STATE OF NEW YORK PUBLIC SERVICE COMMISSION. At a session of the Public Service Commission held in the City of Albany on August 20, 2003

Similar documents
BSR GPTC Z TR GM References and Reporting Page 1 of 8

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

Verification Of Calibration for Direct-Reading Portable Gas Monitors

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON

Questions & Answers About the Operate within Operate within IROLs Standard

1 Suburban Friendship League 2 3 Procedures and Processes SFL Team Rosters 4 (Effective March 9, 2018) OVERVIEW 8 9 The SFL Team Roster and

You Just Experienced an Electrical Failure, What Should You Do Next? By Don Genutis Hampton Tedder Technical Services

A GUIDE TO RISK ASSESSMENT IN SHIP OPERATIONS

TEXAS LOTTERY COMMISSION INTERNAL AUDIT DIVISION

PORTS AUSTRALIA. PRINCIPLES FOR GATHERING AND PROCESSING HYDROGRAPHIC INFORMATION IN AUSTRALIAN PORTS (Version 1.5 November 2012)

Infrared Thermography Inspection Guidelines. Date Issued:

Control of Hazardous Energy Lockout / Tagout Program

Outage Management System (OMS)

Traffic Calming Policy

R.H. Hobbs, Chair N.F. Nicholls, Commissioner October 6, 2006 L.A. O Hara, Commissioner O R D E R

Every things under control High-Integrity Pressure Protection System (HIPPS)

PUBLIC SERVICE ~ O~~ISSION OF WEST VIRGINIA CHARLESTON

AIR POLLUTION AND ENERGY EFFICIENCY. A transparent and reliable hull and propeller performance standard. Submitted by Clean Shipping Coalition (CSC)

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

System Operating Limit Definition and Exceedance Clarification

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

OBJECTIVE 6: FIELD RADIOLOGICAL MONITORING - AMBIENT RADIATION MONITORING

2017 LGA 191/192 & 195 Pipeline Safety Conference

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

165 FERC 61,161 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON TARIFF REVISIONS. (Issued November 26, 2018)

2600T Series Pressure Transmitters Plugged Impulse Line Detection Diagnostic. Pressure Measurement Engineered solutions for all applications

O&M MANUAL HIGHLIGHTS

Best Practice RBI Technology Process by SVT-PP SIMTECH

System Operating Limit Definition and Exceedance Clarification

Upgrading Vestas V47-660kW

TESTIMONY OF ROBERT C. KOTT ON BEHALF OF THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION

sdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzx

Permit-Required Confined Space Entry Program

Monitoring of Real-Time SOL and IROL Exceedances

FP15 Interface Valve. SIL Safety Manual. SIL SM.018 Rev 1. Compiled By : G. Elliott, Date: 30/10/2017. Innovative and Reliable Valve & Pump Solutions

AC : MEASUREMENT OF HYDROGEN IN HELIUM FLOW

RULES AND REGULATIONS OF THE BCSSGFHC

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Maryland Thoroughbred and Harness Horse Racing Tracks

126 FERC 61,182 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER REJECTING TARIFF FILINGS. (Issued February 27, 2009)

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power

* William A. Sala, Jr. John A. Roscher. Columbia Gas Transmission, LLC * Sorana Linder 700 Louisiana Street, Suite 700 Director, Regulated Services

Hydro Plant Risk Assessment Guide

Florida s Intersection Safety Implementation Plan (ISIP)

Monitoring of Real-Time SOL and IROL Exceedances

Enbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT

OMS Alerts with Milsoft IVR Written by: Darcy O Neal Presented by: Clayton Tucker

THE AMERICAN LEGION DEPARTMENT OF DELAWARE 2016 BASEBALL RULES

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

The Best Use of Lockout/Tagout and Control Reliable Circuits

Development and Evolution of an Asset Management Organization

TG GUIDELINES CONCERNING CALIBRATION INTERVALS AND RECALIBRATION

TRAFFIC IMPACT STUDY CRITERIA

CAS Guidance (CAS-G-004)

Bicyclist Signing Guidelines

FAQs: Confined Spaces in Residential Construction

University of Cincinnati. Radiation Safety Committee Operations Guidelines Statement of Policy (RSC Guidelines) RSC Guidelines (revision 5)

Market Simulation Fall 2014 Release

Lockout/Tagout Training Overview. Safety Fest 2013

3.1 TRAFFIC CALMING PROCESS SUMMARY

SYRACUSE UNIVERSITY HUMAN RESEARCH PROTECTION PROGRAM STANDARD OPERATING PROCEDURES

WindProspector TM Lockheed Martin Corporation

EVT * -Pro Electronic Valve Tester

TEXAS DEPARTMENT OF PUBLIC SAFETY Breath Alcohol Laboratory

TITLE 11. DEPARTMENT OF JUSTICE NOTICE OF PROPOSED RULEMAKING

Lockout / Tag out Program

INITIAL REPORTS RELATING TO ACCOUNTING SEPARATION OF TELSTRA

Institutional Review Board - Restriction s Impo sed

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance

Project Single Points of Failure

Kiefner & Associates, Inc.

Amendment 80 Non-AFA Trawl Gear Catcher/Processor

POWER Quantifying Correction Curve Uncertainty Through Empirical Methods

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

Do Benefits of OMS Apply to Ontario Utilities?

Student Population Projections By Residence. School Year 2016/2017 Report Projections 2017/ /27. Prepared by:

Calibration Requirements for Direct Reading Confined Space Gas Detectors

Fail Operational Controls for an Independent Metering Valve

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

Ultima. X Series Gas Monitor

Oldman 2 Wind Farm Limited

California Department of Fish and Wildlife Report to the International Pacific Halibut Commission on 2017 California Fisheries

In-Road Warning Lights: Revisiting Pedestrian Crosswalk Application Faisal Hamood, Emelinda M. Parentela, Zaki Mustafa and Crystal Killian

Outcome-based payment schemes: government s use of payment by results

CHAPTER 5 - SPECIAL UNIT GAMES

EAST VALLEY SENIORS TENNIS LEAGUE BY-LAWS. Revised March 25, 2014 BY-LAWS

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

The Right Invitation: A Comprehensive Research Study to Guide the Golf Industry to Meaningfully Increase Women s Golf Participation and Satisfaction

Rationale for FAC September 2017 August 2018

Start-up, Shutdown and Malfunction Plans. Norman L. Morrow Fresh Air Consulting

Ron Gibson, Senior Engineer Gary McCargar, Senior Engineer ONEOK Partners

UNIVERSITY OF TENNESSEE HEALTH SCIENCE CENTER INSTITUTIONAL REVIEW BOARD CONTINUING REVIEW OF RESEARCH

MIL-STD-883G METHOD

Title: Standard Operating Procedure for R&R Environmental Devices Model MFC201 Gas Dilution Calibrator

Critical Systems Validation

FDA > CDRH > CFR Title 21 Database Search. Registration Listing Adverse Events Advisory Committees. 21 CFR Part 56

Occupational Safety and Health Administration

TERMS OF REFERENCE. 1. Background

PROVING THAT BLADDER SURGE TANKS CURED EXCESSIVE SURGE CONDITIONS IN A 30 FORCE MAIN

Transcription:

STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held in the City of Albany on August 20, 2003 COMMISSIONERS PRESENT: William M. Flynn, Chairman Thomas J. Dunleavy James D. Bennett Leonard A. Weiss Neal N. Galvin CASE 00-E-1273 - Proceeding on Motion of the Commission as to the Rates, Charges, Rules and Regulations of Central Hudson Gas and Electric Corporation for Electric Service. ORDER STAYING RELIABILITY TARGETS AND RATE ADJUSTMENTS (Issued and Effective September 29, 2003) BY THE COMMISSION: BACKGROUND In the Order Establishing Rates issued October 25, 2001 in this proceeding, electric reliability service quality standards were established for Central Hudson Gas and Electric Corporation (Central Hudson). Under the standards, electric service reliability targets are set, measured by the System Average Interruption Frequency Index (SAIFI) and Customer Average Interruption Duration Index (CAIDI). A failure to meet either the SAIFI or the CAIDI target results in a rate adjustment, assessed in basis points calculated from the utility s return on equity. For the SAIFI target, exceeding an index value of 1.10 results in a 6.5 basis point rate adjustment, and exceeding a value of 1.20 results in a 12.5 basis point rate adjustment.

For the CAIDI target, exceeding index values of 2.10 and 2.20 triggers the same respective basis point rate adjustments. Under the Order Establishing Rates, however, the reliability targets were subject to reevaluation upon Central Hudson s installation of a new Outage Management System (OMS) for the collection and reporting of the outage data upon which the SAIFI and CAIDI indices are based. Reevaluation was deemed warranted if improvements in data collection following installation of OMS indicated a deterioration in reliability performance attributable to better data collection and analysis rather than to declining performance. In a petition dated March 31, 2003, Central Hudson requests that the review provided for under the Order Establishing Rates be initiated and that it be excused from a rate adjustment that would otherwise be imposed for failure to meet a SAIFI target. THE PETITION The installation of the new, computerized OMS system, Central Hudson claims, could suggest declines in its reliability performance even if no deterioration occurred. OMS-induced improvements in outage tracking over the previous, paper-based systems, the utility asserts, could result in the reporting of more and longer outages. Central Hudson presents data it believes demonstrates that OMS has had that effect, artificially inflating its reliability indices. According to the utility, its SAIFI index for 2002 would have been 0.95 under its previous reporting methods, but data collected upon installation of OMS yielded a 2002 value of 1.23. Programmed into OMS, Central Hudson relates, is a model of the utility s distribution system, enabling the computer to trace an outage path from individual services to substation breakers. The model combines that data with other -2-

data obtained from customers notifying the utility of the outage to arrive at a total customer interruption count. The model also predicts the type and location of the distribution equipment that is out of service based on the customer reporting and breaker operation information. Detailing the differences between its prior information gathering system and OMS, Central Hudson explains that, prior to 2001, outages were recorded in a transmission and distribution system (TDS) computer program that compiled data field crews entered by hand onto pre-prepared forms after completion of outage restoration work. 1 The information from the forms was manually transcribed and entered into TDS. An estimate of the number of customers affected by an outage was then calculated from the TDS data and analysis of maps delineating the utility s system and the locations of its customers. Both the TDS and OMS systems for compiling outage data, Central Hudson reports, were in place during calendar year 2002, with the TDS system enhanced by customer counts taken from OMS rather than from system maps. The utility adds that OMS was deployed to cross-check TDS data in an effort to identify interruptions that line crew field reports may have missed. According to Central Hudson, its experience with both systems in place demonstrates that OMS captures more service interruptions than the TDS system. 2 The additional outage data, the utility 1 During 2001, the paper forms were replaced with portable, handheld computers that could electronically stream field crew data entries directly into TDS. 2 Central Hudson cites a study presented to the IEEE on July 22, 2002 for the proposition that automated outage systems routinely track outages better than systems that are not automated. -3-

maintains, drove the 29% increase in its 2002 OMS-based SAIFI value over the 2001 TDS-based value. Central Hudson states it is investigating OMS reporting capabilities further. Field crews, the utility relates, often find that OMS has not accurately predicted the actual electrical device that was interrupted or failed, but the computer system does not allow for correction of such an error. Moreover, Central Hudson contends that OMS tends to exaggerate the extent of an outage and the number of customers it actually affects. Central Hudson stresses that OMS has assisted it in improving outage management since it was installed. The utility claims, however, the improvement in reliability has been masked by the changes in data collection and analysis attending installation of OMS, paradoxically resulting in the higher SAIFI value for 2002 over 2001. Consequently, the utility contends, the 2002 SAIFI value does not properly reflect its reliability performance, and no revenue adjustment should be imposed. According to Central Hudson, the SAIFI reliability criteria for future years must be revisited and revised, to recognize the effects of OMS-induced changes. The new criteria, the utility contends, should reflect the data collection constraints and characteristics of the OMS system. 3 DISCUSSION AND CONCLUSION The discrepancies between the outage interruption data Central Hudson gathered under TDS and the outage interruption reports OMS generates are substantial. In the utility s Poughkeepsie district, 682 interruptions were reported under the traditional TDS tracking method for calendar year 2002. Cross- 3 The utility would develop the new criteria through consultation with the parties, with additional procedures imposed only if the parties cannot agree. -4-

checking that data to OMS information, however, raised the number of total interruptions for the year to 1,700, an increase of about 149%. Although the disparities in this region were greater than in any of Central Hudson s four other operating districts, the divergence demonstrates that the two methods of data reporting are not comparable. 4 While the introduction of OMS highlights the inadequacies in the TDS method, the accuracy and reliability of the OMS system has not been verified. Central Hudson reports it is investigating the operation of the OMS system. That investigation should continue. We expect the utility to correct any deficiencies uncovered as quickly as possible, to otherwise improve the accuracy of OMS data compilations, and to promptly and regularly apprise Staff of the utility s efforts and results. The deficiencies in historic TDS data exposed upon installation of OMS undermine the basis for both the reliability targets and the rate adjustments directed in the Order Establishing Rates. It appears Central Hudson s reliance on field report inputs to TDS has historically yielded inaccurate outage information, rendering suspect the SAIFI and CAIDI index values previously relied upon. Central Hudson should have periodically reassessed its TDS methodology to ascertain if it was capturing all relevant interruption data. Given the uncertainties posed by the TDS data, the SAIFI and CAIDI reliability targets and rate adjustments directed in the Order Establishing Rates lack an adequate foundation, and modifications may be appropriate. Before 4 The utility contends it was known that OMS would yield higher outage figures, but its citation to only one subjective study, unsupported by empirical evidence, does not satisfactorily explain the discrepancies between TDS and OMS data output or the actual performance of the OMS system. -5-

modifications can be justified, however, an inquiry into the effects of the OMS system is required, including the extent to which the OMS SAIFI value for 2002 may be attributed to improved data collection. Consequently, further analysis of Central Hudson s reliability targets and rate adjustments is needed. Accordingly, the existing Central Hudson electric service reliability standards are stayed, for calendar years 2002 and 2003, and through the end of Central Hudson s Rate Plan on June 30, 2004. For these time periods, we direct Staff to propose modifications, to the extent appropriate, to the existing SAIFI and CAIDI reliability targets, after an assessment of the reliability statistics developed subsequent to the introduction of the OMS system. The Staff proposal will include analysis of whether rate adjustments are warranted and should be imposed after this stay ends. 5 The Commission orders: 1. The System Average Interruption Frequency Index and Customer Average Interruption Duration Index reliability targets established under the Order Establishing Rates issued October 25, 2001 in this proceeding, and the revenue adjustments imposed for failure to meet the reliability targets, are stayed until such time as is otherwise directed, subject to the discussion in the body of this Order. 2. This proceeding is continued. By the Commission, (SIGNED) JACLYN A. BRILLING Acting Secretary 5 Further procedures for establishing and implementing any needed modifications to the reliability targets and rate adjustments will be determined at a later time. -6-