Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Similar documents
The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

REDEVELOPMENT TRAFFIC IMPACT STUDY

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

Student Housing Development

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

February 24, 2017 Project #: 20076

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

Michigan Avenue Traffic Study

Bank Street Retail/Hotel Development

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

Travel Demand Management Plan

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

EXECUTIVE SUMMARY. Page 1 of 6

HUMC/Mountainside Hospital Redevelopment Plan

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Oregon Country Fair Events

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

joint access drive. will be

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

Syracuse University University Place Road Closure

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

NO BUILD TRAFFIC OPERATIONS

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

Transportation Impact Study for Abington Terrace

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

TRANSPORTATION IMPACT STUDY

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

DUNBOW ROAD FUNCTIONAL PLANNING

TRAFFIC IMPACT STUDY

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

4. Include the associated years anticipated for the short term and long term analysis in the

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

25 May 2018 OUR REF:

Henderson Avenue Mixed-Use Development

Harrah s Station Square Casino

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

Re: Tanger Retail Outlets - Phase 2 Addendum #1 to Phase 1 CTS/TIS

Road Conversion Study Plumas Street

Glebe Parking Garage 170 Second Avenue, Ottawa, Ontario Transportation Impact Study

Corporation of the Town of Oakville. December 16, 2013

ENKA INTERMEDIATE SCHOOL

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment. Appendix 8 Traffic Impact Assessment

ALLEY 24 TRAFFIC STUDY

3.2.2 Proposed Road Network within Phase 1B Lands

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Traffic Impact Study for Rolling Ridge Redevelopment

Patuxent Green Golf Course

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

192 & 196 Bronson Avenue / 31 Cambridge Street

6060 North Central Expressway Mixed-Use Site Dallas, Texas

APPENDIX D Traffic Impact Study (Draft Report)

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Queensgate Drive Corridor Traffic Study

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

Highway 111 Corridor Study

TRAFFIC STUDY GUIDELINES Clarksville Street Department

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Donahue Drive Corridor Traffic Operational Evaluation

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

Appendices. Appendix J: Traffic Study

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRAFFIC ASSESSMENT River Edge Colorado

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

Signal Warrant Studies

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Kanata North Catholic Elementary School

Transcription:

Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800 ~ Fax: 613-829-8299 ~ www.genivar.com

Table of Contents 1.0 INTRODUCTION... 1 2.0 SITE PLAN UPDATE AND BUILD-OUT CONTEXT... 1 3.0 CHANGES IN FORECAST FUTURE TRAFFIC CONDITIONS... 3 3.1 TRIP GENERATION... 3 3.2 TRAFFIC DISTRIBUTION AND ASSIGNMENT... 3 3.3 TOTAL TRAFFIC CONDITIONS... 4 4.0 CONCLUSIONS... 6 4.1 DESCRIPTION OF PLACE VANIER DEVELOPMENT... 6 4.2 SITE ACCESS... 6 4.3 CHANGES IN TRAFFIC GENERATION... 6 4.4 TRANSPORTATION SYSTEM IMPACTS... 7 4.5 RECOMMENDATIONS... 7 List of Figures Figure 1 Study Area... 1 Figure 2 Site Plan (Amendment)... 2 Figure 3 New Parking Trips... 4 Figure 4 Total Future Conditions (2012)... 5 Figure 5 Ultimate Future Conditions (2017)... 6 List of Tables Table 1 Parking Trip Generation... 3 Table 2 Intersection Capacity Analysis... 5 Appendix A Appendix B List of Appendices Traffic Generation... A Detailed Synchro Worksheets... B 111-23596-00 i

1.0 INTRODUCTION This document is an addendum to the May 31 st, 2012 Traffic Impact Study (TIS) submitted by GENIVAR for the proposed commercial development located at 250 Montreal Road. The addendum will serve to identify the changes to the site from a transportation perspective as required to support the application of the site plan amendment. 2.0 SITE PLAN UPDATE AND BUILD-OUT CONTEXT The site is located on the south west quadrant of the Montreal Road and Begin Street intersection in the Vanier Community. The original site plan included 2 levels of underground parking with 172 stalls and the use of the existing outdoor lot of 30 stalls for a total of 202 total parking stalls for the site. This met the City of Ottawa by-law requirement for 200 parking stalls for this site. Figure 1 illustrates the study area. Figure 1 Study Area The proposed site plan amendment proposes to reduce the underground parking to one floor with 103 stalls and the addition of a rear parking parkade with 150 parking stalls for a total of 253 parking stalls. The new 5 storey parking structure will replace the existing outdoor parking lot. The revised site plan is illustrated in Figure 2. 111-23596-00 1

Figure 2 Site Plan (Amendment) 111-23596-00 2

3.0 CHANGES IN FORECAST FUTURE TRAFFIC CONDITIONS The site plan amendment proposes the construction of the full parking parkade, at the rear of the site, instead of a second level of underground parking presented in the previous iteration of the site plan. The changes to the parking configuration in the site amendment have resulted in an additional 51 parking stalls being added to the site. It has been requested by City Staff to identify the potential impact that these additional parking stalls may have on the area, for example, if they are privately leased or designated as public pay parking. While it is not anticipated that the additional stalls will be used in this manner, an analysis was undertaken to determine the potential traffic impacts should this occur. The following subsections describe the methodology, trip generation and potential impacts of the additional parking stalls. 3.1 Trip Generation To understand the usage characteristics of the area, a survey of the existing parking lot during the peak periods was conducted on September 18 th and 19 th, 2012. The parking lot has pin curbs to designate each parking stall with the pavement markings faded to such a point that they are not distinguishable. The parking lot is split into two sides, with an approximate count of 45 available stalls. The survey counted 19 cars within the parking lot at the end of the AM Peak period and 12 cars prior to the PM Peak period. The resulting utilization of the parking lot during the peak periods was 42% during the AM peak period and 27% during the PM peak period. Using the existing Begin Street turning movement counts, these were converted into peak hour trips using a percent distribution over the time periods of 7:15 to 9:15 AM and 3:15 to 5:15 PM. The peak hour was selected from the Begin Street peak hour (8 to 9 AM and 3:45 to 4:45 PM), with 17 trips bound for the parking lot in the AM peak (13 inbound and 4 outbound) and 19 trips bound for the parking lot in the PM peak (10 inbound and 9 outbound). Table 1 summarizes the total trips and the generation data is shown in Appendix A. Site Existing Site 45 Proposed Additional Site Parking Stalls Peak Period Table 1 Parking Trip Generation Parking Characteristics Stalls Utilization 42% AM 27% PM 53 - Existing Parking Lot Proposed Additional Site Parking Stalls Inbound Outbound Inbound Outbound AM Peak 11 3 13 4 PM Peak 9 6 10 9 3.2 Traffic Distribution and Assignment The distribution applied to the potential new parking trips is consistent with the distribution outlined in the May 31 st, 2012 TIS for 250 Montreal Road. Figure 3 illustrates the assignment of the parking trips to the Montreal Road and Begin Street intersection. 111-23596-00 3

Figure 3 New Parking Trips 3.3 Total Traffic Conditions The assessment of the future condition horizons was analyzed using the methodologies of the Highway Capacity Manual, 2000 edition, and facilitated using the Synchro 8.0 software package. The resulting findings are an update over the Synchro 6.0 software used in the original TIS. Table 2 provides a summary of the intersection operations for the total future 2012 and ultimate future 2017 horizons. Figure 4 and Figure 5 illustrate the anticipated total future 2012 and ultimate future 2017 peak hour traffic volumes. The comparison of the 2012 and 2017 horizons shows an increase in the delay experienced on the northbound approach as a result of the growth assumed in the original TIS dated May 31 st, 2012. The detailed Synchro worksheets are provided in Appendix B. 111-23596-00 4

Intersection Montreal Road & Begin Street Intersection Montreal Road & Begin Street Table 2 Intersection Capacity Analysis Total Future Conditions 2012 Peak Hour Intersection Operation LOS ii Delay (seconds) Critical Lane Group iii AM C 17.6 NBL-R PM C 22.1 NBL-R Ultimate Future Conditions 2017 Peak Hour Intersection Operation LOS ii Delay (seconds) Critical Lane Group iii AM C 21.0 NBL-R PM D 26.7 NBL-R i. Overall V/C Ratio HCM Volume to capacity ratio. Volume to Capacity Ratio (V/C) - compares intersection approach volumes with approach capacity (0.50 - half capacity, 1.00 - at capacity). ii. Overall Level of Service (LOS) Intersection Performance Rating (A excellent conditions, F congested conditions). iii Critical Lane Group for Level of Service indicates the movement at the intersection referenced. Figure 4 Total Future Conditions (2012) 111-23596-00 5

Figure 5 Ultimate Future Conditions (2017) 4.0 CONCLUSIONS 4.1 Description of Place Vanier Development The Place Vanier development, located at 250 Montreal Road, will consist of approximately 90,670 square feet of general office space (including a café and restaurant) and 8,600 square feet of commercial space for a bank. The building will front directly onto Montreal Road, integrating with the mainstreet design principles for the area with the parking access situated on Begin Street. The site will provide a total of 253 parking stalls; 103 stalls underground and 150 stalls in the rear parkade. The site plan amendment will provide a total of 253 parking stalls, an increase of 51 stalls from the previous iteration of the proposed site. 4.2 Site Access The site plan amendment will create a new site access on Levis Avenue, approximately 20 metres west of the Levis Avenue and Begin Street intersection. The underground parking access will remain along Begin Street. Trips currently assigned to Levis Avenue may access the site through this new parking parkade access, and it is not anticipated that site trips will be diverted from the access on Begin Street. 4.3 Changes in Traffic Generation The overall parking provided in the site plan amendment will ultimately provide an additional 53 parking stalls beyond the minimum 200 stalls required for the site (as per City parking by-law). Under the assumption that these additional stalls will not be kept vacant and potentially leased or converted to pay parking, a trip generation exercise was undertaken to determine the additional trips that may occur. 111-23596-00 6

The traffic expected to be generated by the additional stalls was forecasted to be 17 new trips in the AM peak (13 inbound and 4 outbound) and 19 new trips in the PM peak (10 inbound and 9 outbound). 4.4 Transportation System Impacts The existing road network and intersection of Montreal Road and Begin Street will accommodate the potential traffic generated by the site at a satisfactory level of service for the 2012 and 2017 ultimate horizons. No infrastructure improvements are required. 4.5 Recommendations The recommendations presented in the May 31 st, 2012 TIS Report are still valid and should be taken under consideration by the City. No additional recommendations are proposed from the changes in the site plan amendment. Conclusion From a transportation impact perspective, the proposed site plan amendment for the Place Vanier development at 250 Montreal Road should be permitted to proceed. Angelo Renon, P.Eng Director Transportation Detailed Design Andrew Harte, E.I.T. Junior Transportation Engineer 111-23596-00 7

APPENDIX A TRAFFIC GENERATION 111-23596-00 A

Begin Street Traffic Counts Project: 250 Montreal Road Date: Tuesday December 13, 2011 AM PEAK Eastbound Northbound Westbound Eastbound Northbound Westbound Time Through Right Left Right Through Left Time Through Right Left Right Through Left 7:15 7:30 134 4 3 1 173 2 7:15 8:15 572 16 8 9 787 9 7:30 7:45 152 6 5 5 193 1 7:30 8:30 574 17 7 10 843 10 7:45 8:00 144 1 0 2 188 3 7:45 8:45 568 20 3 10 866 14 8:00 8:15 142 5 0 1 233 3 8:00 9:00 556 28 5 11 909 19 8:15 8:30 136 5 2 2 229 3 8:15 9:15 565 28 10 12 867 26 8:30 8:45 146 9 1 5 216 5 8:45 9:00 132 9 2 3 231 8 9:00 9:15 151 5 5 2 191 10 PM Eastbound Northbound Westbound Eastbound Northbound Westbound Time Through Right Left Right Through Left Time Through Right Left Right Through Left 3:15 3:30 204 10 3 14 188 6 3:15 4:15 780 44 11 43 750 18 3:30 3:45 189 12 5 9 199 4 3:30 4:30 827 47 9 38 759 19 3:45 4:00 178 13 1 11 176 4 3:45 4:45 869 44 6 37 739 19 4:00 4:15 209 9 2 9 187 4 4:00 5:00 879 38 7 33 731 19 4:15 4:30 251 13 1 9 197 7 4:15 5:15 850 37 6 32 706 18 4:30 4:45 231 9 2 8 179 4 4:45 5:00 188 7 2 7 168 4 5:00 5:15 180 8 1 8 162 3

Figure 9 Trip Distribution from Place Vanier 250 Montreal Road Transportation Impact Study Update, May 31, 2012 Legend: Inbound Outbound

Place Vanier 250 Montreal Road Date: 20 Sep 12 Begin Distribution (Dec 13, 2011) Time Inbound Outbound % In % Out 7:15 7:30 6 4 8% 10% 7:30 7:45 7 10 9% 26% 7:45 8:00 4 2 5% 5% 8:00 8:15 8 1 10% 3% 8:15 8:30 8 4 10% 10% 8:30 8:45 14 6 18% 15% 8:45 9:00 17 5 22% 13% 9:00 9:15 15 7 19% 18% Total 79 39 1 1 3:15 3:30 16 17 14% 18% 3:30 3:45 16 14 14% 15% 3:45 4:00 17 12 15% 13% 4:00 4:15 13 11 11% 12% 4:15 4:30 20 10 17% 11% 4:30 4:45 13 10 11% 11% 4:45 5:00 11 9 9% 10% 5:00 5:15 11 9 9% 10% Total 117 92 1 1 Note 1 % In / Out of total inbound / outbond traffic Note 2 Peak Hour Parking Survey Occupancy Estimated Capacity Utilization Notes AM 19 45 42% (end of AM Peak Sept 19 2012) PM 12 45 27% (beginning of PM Peak Sept 18 2012) Estimated Peak Hour Existing Parking Lot Volumes Inbound Outbound AM 11 3 PM 9 6 Note 1 Inbound / Outbound Percentages from Begin St applied to parking lot occupancy Projected Peak Hour Additional Parking Stall Volumes Inbound Outbound AM 13 4 PM 10 9 Note 1 Ratio of existing parking volumes applied to the 53 additional stalls

APPENDIX B DETAILED SYNCHRO WORKSHEETS 111-23596-00 B

HCM Unsignalized Intersection Capacity Analysis 4: Begin Street & Montreal Road 9/19/2012 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 499 76 76 778 9 24 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 499 76 76 778 9 24 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 52 87 px, platoon unblocked 0.95 0.70 0.95 vc, conflicting volume 575 1467 288 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 442 1176 139 tc, single (s) 4.1 6.8 6.9 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 93 93 97 cm capacity (veh/h) 1056 120 838 Direction, Lane # EB 1 EB 2 WB 1 NB 1 Volume Total 333 242 854 33 Volume Left 0 0 76 9 Volume Right 0 76 0 24 csh 1700 1700 1056 319 Volume to Capacity 0.20 0.14 0.07 0.10 Queue Length 95th (m) 0.0 0.0 1.8 2.6 Control Delay (s) 0.0 0.0 1.8 17.6 Lane LOS A C Approach Delay (s) 0.0 1.8 17.6 Approach LOS C Intersection Summary Average Delay 1.5 Intersection Capacity Utilization 78.1% ICU Level of Service D Analysis Period (min) 60 Place Vanier - 250 Montreal Road 5/31/2012 2012 AM Total Future Traffic Synchro 8 Report AH Page 1 HCM Unsignalized Intersection Capacity Analysis 4: Begin Street & Montreal Road 9/19/2012 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 733 64 45 784 28 98 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 733 64 45 784 28 98 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 52 87 px, platoon unblocked 0.76 0.80 0.76 vc, conflicting volume 797 1247 765 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 570 783 527 tc, single (s) 4.1 6.8 6.9 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 94 89 74 cm capacity (veh/h) 755 248 374 Direction, Lane # EB 1 WB 1 WB 2 NB 1 Volume Total 797 306 523 126 Volume Left 0 45 0 28 Volume Right 64 0 0 98 csh 1700 755 1700 336 Volume to Capacity 0.47 0.06 0.31 0.37 Queue Length 95th (m) 0.0 1.4 0.0 13.4 Control Delay (s) 0.0 2.1 0.0 22.1 Lane LOS A C Approach Delay (s) 0.0 0.8 22.1 Approach LOS C Intersection Summary Average Delay 2.0 Intersection Capacity Utilization 73.0% ICU Level of Service D Analysis Period (min) 60 Place Vanier - 250 Montreal Road 5/31/2012 2012 PM Total Future Traffic Synchro 8 Report AH Page 1

HCM Unsignalized Intersection Capacity Analysis 4: Begin Street & Montreal Road 9/19/2012 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 548 78 78 854 9 25 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 548 78 78 854 9 25 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 52 87 px, platoon unblocked 0.94 0.63 0.94 vc, conflicting volume 626 1597 313 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 477 1304 145 tc, single (s) 4.1 6.8 6.9 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 92 90 97 cm capacity (veh/h) 1018 89 825 Direction, Lane # EB 1 EB 2 WB 1 NB 1 Volume Total 365 261 932 34 Volume Left 0 0 78 9 Volume Right 0 78 0 25 csh 1700 1700 1018 258 Volume to Capacity 0.21 0.15 0.08 0.13 Queue Length 95th (m) 0.0 0.0 1.9 3.4 Control Delay (s) 0.0 0.0 2.0 21.0 Lane LOS A C Approach Delay (s) 0.0 2.0 21.0 Approach LOS C Intersection Summary Average Delay 1.6 Intersection Capacity Utilization 83.9% ICU Level of Service E Analysis Period (min) 60 Place Vanier - 250 Montreal Road 5/31/2012 2017 AM Ultimate Total Traffic Synchro 8 Report AH Page 1 HCM Unsignalized Intersection Capacity Analysis 4: Begin Street & Montreal Road 9/19/2012 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) 805 68 47 860 29 101 Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Hourly flow rate (vph) 805 68 47 860 29 101 Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 52 87 px, platoon unblocked 0.71 0.76 0.71 vc, conflicting volume 873 1363 839 vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol 617 836 570 tc, single (s) 4.1 6.8 6.9 tc, 2 stage (s) tf (s) 2.2 3.5 3.3 p0 queue free % 93 87 69 cm capacity (veh/h) 681 216 330 Direction, Lane # EB 1 WB 1 WB 2 NB 1 Volume Total 873 334 573 130 Volume Left 0 47 0 29 Volume Right 68 0 0 101 csh 1700 681 1700 296 Volume to Capacity 0.51 0.07 0.34 0.44 Queue Length 95th (m) 0.0 1.7 0.0 17.4 Control Delay (s) 0.0 2.3 0.0 26.7 Lane LOS A D Approach Delay (s) 0.0 0.8 26.7 Approach LOS D Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 77.0% ICU Level of Service D Analysis Period (min) 60 Place Vanier - 250 Montreal Road 5/31/2012 2012 PM Ultimate Total Traffic Synchro 8 Report AH Page 1