SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

Similar documents
PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

ATTACHMENT "A" ULTIMATE IMPLEMENTATION DESCRIPTION

State of the System Report. Agenda. Trends Summary. Corridor Analysis. Safety Analysis

Space Coast Transportation Planning Organization. Agenda

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

2012 PRIORITY TRANSPORTATION PROJECTS

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Chapter 5 Future Transportation

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

February 11, 2016 TPO Board Presentation

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

2725 Judge Fran Jamieson Way, Bldg. B Viera, Florida Telephone: (321) Fax: (321)

C C C

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

Welcome to the Quebec Alternatives Analysis Public Meeting

FDOT Treasure Coast Traffic Report

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Financial Project ID No(s).: and ETDM No(s).: and 14181

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

City of Bartow Comprehensive Plan. Transportation Element

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Reams Road RCA Study. Board of County Commissioners Public Hearing

FDOT Treasure Coast Traffic Report

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024

VIII. Project Prioritization & Implementation

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Welcome to the Sellwood Bridge Project Open House!

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

NEWMARKET UPHAM S CORNER

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Public Involvement Kickoff Meeting. April 29, 2015

Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

CITY OF LANCASTER PROPOSED NEW PROJECTS

Project Description Form 8EE

TRAFFIC SAFETY. City of Cocoa Beach, Florida

TRASBURG RANSPORTATION

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Pennsylvania Avenue (CR 484) Design Alternatives Study

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

2016 TELL THE TPO SURVEY

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

TRANSPORTATION & MOBILITY

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

PAT Meeting #2 Future Alternatives Meeting Agenda

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

FM #: ETDM #: 11241

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

Orange County s Transportation Planning and Multimodal Corridor Plan

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

AIR FORCE TECHNICAL APPLICATIONS CENTER VISIT

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

LANE ELIMINATION PROJECTS

FDOT Treasure Coast Traffic Impact Report

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

5. RUNNINGWAY GUIDELINES

Hollywood/Pines Boulevard Multimodal Corridor Study

Alaskan Way, Promenade, and Overlook Walk Final EIS

ARRENTON RANSPORTATION

UNFUNDED PRIORITY PROJECTS

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

Safe Streets. City of Lake Forest Park. March 21, 2017

PRESS RELEASE San Joaquin Council of Governments

Section 5: Bike and Pedestrian

Performance Criteria for 2035 Long Range Transportation Plan

Application of a Complete Street

FDOT Treasure Coast Traffic Impact Report

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

PEDESTRIAN ACTION PLAN

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Plant City Walk-Bike Plan

Brevard County Local Residential Market Metrics - Q Townhouses and Condos Municipalities and Census-Designated Places*

Transcription:

A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT FISCAL YEAR, FDOT PROJECT NO SIS FUNDS 1 1 ELLIS ROAD WIDENING at I-95 ETEND/WIDEN ELLIS ROAD CONNECTION TO WICKHAM DESIGN/DRAINAGE ANALYSIS UNDERWAY ROW $35M FY 20 - FY 23 (4269054) CST 2 2 I-95 INTERCHANGES (COUNTYWIDE) 3a 3b 4a (NEW) 3a 3b SR 528 (BEACHLINE) WIDENING (TURNPIKE ENTERPRISE SECTION) SR 528 (BEACHLINE) WIDENING (FDOT SECTION) 405 BRIDGE REPLACEMENT / NASA CAUSEWAY CONTINUE IMPLEMENTATION OF SYSTEM OPERATIONS IMPROVEMENT REPORT (SOAR) AS NEEDED THROUGH SAFETY NEEDS WIDEN TO 8 LANES FROM SR 520 TO I-95 AND 6 LANES FROM I-95 TO SR 524 (INDUSTRY ROAD) W/ MANAGED TOLL LANES AND GENERAL PURPOSE WIDEN TO 6L FROM SR 524 TO PORT CANAVERAL INTCH (W/ GENERAL PURPOSE AND MANAGED TOLL LANES) INCLUDING RECREATIONAL TRAIL AND AMENITIES FROM INDUSTRY RD TO SR 401 INTERCHANGE SOAR UPDATE UNDERWAY; NORTH & SOUTH SJHP INTERCHANGES; VIERA BLVD / PINEDA (FULLY FUNDED) DES, ROW, CST AS NEEDED PD&E RE-EVALUATION (4371811) DESIGN DESIGN UNDERWAY(4074023, 4074024) ROW & CST REPLACEMENT OF NASA CAUSEWAY BRIDGE PD&E (4404241) DESIGN & CST 4b 4 SPACE COMMERCE WAY WIDEN 2 TO 4 LANES AT EPLORATION PARK W/ INTERSECTIONS TO INCLUDE MULTI-USE TRAIL TRAFFIC STUDY UNDERWAY (KSC VISITOR COMPLE) DESIGN/BUILD 5 5 SR 401 CORRIDOR CORRIDOR ACTION PLAN FROM SR 401 INTERCHANGE TO CAPE CANAVERAL AIR FORCE STATION/BRIDGE REPLACEMENT ALTERNATIVES EVALUATION REPORT SIS CONNECTOR STUDY REGARDING PORT ACTIVITY PAGE 1 OF 8

A(2). OTHER SIS MODES - RAIL MELBOURNE INTERNATIONAL AIRPORT FREIGHT RAIL IMPROVEMENTS AND OFF-LOAD: BULK CARGO, CONTAINER BOES, TRAILERS FOR SEMI-TRUCKS: INTERMODAL SIS FACILITY TO TRANSPORT FREIGHT TO AND FROM BOTH MELBOURNE AIRPORT AND I-95 SIS FUNDS DESIGN CST Rail projects are not in any priority order COCOA/ROCKLEDGE PASSENGER RAIL STATION - AMTRACK MELBOURNE PASSENGER RAIL STATION - AMTRACK TO BE LOCATED IN EISTING BUILDING AT THE SOUTHWEST INTERSECTION OF ROSA L JONES DRIVE AND US 1 TO BE LOCATED IN DOWNTOWN MELBOURNE, FRONTING STRAWBRIDGE AVE, ADJACENT TO NEW CITY PARKING STRUCTURE AND ONE BLOCK FROM MAIN STREET FEASIBILITY STUDY / PD&E DESIGN & CST FEASIBILITY STUDY / PD&E DESIGN & CST TITUSVILLE PASSENGER RAIL STATION - AMTRACK TO BE LOCATED AT FORMER STATION BUILDING IN HISTORIC DOWNTOWN TITUSVILLE ON PINE STREET FEASIBILITY STUDY / PD&E DESIGN & CST PAGE 2 OF 8

A(3). Canaveral Port Authority FY /2019 - Prioritized Project Listing Priority Project Name 1 North Cargo Berth 3 and 4 2 New Cruise Terminal - Southside 3 North Cargo Berth 8 - RoRo, ConRo, RailRo Major Upgrades and Improvements of Port Cargo Buildings and Cold Storage 4 Facilities 5 North Cargo Area Tanker/Multipurpose Berth 6 Cargo Pier Improvements (SCP 1 and 4) 7 Container and Multipurpose Berth & Terminal-Phase3 (30 Acres) Road Access to Cruise and Cargo Terminals to Include the North-South access 8 Road from NCB5/6 to Space Hab 9 Maintenance Dredging 10 North Cargo Berth 5 Crane Rail System 11 New Post Panamax Container Cranes (2) 12 Rail Connectivity Ph1 to FEC-Intermodal on Dock Rail 13 Cove Phase 3 Rework of Glen Cheek 14 Widen West Turn Basin at Entrance Channel & Offshore & Deepening 15 SR401 Road and Bridge Structure Improvements PAGE 3 OF 8

Revised Table 6.1 Recommended Projects CCSMP Amendment 1 (June 1, ) (last updated 4/25/17) STATE FISCAL YEAR 2011-2016 -2022 2019-2023 2023 PROPOSED 5TH YEAR FDOT FUNDING PLANNED FUNDING FDOT FUNDING ACTUAL FDOT FUNDING ACTUAL PLANNED FUNDING STRATEGIC OBJECTIVES PROGRAMMED REQUIREMENTS (6 YEARS) (1 YEAR) REQUIREMENTS (5 YEARS) (5 YEARS) ( 1 YEAR) $5,000,000 $5,000,000 ADVANCE COMMERCIAL HEAVY LIFT CAPABILITY SUPPORT COMMERCIAL CREW AND CARGO PROCESSING & RANGE IMPROVEMENTS & NEW EMERGING SPACE SYSTEMS EPAND HORIZONTAL LAUNCH/LAND CAPABILITY INCREASE SPACE LAUNCH CAPACITY STATEWIDE STATE OF FLORIDA COMMON USE SPACEPORT INFRASTRUCTURE LC 39A LC 39A $16,400,000 $9,600,000 LC 36 LC 36 $700,000 CCS $5,000,000 LC 40 $20,000,000 C3PF $6,150,000 LC 41 $10,000,000 Exploration Park $9,000,000 OPF 1&2 $1,850,000 LC 17/18 $322,500 $23,900,000 - SLF ASSESSMENT SLF/HORZ IMPROVEMENTS - - - $5,000,000 $14,000,000 $235,800,000 $47,000,000 LC46 A(4). Space Transportation Improvement Program Cape Canaveral Spaceport Master Plan - STATE OF FLORIDA COMMON USE SPACEPORT INFRASTRUCTURE** $497,800,000 Launch Complex Improvements and Commercial Crew/Cargo $8,900,000 $33,600,000 $123,150,000 SPACECRAFT INTEGRATION FACILITY - $34,000,000 Launch Complex Improvements and Commercial Crew/Cargo PROCESSING & RANGE FACILITY IMPROVEMENTS PROCESSING & RANGE FACILITY IMPROVEMENTS HORIZONTAL LAUNCH / LANDING FACILITIES STATE OF FLORIDA COMMON USE SPACEPORT INFRASTRUCTURE** $50,000,000 Launch Complex Improvements and Commercial Crew/Cargo $12,000,000 PROCESSING & RANGE FACILITY IMPROVEMENTS* $165,925,352 $17,000,000 HORIZONTAL LAUNCH / LANDING FACILITIES STATE OF FLORIDA COMMON USE SPACEPORT INFRASTRUCTURE** TOTALS $79,422,500 $23,500,000 $105,500,000 $1,022,675,352 $126,000,000 ANNUAL AVERAGE (ECLUDING MATCH) $13,237,083 $23,500,000 $21,100,000 $102,267,535 $126,000,000 * Assumes 50% match ** Assumes no match for State Common Use Infrastructure PAGE 4 OF 8

B. REGIONALLY SIGNIFICANT FACILITIES (NON SIS) State and Federal (SU) (TA) 1 1 ST. JOHN'S HERITAGE PKWY (PHASE II) US 192 TO ELLIS ROAD INTERCHANGE ROW (COUNTY) CST ($4.9 Local Match / $4.9 CIGP) (4283464) 2 2 US 192 AND HOLLYWOOD BLVD/EVANS INTERSECTION IMPROVEMENTS TURN LANE ADDITIONS FEASIBILITY STUDY COMPLETE DESIGN UNDERWAY (4336551) ROW FY 20 $4.8M CST SR A1A CORRIDOR STUDY - IMPLEMENT STUDY RECOMMENDATIONS FROM PINEDA CAUSEWAY TO PORT 3 3 FEASIBILITY STUDY COMPLETE (4302021) CANAVERAL (SEE BELOW) 3a 3a SR 520 & A1A INTERSECTION IMPROVEMENTS DESIGN FY 17 (4302024) CST SR A1A FROM SOUTH OF INTERNATIONAL DRIVE TO LONG POINT ROAD (INCLUDES REALIGNMENT OF 3b 3b DESIGN FY 18(4302025) ROW, CST INTERNATIONAL DRIVE) 3c 3c SR A1A STREETSCAPING IMPROVEMENTS FROM N 2ND STREET TO SUNFLOWER STREET DESIGN, CST 3d 3d SR A1A FROM SR 520 TO INTERNATIONAL DRIVE - SIDEWALK WIDENING AND REPLACEMENT DESIGN, CST 3e 3e SR A1A FROM SUNFLOWER STREET TO MARION LANE - WIDEN SIDEWALK TO 8FT. DESIGN, CST 3f 3f SR A1A FROM LONG POINT DRIVE TO GEORGE KING BLVD - INSTALL MEDIAN / CURB AND GUTTER DRAINAGE ANALYSIS, DESIGN 3g 3g SR A1A FROM N LIMITS OF PATRICK AFB TO 16TH STREET - 8FT SIDEWALK EASTSIDE DESIGN, ROW,CST 3h 3h SR A1A SIDEWALK EASTSIDE - PINEDA CSWY TO PAFB NORTHERN LIMIT (S OF SHERRY LEE LANE) CORRIDOR STUDY UNDERWAY DESIGN, CST 3i (NEW) SR A1A INSTALL CROSSWALKS FROM 1 ST STREET SOUTH TO 1ST STREET NORTH (1 BLOCK N & S OF MINUTEMEN CSWY) STUDY, DESIGN, CST 3j (NEW) SR A1A NB (ATLANTIC AVE) INSTALL CURB & GUTTER TO INCLUDE PARKING SPACES FROM 2ND STREET NORTH TO 4TH STREET NORTH DRAINAGE ANALYSIS, DESIGN, CST 3k (NEW) SR A1A SB (SOUTH ORLANDO AVENUE) SIDEWALK GAP FROM 7TH STREET SOUTH TO 6TH STREET SOUTH DESIGN, ROW, CST PAGE 5 OF 8

B. REGIONALLY SIGNIFICANT FACILITIES (NON SIS) State and Federal (SU) (TA) 4 4 BABCOCK ST (SR 507) WIDEN TO 6 LANES/INTERSEC IMPROV FROM MALABAR RD (SR 514) TO PALM BAY RD (CR 516) DESIGN COMPLETE; ROW FY 20-22 ($32.9M) (2376506) CST 5 6 SR 501 (CLEARLAKE) ADD LANES FROM MICHIGAN AVENUE TO INDUSTRY RD PD&E COMPLETE(4336051) DESIGN UNDERWAY ($2M) ROW (State Only) 6 5 MALABAR RD (SR 514) WIDEN TO 4 LANES FROM BABCOCK (SR 507) TO US 1 PD&E UNDERWAY; DESIGN FY 20 ($4 M) (4301361) ROW (State Only) 7 7 SR 524 S. FRIDAY ROAD TO INDUSTRY RD CORRIDOR STUDY UNDERWAY PD&E FY 19 ($1.7 M) (4379831) DESIGN 8 (NEW) US 1 ADD LANES FROM PINEDA CSWY (SR 404) TO PARK AVE PD&E 9 (NEW) SR 3 (COURTENAY PKWY) PHASE 1 - CATALINA ISLE DRIVE TO VENETIAN WAY SIDEWALKS; BUS STOPS; CORRIDOR LIGHTING; PEDESTRIAN CROSSWALKS CORRIDOR PLANNING STUDY COMPLETE FROM FORTENBERRY TO GRANT/SMITH RD DRAINAGE ANALYSIS, DESIGN, CST 10 (NEW) SR 520 US 1 TO EAST CITY LIMITS (INDIAN RIVER) SHORT TERM: BIKE/PED TRANSIT IMPROVEMENTS LONG TERM: ROADWAY RECONFIGURATION / ROUNDABOUT AT RIVEREDGE BLVD; ELIMINATE RIGHT TURN SLIP LANE AT US 1 CORRIDOR PLANNING STUDY COMPLETE DESIGN & CST 11 8 WASHINGTONIA ETENSION NEW 2L/4L ROAD RUNNING PARALLEL AND WEST OF I-95 CONNECTING ELLIS RD TO PINEDA PD&E FY 18 (4363701) DESIGN 12 9 MALABAR RD WIDEN TO 4 LANES FROM SJHP PKWY TO MINTON PHS 1 - MINTON TO JUPITER; PHS 2 - JUPITER TO PKWY PRELIMINARY ENGINEERING STUDY (CITY) PD&E FY 20 ($500K TRIP / $500K LF) (4372101) RIGHT OF WAY (CITY) DESIGN 13 10 BABCOCK ST SJHP TO MALABAR RD PD&E FY 18 (4372041) Design FY 20 ($1.5M TRIP / $1.5M LF) ROW 14 (NEW) ST. JOHN'S HERITAGE PKWY NEW ROAD CAPACITY FROM BABCOCK TO MALABAR ROAD PD&E TRANSPORTATION SYSTEM MANAGEMENT AND OPERATIONS (TSM&O) 15 11 ITS OPERATIONAL SUPPORT OPERATIONAL SUPPORT OF THE COUNTYWIDE ATMS SU FUNDING (4289301) $225,000 SET-ASIDE FY 18 - FY 22 $225,000 FY 22 16 12 TRAFFIC MANAGEMENT CENTER (TMC) CONSTRUCT REGIONAL TRAFFIC MANGEMENT CENTER DESIGN, CST PAGE 6 OF 8

B. REGIONALLY SIGNIFICANT FACILITIES (NON SIS) State and Federal (SU) (TA) 17 13 US 1 ITS EPANSION PROJECT BABCOCK STREET TO UNIVERSITY AVENUE DESIGN, CST 18 14 US 192 ITS EPANSION PROJECT DAIRY ROAD TO US 1 DESIGN, CST 19 15 SR 507 (BABCOCK) ITS EPANSION PROJECT NASA BLVD TO EBER ROAD DESIGN, CST 20 16 SR 3 (COURTENAY) ITS EPANSION PROJECT SR 520 TO HALL ROAD DESIGN, CST CORRIDOR PLANNING STUDIES 21 17 SR 507 BABCOCK ST CORRIDOR STUDY PALM BAY ROAD TO US 192 CORRIDOR PLANNING STUDY 22 (NEW) SR 520 WEST CORRIDOR STUDY FROM SR 524 TO 360' EAST OF AURORA ROAD (OPERATIONAL, SAFETY & MULTIMODAL IMPROVEMENTS) CORRIDOR PLANNING STUDY 23 21 SR 406 (GARDEN STREET) CORRIDOR STUDY ADULT EDUCATION CNTR (W OF I-95) TO NB US 1(WASHINGTON) PLANNING STUDY PHASE 1 COMPLETE; NET STEP CONCEPT DEVELOPMENT IMPLEMENT FINDINGS OF STUDY 24 22 US 1 (WASHINGTON AVE) CORRIDOR STUDY LAUREL PLACE TO INDIAN RIVER AVENUE PLANNING STUDY PHASE 1 COMPLETE; NET STEP CONCEPT DEVELOPMENT IMPLEMENT FINDINGS OF STUDY 25 23 SR 518 (EAU GALLIE BLVD) CORRIDOR STUDY EAU GALLIE CAUSEWAY TO SR A1A PLANNING STUDY PHASE 1 COMPLETE; NET STEP CONCEPT DEVELOPMENT IMPLEMENT FINDINGS OF STUDY 26 24 SR 519 (FISKE BLVD) CORRIDOR STUDY BARNES BLVD TO SR 520 PLANNING STUDY PHASE 1 COMPLETE; NET STEP CONCEPT DEVELOPMENT IMPLEMENT FINDINGS OF STUDY REGIONAL TRAILS (SUNTRAIL) 27 29 SPACE COAST TRAIL (TIER 1 & 2) PLAYALINDA RD WEST END (MERRITT ISLAND WILDLIFE REFUGE ENTRANCE) TO ATLANTIC OCEAN TO US 1 (VOLUSIA COUNTY) PD&E UNDERWAY DESIGN FY 22 (4370931) CST 28 30 EAST COAST GREENWAY / US1 (TIER 3) SR 50 TO GRACE- TRAIL EASTSIDE OF US1 FEASIBILITY STUDY COMPLETE DESIGN, CST 29 31 EAST COAST GREENWAY / NORTH MERRITT ISLAND PIONEER TRAIL FEASIBILITY STUDY(TIER 3) SR 528 TO FEDERAL LANDS ON NORTH MERRITT ISLAND FEASIBILITY STUDY PAGE 7 OF 8

B. REGIONALLY SIGNIFICANT FACILITIES (NON SIS) State and Federal (SU) (TA) PEDESTRIAN AND BICYCLE IMPROVEMENTS (STATE HIGHWAY SYSTEM AND OFF SHS) 30 33 SR A1A SIDEWALK / INDIAN HARBOUR BEACH WESTSIDE SIDEWALK FROM SR 518 (EAU GALLIE BLVD) TO VOLUNTEER WAY FEASIBILITY STUDY COMPLETE DESIGN 31 32 US 1 SIDEWALK GRAN AVENUE/PORT MALABAR SOUTHWEST SIDEWALK EASTSIDE FEASIBILITY STUDY DESIGN, CST 32 33 US 1 SIDEWALK KIRKLAND TO RJ CONLAN SOUTHWEST SIDEWALK EASTSIDE FEASIBILITY STUDY DESIGN, CST 33 25 COCOA SIDEWALK CONNECTORS CONNECTIONS FOR DION BLVD, FORREST AVE AND VARR AVE IN COCOA DESIGN (CITY OF COCOA) CST 34 JOHN RODES BLVD SIDEWALK EAU GALLIE BLVD TO BEND AT AURORA (8FT SIDEWALK/MULTI-USE PATH) DESIGN & CST 35 PORT ST. JOHN BICYCLE, PEDESTRIAN & TRANSIT CONNECTIVITY FEASIBILITY STUDY FROM CAMP RD TO THE S, I-95 TO THE W, TO TITUSVILLE TO THE N, INDIAN RIVER LAGOON TO THE EAST FEASIBILITY STUDY 36(NEW) MELBOURNE CITYWIDE SCHOOL SAFETY STUDY TRAFFIC SAFETY AUDIT WITHIN 2 MILES OF EDUCATION FACILITIES STUDY 37 27 FISKE BLVD SIDEWALK FROM SR 520 TO DION DESIGN UNDERWAY (CITY OF COCOA) CST 38 28 SW MELBOURNE CANAL SYSTEM TRAIL BABCOCK STREET TO DAIRY ROAD AND FLORIDA AVENUE TO EBER ROAD DESIGN, CST 39 30 M-1 CANAL TRAIL US 192 TO EVANS ROAD DESIGN, CST 40 31 PINEDA ST SIDEWALK FROM EISTING SIDEWALK ON PINEDA AVE / ETEND FROM SCHOOL ST. TO BRISTOL AVE. POSSIBLE SR2S, DESIGN PAGE 8 OF 8