument and Plumbing PT1 Pilot Pitot Tube Plumbing PS1 Pilot Aspd Static Side Plumbing PS2 Pilot VSI Plumbing PS 3 Pilot Altimeter Plumbing Same Plumbing Configuration for Co- Pilot Side 6. TIMER: A. Starting: The Judge will start the timer to begin the event. The timer is started once the Control button on the DPS1000 is selected and the unit transitions into the control mode at the beginning of the Pitot Leak test procedure. B. Stopping: The Participants will press the timer button to stop the clock once the Static Leak Test has been successfully completed. Taking the system back down to ground is not necessary. A successful completion is defined as a leak test within the specified tolerances and the Value and Pass/Fail boxes on the 611-00052 have been filled in with data. Once the data has been filled stop the clock.

7. PITOT SYSTEM LEAK TEST A. Aircraft Preparation a) Insure the aircraft (bench) is safe at ground level with no trapped pressures or vacuums. B. Test Set Preparation a) Unit will be powered up and initialization is complete. b) Test Set is already safe at ground and in Leak Measure Mode. c) Hoses are already connected between Test Set and correct Nav-Aids adapters. C. Repairs: a) A problem could be experienced at any time during this procedure. If a problem is identified, then attempt to determine the likely failure using best troubleshooting practices or suggestions shown below. Attempt repairs by removing suspect hose(s) and replace with new hose(s) having same designators (PT1, PS1, PS2, PS3). The Airspeed, VSI and Altitude indicators may include potential failures. If the team suspects an instrument is the failed component, inform the judge which indicator is damaged. b) Never make or break any connections on the bench or to the test equipment unless the system is safe at ground. c) Be especially careful when unfastening hoses as there are always possible situations where trapped pressure could be present. d) The team will be assessed a time penalty for Not taking the system to ground before removing a hose and/or for each good hose that is replaced unnecessarily. D. Connecting Test Set a) Nav-Aid s Adapter already mounted on the Pitot probe under test. b) No other Connections are required.

Note: The test begins when the Control button on the DPS1000 is selected and the unit transitions into the control mode and ends when the final leak testing result for the Static Channel is completed. E. Test a) Fill in Team Name in the top box of TEST DATA SHEET P/N 611-00052. b) Press the Control button to begin testing. c) Continuously monitor gauges to verify correct indications. d) Configure Test Set to deliver 200 knots airspeed @ MAX 450 Kts.. e) Once 200 knots have been achieved configure Test Set for Leak Measure. f) Set the Leak Rate Timer for 00:00 Wait Time and 01:00 Leak time g) The Airspeed must not decrease by more than 2 knots in 1 minute. h) Record the test data on the Test Data Sheet form 611-00052 i) If the leak test passed, then proceed to Section 7 without returning airspeed to ground. j) If the leak test failed, then take the Test Set safely to 0 knot. DPS1000 operators can use the Go-To-Ground feature. k) Attempt to determine the likely failure using best troubleshooting practices or suggestions shown below. Attempt repairs by removing suspect hose(s) and replace with new hose(s) having same designators (PT1, PS1, PS2, PS3). If the team suspects an instrument is the failed component, inform the judge which indicator is damaged. CAUTION: Never make or break any connections on the bench or to the test equipment unless the system is safe at ground. Be especially careful when unfastening hoses as there are always possible situations where trapped pressure could be present. NOTE: NOTE: A problem could exist at the hose fittings or anywhere along the body of the hose. The team will be assessed a time penalty for each good hose that is replaced unnecessarily or incorrectly identifying a broken indicator. l) Repeat Section 7. E. c) through f). PITOT SYSTEM LEAK TEST as needed

F. Complete the Pass/Fail boxes on the Pitot Leak Test 200 Kt. procedure on form 611-00052. 8. STATIC SYSTEM LEAK TEST A. Aircraft Preparation a) Set Altitude Baro for 29.92 inhg. B. Test Set Preparation a) N/A C. Repairs: a) A problem could be experienced at any time during this procedure. If a problem is identified, then attempt to determine the likely failure using best troubleshooting practices or suggestions shown below. Attempt repairs by removing suspect hose(s) and replacing with new hose(s) having same designators (PT1, PS1, PS2, PS3). The Airspeed, VSI and Altitude indicators include potential failures. If an instrument is determined to be unserviceable during testing the participants will inform the judge which indicator is damaged.

b) Never make or break any connections on the bench or to the test equipment unless the system is safe at ground. c) Be especially careful when unfastening hoses as there are always possible situations where trapped pressure could be present. d) The team will be assessed a time penalty for Not taking the system to ground before removing a hose and/or for each good hose that is replaced unnecessarily. D. Connecting Test Set a) N/A E. Test a) Configure Test Set to deliver 4,000 feet elevation @ max 5000Ft/min ROC. b) Once 4,000 feet Altitude has been achieved then configure Test Set for Leak Measure. c) Set the Leak Rate Timer for 00:00 Wait Time and 01:00 Leak time d) The Altitude must not decrease by more than 100 feet in 1 minute. CAUTION: Observe instruments and be ready to resume control if necessary. e) Record the test data on the worksheet 64-611-00052. f) If the leak test passes then proceed to Section 9. g) If the leak test failed, then take the system safely to ambient pressure. The DPS1000 operators can use the Go To Ground feature. h) Attempt to determine the likely failure using best troubleshooting practices or suggestions shown below. Attempt repairs by removing suspect hose(s) and replacing with new hose(s) having same designators (PT1, PS1, PS2, PS3). If the team suspects an instrument is the failed component, inform the judge which indicator is damaged. CAUTION: Never make or break any connections on the bench or to the test equipment unless the system is safe at ground. Be especially careful when unfastening hoses as there are always possible situations where trapped pressure could be present. CAUTION: Never use Snoop on instruments, fittings, lines or hoses which are at vacuum.

NOTE: The team will be assessed a time penalty for each good hose that is replaced unnecessarily or incorrectly identifying a broken indicator. i) Repeat Section 8. E. a) through d) STATIC SYSTEM LEAK TEST as needed 9. COMPLETE THE PASS/FAIL BOXES ON THE STATIC LEAK TEST 5,000 FT. PROCEDURE ON FORM 611-00052 TEST DATA SHEET For Pitot-Static Work Bench P/N 611-00052 TEAM: Reference: Current revision of Test Plan 84-611-00052 STEP REQUIREMENT VALUE/Description TOL ± PASS FAIL 6.E. f) 7.D.e) Pitot Only Leak Test 200 kts Retest Results (if Needed) Static Leak Test 4,000 ft Retest Results (if Needed) 2 kts 100 ft/min Other Problems detected? 10. PRESS THE TIMER BUTTON TO STOP THE CLOCK UPON COMPLETING THE LEAK TEST

11. TIME ADJUSTMENTS/PENALTIES STEP REQUIREMENT VALUE Total Time Elapsed A Each corrective replacement after the second will add +1 Min per corrective action B Accurately diagnosing specific Failures found in tests - 1 Min deduction C D E Damage to indicators, Disqualification. Result will be 15 min, +other deductions above and +10 Min for damaging indicator. Not following test procedure or following any of the Cautions outlined in the procedure. Hose replacements do not show correct designator (PT1, PS1, PS2, PS3). Parts on an aircraft must always be replaced with the correct part numbers 15 Min +above addition + 10 Min + 2 Min Addition + 1 Min Addition F Missing any designated problems within test + 2 Min Addition G Other discrepancies as determined by Barfield Inspector. +2 Min per H Team members or associates identified to be loitering in the Pitot-Static area can be assessed a 3 min penalty by judges. + 3 Min Addition