The Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

Similar documents
The Impact of Composites on Future Deepwater Riser Configurations

FPSO Riser Solutions for Harsh environments

Risers for Deepwater FPSO s

RIGID RISERS FOR TANKER FPSOs

Feasibility of Steel Lazy Wave Risers in the North Sea

A New Thermoplastic Composite Riser for Deepwater Application

Development of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7

Grouped SLOR Deep Water Riser System and Installation Assessment

Design Challenges & Solutions for Large Diameter Export Risers

Time-domain Nonlinear Coupled Analyses Covering Typical Mooring and Riser Configurations for FPSOs

Learn more at

Learn more at

Learn more at

Catenary Offset Buoyant Riser Assembly for Malaysian Deepwater

Deepwater Floating Production Systems An Overview

Introduction. DEEPWATER DRILLING RISER INTEGRITY - FATIGUE, WEAR, INSPECTION AND MONITORING by Dr Hugh Howells and Dave Walters 2H Offshore Inc

Top Tensioned Riser Challenges and Solutions for Dry Tree Facilities in Asia Pacific

Flexible Spools Solution at Hybrid Risers Base A. Karnikian, Total and S. Tarbadar, M. Bonnissel, S. Legeay, Technip France

Global Buckling Design for Flexible Flowlines

Re-usable Riser and Flowline System for Deep Water Application. C. DIEUMEGARD SUBSEA ASIA - 11 th June 2008

Proceedings of the ASME th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011

17J Third Edition, January 2008 Specification for Unbonded Flexible Pipe

Steel Lazy Wave Risers A Step Change in Riser Technology for the NWS

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Learn more at

Edit this text for your title

MECHANICAL ASPECTS OF SUBMARINE CABLE ARMOUR

Deepwater Challenges Pipeline Installation Case

STRIDE PROJECT Steel Risers in Deepwater Environments Achievements

DEEP WATER DRILLING RISER TECHNOLOGY, VIV & FATIGUE MANAGEMENT

Wellhead, Conductor and Casing Fatigue Causes and Mitigation Tze King Lim, Elizabeth Tellier, Hugh Howells 2H Offshore Engineering

RPSEA UDW Forum June 22 & 23, Secure Energy for America

Comparison and Sensitivity Investigations of a CALM and SALM Type Mooring System for Wave Energy Converters


ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES

Comparison of Steel Tubes and Thermoplastic Hoses in Umbilical Service

Next Generation Thermoplastic Hose

THE USE OF SPIN FIN PILES IN MASSACHUSETTS

ASPIRE for Integrity Management Support for Upstream Assets. Payam Jamshidi, TWI Ltd Sebastian Hartmann, Innospection Ltd

Subsea Wellhead and Conductor Fatigue

DIFFERENT SOLUTIONS TO INSPECT PLATFORM RISERS. By R van Agthoven and H Quakkelsteijn, ApplusRTD, Rotterdam, The Netherlands

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

Umbilicals Experience and Challenges, Tie Back installations

Fully Submersible Heavy Lift Vessel

Innovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.

Field Development & Construction

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

The SDS Skip. Subsea Deployment Systems Ltd.

INSTRUCTIONS FOR THE USE OF ROTARY DRILLING, VIBRATOR AND CEMENT HOSES

Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development

Use equation for the cylindrical section and equation or for the ends.

Fully Submersible Heavy Lift Vessel

Design and manufacturing basalt and carbon fiber road bike frame.

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

BRINGING A NEW DIMENSION TO PIPELINE PIGGING. By: David Aitken, Aubin Group, UK

Tapered Roller Bearings in X-life quality Customer Information. Business Unit TRB Schweinfurt, 2013

Minimal Structures for Marginal Nova Scotia Developments

Rapidmain Installation Guide

Moorings and Foundations Catalogue, Deliverable 5.1 December 2016

Corrugated Hose Loop Calculations

OPENINGS AND REINFORCEMENTS 26

SUBSEA HYBRID RISER SYSTEMS

E02 Rigid hinged stinger with piggyback line

Site-Specific Assessment of Jack-Ups Part 1: Jack-Up Basics & Why We Do Site-Specific Assessments

Internal riser inspections on FPSO storage & production facilities

Permanent buoyancy systems. matrix composites & engineering

Completion Workover Riser System. Enabling efficient operations by reducing interface complexities and minimizes operational risk

A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

INSTRUCTIONS FOR THE USE OF LONG LENGTH AND SPLICED HOSES

Assistant Lecturer Anees Kadhum AL Saadi

Offshore engineering science

Learn more at

Cathodic Protection Retrofit Options Comparison of Current Distribution

SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology

LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN

INSTRUMENTATION TUBING

from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010

TLP Minimum tendon tension design and tendon down-stroke investigation

Level MEASUREMENT 1/2016

Scissor Mechanisms. Figure 1 Torero Cabin Service Truck. Scissor Mechanism was chassis mounted and lifted the cabin to service aircraft

RELIABILITY ASSESSMENT, STATIC AND DYNAMIC RESPONSE OF TRANSMISSION LINE TOWER: A COMPARATIVE STUDY

A NEW DEEPWATER TANKER LOADING SYSTEM FOR WEST AFRICA

TARPON A Minimal Facilities Platform

Technip Presentation. Deep Water Umbilicals Challenges. & Technology Solutions. Ian Probyn R&D Business Development Manager

Technical Briefing Note

Intro r duct u io i n o - 3 -

The TURTLE Concept Contents:

APPENDIX D Oil Loading Pipeline - Options

PLEASE NOTE: Pressures for 200mm (8ins) and 250mm (10ins) are based on the use of METALFLEX Braided Braid

WELCOME to CAUx Local India 2018

Special Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in.

PROVEN, RELIABLE PRODUCTS FROM A TRUSTED PARTNER Samson Heavy-Lift Slings

Drilling riser buoyancy systems. matrix composites and engineering

INTERLOCKED METAL HOSE

Risks Associated with Caissons on Ageing Offshore Facilities

The topics I will briefly cover, are; Stack Configurations Wellhead Connector Considerations Control Systems Tensioning Systems will be discussed by

Intelligent Traffic Systems:

EFFECT OF DIFFERENT MOORING SYSTEMS ON HYDRODYNAMIC ANALYSIS OF AN OFFSHORE WIND TURBINE

Dynamic Simulation of the Norne Heidrun 10 x 16 Dewatering Pig

Transcription:

The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd

Composite Benefits and Challenges Composite Materials offer a range of benefits which could be utilised in the offshore riser application to improve riser technology: Composites are light High specific strength Can be formed into complex shapes Very good fatigue resistance claimed High corrosion resistance Low maintenance Comparatively low axial and bending stiffness (i.e. compared to steel) Potential ease of installation (i.e. Reeled pipe) Disadvantages: High material cost Limited offshore track record (although widely used in other industries) Limited codes and standards with direct applicability to composite risers Hard to inspect sub-laminar damage 2 of 15

Composites Offshore History In the past composite materials have been used offshore in a range of applications, mainly in secondary structures; Pipework, Caissons, J- tubes, Riser protection, Walkways and Ladders; Improvements in structural integrity led to the 1st composite drilling riser joint which was used on Statoil s Heidrun TLP in 2001; More recent use as downlines to support pre-commissioning and acid stimulation operations. A 3 precommissioning downline was repeatedly used in a water depth of 2100m+ offshore Brazil, 2014; A number of companies are now scaling up efforts to produce composite pipe for offshore use. 3 of 15

Composites Offshore So how can the enhanced mechanical performance of composites help the riser industry: Reduced hang-off loads; Cheaper installation; Less required maintenance; Low roughness on internal bore; Provide opportunity to extend into more challenging locations. Can we reduce cost if we replace steel with composites? In a like for like replacement probably no, but if composites act as an enabling technology for new concepts and operating in challenging locations/environments then potentially yes. Study objective To assess the potential benefit, 2H carried out a comparison of a deepwater production riser using both steel and composite pipes; This is a high level study only conducted to gain an appreciation of the potential benefits of composite pipe. It does not present an optimised composite riser design. 4 of 15

SLHR Configurations Overview A SLHR is a Single Line Hybrid Riser, which employs a vertical steel riser section that is linked to the host vessel via a flexible pipe jumper. Also referred to by other acronyms such as SLOR or FSHR. Main Components: Foundation Lower Riser Assembly (LRA) Standard Riser Joints Upper Riser Termination Assembly (URA) Buoyancy Can and Tether / Stub Connection Flexible Jumper Rigid Base Spool Flexible Jumper to vessel Lower Riser Assembly Rigid Base Spool Vertical Riser Leg Buoyancy Tank Tether Connection/ Stub Connection Upper Riser Termination Assembly Foundation 5 of 15

SLHR Configurations - Analysed To compare, 2 risers were analysed, a conventional SLHR with a steel riser leg and another including composite pipe to replace the steel pipe; The considered water depth is 2000m. This was selected as the SLHR riser concept is already established for this water depth; The internal diameter for the composite pipe was selected to be of a matching size to the steel pipe; The pipe wall thicknesses were selected based on similar static loads Global FEA models of the 2 riser systems were created and analysed for this assessment So how did it Differ? Composite Riser section 6 of 15

Comparison Of Tension Requirements ForSLHRsabaseoverpullisrequired and is selected to limit riser fatigue and reduce loads on the subsea spool; For the steel riser, the required top tension drives the selection of the wall thickness as the high tension causes high stress for the top half of the steel riser; The required top tension for the composite riser is less than the base overpull. This is a result of the low riser weight which when combined with some insulation makes the pipe buoyant even when flooded; The selection of the wall thickness for the composite riser is not impacted by the tension requirements. Elevation Above Seabed (m) 2000 1800 1600 1400 1200 1000 800 600 400 Tension Required At Top Of Composite Pipe is 155 Te 200 Tension Required At Top Of LRA is 176 Te 0 100 200 300 400 Steel Riser Tension (Te) Composite Riser Tension Required At Top Of Steel Pipe is 365 Te 7 of 15

Buoyancy Tank Comparison The volume of the Buoyancy Tank is defined by the required upthrust, which is a function of the total weight of components; Supporting the single riser leg weight forms a large proportion of the total required upthrust; The weight reduction achieved by utilising a composite riser is shown in the table below: Parameter Steel Composite % variation Weight of riser line 105 Te -110 Te -205% Tension At Top 449 Te 235 Te -48% Tension At mid Riser 264 Te 166 Te -37% Base Tension 150 Te 150 Te 0% Composite Riser The size of the buoyancy tank can be reduced by up to 40%; The cost of the buoyancy tank calculated for the steel riser is approximately 1,000,000 for materials and fabrication. A significant cost saving, potentially approaching 40% is expected when a composite riser is used; Handling and installation attract additional savings due to the reduction in required lifting capacity, storage space and pressurisation time. 8 of 15

The LRA and Base Flexible Joint A flexible joint or a rotolatch system is normally required for hybrid risers to accommodate the large bending moment at the base of the riser and thus ensure adequate extreme and fatigue performance The potential of removing the flexible joint, taking advantage of the increased compliance of the composite pipe was investigated Parameter Steel Composite % variation Flexible Joint Rotation 7.3 Deg 6.7 Deg -8% FJ Extension Stress Utilisation 0.42 0.41-2% FJ Extension Bending Moment 209 knm 190 knm -9% Parameter Flexible Joint Rotation FJ Extension Stress Utilisation FJ Extension Bending Moment Steel Composite No FJ % variation 7.3 Deg 0 Deg -100% 0.42 2.15 412% 209 knm 1536 knm 634% The loads are too high and hence a lower flexible joint or a rotolatch is still necessary. 9 of 15

Riser Performance A comparison of the key design aspects of the steel and composite risers is given below: Parameter Steel Composite Comments Max Hang-Off Load (Te) 94 93 Max Hang-Off Bending Moment (knm) 261 282 Max Stress Utilisation 0.63 - MBR Safety Factor - 2.76 Max Tension Utilisation - 0.14 Max Buoyancy Tank Displacement (m) Max Buoyancy Tank Tension (Te) Max Bending Moment At Base of URA (knm) Max Bending Moment At Top of LRA (knm) 247 211 In an SLHR the flexible jumper to the vessel acts as interface between the vessel and the vertical riser leg thus keeping the two isolated. Therefore negligible change in hang-off loads While stress is the driving criteria for steel, Strain is the driving criteria for composites MBR is larger than minimum acceptable Tension is small in comparison to allowable Smaller drag area causes smaller buoyancy tank displacement 451 258 43% less tension required 116 62 581 270 Approximately 50% Lower Bending Moment for Upper and Lower Riser Assemblies 10 of 15

Riser Fatigue Performance Comparison Thefatigueperformanceoftheriser improved significantly due to the high composite material fatigue performance and the eradication of welds along the structure; The reduction of buoyancy has negative impact on the steel stub located below the buoyancy tank, a 33% reduction in fatigue life; The fatigue hot spot for the steel riser was found at the weld closest to the URA interface. Replacing the steel pipe with a composite material improves life at this location by a factor >100 times; The fatigue hot spot for the composite riser is at the steel stub below buoyancy tank where life is 200% higher than the steel riser minimum fatigue life. 11 of 15

Cost Summary Composite Pipes are very expensive and it is anticipated that the required composite pipe would carry a cost of approximately 10,000,000 compared to approximately 3,000,000 for the equivalent steel pipe; Savings are expected from the reduction of the Buoyancy tank size as well as the reduction of the LRA and URA sizes; It is anticipated that the biggest saving would be a result of the ease in installation as the reeled pipe and the smaller buoyancy tank would require less offshore installation time and smaller installation vessels; It is demonstrated that composites could be considered for this application They are technically feasible and show some improvements There may not be an obvious argument to use composites for reason of cost alone Overall, it is deduced that the cost when using a composite pipe, in the existing SLHR arrangement, is comparative to that when steel is used. Though, the mechanical performance is admittedly improved. So let s consider something more challenging 12 of 15

Reaching Further 4000m Water Depth Let s take an example where water depth is increased to 4000m; The same comparison is made for the SLHR utilising steel and composite pipes; For collapse criteria the internal diameter is limited to 8in; Reeled composite pipes can be produced for up to approximately 3km of continuous pipe: Intermediate connections shall be used where smaller pipe wall thickness can be used for shallow water sections (with a smaller collapse criteria). If a steel pipe is used, the weight of the steel vertical pipe is expected to be approximately 315Te: Based on static calculations considering a steel pipe with 8in internal diameter and wall thicknesses driven by high tension at the top and the collapse pressure at the base of the riser. Thesizeofthebuoyancytankrequiredtosupportthesteelriserisapproximately 970 m 3 in this water depth; When considering a composite pipe, -9Te total weight is estimated for the vertical riser and thus require no tension to support; The size of the buoyancy tank required is approximately 475 m 3 and thus approximately half as large as when steel is used. 13 of 15

4000m Water Depth Riser Performance Key results for the composite riser in 4000m water depth Paramaters Value Comments Pipe ID 8in This is the maximum recommended, and is driven by the collapse criteria Pipe Max OD 11.9in The wall thickness can vary, and thus a smaller pipe OD can be used at shallower depths Tension at Top 257 Te Similar level to composite in 2000m water depth. Note pipe size is different MBR Safety Factor 2.84 Acceptable MBR Max Tension Utilisation Bending Moment At top Of LRA Bending Moment At base Of URA Maximum Flexible Joint Rotation 0.17 Very low utilisation 237.70 comparative to composite pipe in 2000m 32.20 comparative to composite pipe in 2000m 8.1 Degrees Slight increase in comparison to 2000m As the results suggest, while it may be difficult with steel, composite pipe performance is adequate even in a 4000m water depth 14 of 15

Summary And Conclusions Composite systems have been tested and can be utilised in offshore riser applications; Now codes and standards which are specifically applicable to risers are being developed A hybrid riser system can benefit from changing steel pipe sections to composite pipe sections; It is anticipated that the bulk sizes of the buoyancy tank and the riser assembly frames will be reduced as a result of the enhanced weight to strength ratio of the pipe section; Installation will require reduced lift capacity and time duration; Composites can help the offshore industry reach new depths and operate in harsher environments. Composites represent an exciting potential solution to future design challenges for the riser industry, and it will be interesting to see how this area develops More radical design solutions should be considered Thanks to Magma Global and Airborne Oil & Gas for their assistance in providing material data and images for use in this presentation 15 of 15