JOURNAL MAJOR TRANSIT AND TRANSPORTATION CONSTRUCTION TRAFFIC MANAGEMENT COMMITTEE Thursday, April 12, 2018, 9:00 AM 1149 S. Broadway, 1 st Floor Conference Room No. 150, Los Angeles, CA 90015 Committee Members: Richard Liu (BOE), Chair Dominick Esposito, (BOE), Co-Chair Diana Crowder (BOE) +Marina Chang (LADOT) +Victor Yang (LADOT) +Debra Scott (BSS) John Nelson (ConAD) Marco Arroyo (LADOT) Vatche Kouyoumjian (LADOT) Mariann Karish (BOE) +Absent It is the responsibility of the Major Transportation Construction Traffic Management Committee to review applications for permits to work within the streets and determine work site traffic control conditions within the Transit Project Impact Area (LAMC 62.250). To be placed on the agenda, a brief description of the project must be emailed to ENG.TCTMC@lacity.org by 12 PM on Thursday in order to present the following Thursday. Additionally, it is the policy of the Committee to allow public comment on individual agenda items subject to such time limits as the Committee Chairman may deem appropriate. Appeals Committee - The General Manager of the Department of Transportation, the City Engineer, the Director of the Bureau of Street Services, and the Director of the Bureau of Contract Administration, or their designees. The City Engineer shall be the Chairperson of the Appeals Committee. The Appeals Committee considers appeals regarding Worksite Traffic Control Conditions and night work. The President of the Board of Public Works decides those appeals heard by the Appeals Committee that end in a tie vote. If you would like to appeal the committee s determination, please email ENG.TCTMC@lacity.org with your request. It is requested that individuals who require the services of a translator contact ENG.TCTMC@lacity.org no later than the day preceding the meeting. Whenever possible, a translator will be provided. Sign language interpreters, assistive listening devices, or other auxiliary aids and/or services may be provided upon request. To ensure availability, you are advised to make your request at least 72 hours prior to the meeting you wish to attend. SI REQUIERE SERVICIOS DE TRADUCCION, FAVOR DE NOTIFICAR LA OFICINA CON 24 HORAS POR ANTICIPADO.
PUBLIC COMMENT: The Committee will hear public testimony on agenda items under the Committee's jurisdiction. MINUTES: Review and adopt April 5, 2018 meeting minutes. AGENDA ITEMS: 1) Dhanraj Doshi (FJS Engineering) 4201 Wilshire Blvd PLE: Placing 46 1-4 conduit from existing MH #227 to Zayo MH. 2018002921 DISPOSITION: 180250-PLE TLR issued 2) Matt Petroni (PE & C Civil Engineering) 5 th St btw Van Ness Ave & Wilton Pl PLE: Replace storm drain lateral. B-P#: BR004161 DISPOSITION: 180251-PLE TLR issued 3) Laura Castro (Vinculums Services, LLC/AT&T Mobility) 8495 W 3 rd St PLE: Maintenance on existing wireless facility (utility pole). BSS#: DISPOSITION: No Show 4) Anthony Juarez/Mark Richards (H Structure Six Engineers/Jamison Properties, LP) 411 S Normandie Ave PLE: Construct multi-family apartments on Normandie. B-P#: BR003943 DISPOSITION: Cancelled 5) George Valeriano (Sign Excellence) 6420 Wilshire Blvd PLE: Use of Boom lift to install channel letters on building. BSS#:2018003862 DISPOSITION: Cancelled 6) Chris Colovas (TPR Traffic Solutions/Griffith Co) Solar Way /Constellation Blvd PLE2: Excavating and installing 15 sewer line. B-P#: BR402638 DISPOSITION: 180252-PLE Under review 7) Chris Colovas (TPR Traffic Solutions/Webcor) Ave of the Stars /Constellation Blvd PLE2: Tower crane erection. BSS#: 2018004335 DISPOSITION: 180253-PLE Under review, pending Sunday Variance and revised TCP 8) Dennis Highstreet (California Access Scaffold, LLC) 249 S Los Angeles St RC: Install sidewalk pedestrian canopy. BSS#: 2018002333 DISPOSITION: 180254-RC TLR Issued
9) Justin Bowers/Joseph Mills (Inland Engineering Services, Inc) 700 W 9 th St RC: Open trench to install fiber optic cable. 2017011783 DISPOSITION: 180255-RC TLR issued 10) Justin Bowers/Joseph Mills (Inland Engineering Services, Inc) 1 st St & Figueroa St RC: Open trench to install fiber optic cable. 2018003190 DISPOSITION: 180256-RC Under review, pending revised TCP and schedule 11) Justin Bowers/Joseph Mills (Inland Engineering Services, Inc) 312 N Spring St RC: Open trench to install fiber optic cable. 2018002242 DISPOSITION: 180257-RC Under review, pending revised schedule 12) Anthony Soriano (TMI/Suffolk Construction Co, Inc) 888 S Hope St RC: K-rail removal-restoration. Grand Hope Lofts. BSS#: 2018003928 DISPOSITION: 180258-RC Under review 13) Anthony Soriano (TMI/Matt Construction) 135 N Grand Ave RC: Deliveries of building materials to job site for Music Center renovation on Hope St. BSS#: 2018004355 DISPOSITION: 180259-RC TLR issued 14) Anthony Soriano (TMI/Matt Construction) 135 N Grand Ave RC: Deliveries of building materials to job site for Music Center renovation on Grand. BSS#: 2018004357 DISPOSITION: 180260-RC TLR issued 15) Jackie Rivera (Have Alliance) 100 S Alameda St. RC: Perform painting on a section of the exterior wall of the building BSS#: 2018003196 DISPOSITION: Returned to applicant, not on a street of significance 16) Jeff Hebert (Roadway Construction Service) 200 S Grand St. RC: Crane for lifting a shelter BSS#: 2018003265 TCTMC#: 180195-RC DISPOSITION: Cancelled 17) Mayra Cadena (HSG Waterproofing, Restoration & Window Cleaning) 811 W 7 th St RC: Exterior window cleaning on Wilshire and alley side w/ 65 boom lift. BSS#: 2018003839 DISPOSITION: 180276-RC TLR issued
18) Luke Snyder (Synergy/AT&T Mobility) W 8 th St & Grand Ave RC: Open trench to install conduit for fiber, from existing AT&T pull 2018003406 DISPOSITION: 180261-RC TLR issued 19) Luke Snyder (Synergy/AT&T Mobility) Hope St & Wilshire RC: Open trench to install conduit for fiber, from existing AT&T pull 2018001932 DISPOSITION: 180262-RC TLR issued 20) Luke Snyder (Synergy/AT&T Mobility) 6 th St & S Hill St RC: Open trench to install conduit for fiber, from existing AT&T pull box to existing street light. 2018003414 DISPOSITION: 180263-RC TLR issued 21) Luke Snyder (Synergy/AT&T Mobility) Hill St & S 6 th St RC: Open trench to install conduit for fiber, from existing AT&T pull box to existing street light. 2018001907 DISPOSITION: 180265-RC TLR issued 22) Luke Snyder (Synergy/AT&T Mobility) Flower St & 5 th St RC: Open trench to install conduit for fiber, from existing AT&T pull 2018001920 DISPOSITION: 180266-RC TLR issued 23) Luke Snyder (Synergy/AT&T Mobility) Grand Ave & 3 rd St RC: Maintenance to an existing AT&T cell site. BSS#: 2018003897 DISPOSITION: 180264-RC TLR issued 24) Luke Snyder (Synergy/AT&T Mobility) Hope St & 1 st St RC: Open trench to install conduit for fiber, from existing AT&T pull box to existing street light. 2018001908 DISPOSITION: 180267-RC TLR issued 25) Luke Snyder (Synergy/AT&T Mobility) Temple St & Spring St RC: Open trench to install conduit for fiber, from existing AT&T pull 2018003316 DISPOSITION: 180268-RC TLR issued
26) Luke Snyder (Synergy/AT&T Mobility) 1 st St & Los Angeles St RC: Open trench to install conduit for fiber, from existing AT&T pull 2018001922 DISPOSITION: 180269-RC TLR issued 27) Luke Snyder (Synergy/AT&T Mobility) Temple St & Main St RC: Open trench to install conduit for fiber, from existing AT&T pull 2018003012 DISPOSITION: 180270-RC Under review, pending revised TCP 28) Luke Snyder (Synergy/AT&T Mobility) San Pedro St & E Main St RC: Open trench to install conduit for fiber, from existing AT&T pull 2018001944 DISPOSITION: 180271-RC TLR issued 29) John Johnston (AT&T) E 1 st St & S Los Angeles St RC: Excavate and place conduit from existing maintenance hole to new splice box. 2018002989 DISPOSITION: Moved to next week 30) John Johnston (AT&T) E 1 st St & N Los Angeles St RC: Access maintenance hole to place and splice fiber cable. BSS#: 2018003969 DISPOSITION: 180272-RC Under review 31) John Johnston (AT&T) W 6 th St & S Hill St RC: Access maintenance hole to place and splice fiber cable to customer location. BSS#: 2018003937 DISPOSITION: Moved to next week 32) John Johnston (AT&T) Temple St & Spring St RC: Excavate and place conduit from existing maintenance hole to new splice box. 2018003343 DISPOSITION: 180273-RC Under review 33) Joe Vasilj (Vasilj Inc) 4 th St & Anderson St SSB: Sewer Work on 4 th St & Anderson. TCTMC#: 150572-SSB DISPOSITION: No show
34) Amir Birjandi (Another Perspective Inc.) 11022 Aviation Blvd. CTC: Sidewalk construction. TCTMC#: 170308-CTC DISPOSITION: No show 35) George Batista (SoCalGas) Florence Ave & Crenshaw Blvd CTC/SCSR: Excavate to replace gas main and services. 2018000074 DISPOSITION: 180275-CTC/SCSR Under review, pending revised TCP 36) John Johnston (AT&T) 49 th & S Figueroa St. SCSR: Excavate and place conduit from existing cabinet to existing utility pole. 2018003128 DISPOSITION: 180274-SCSR Under review, pending revised TCP 37) Javier Magana (Semprautilities) 5803 ½ S Main St SCSR: Abandonment DISPOSITION: Returned to applicant 38) Javier Magana (Semprautilities) 5807 S Main St SCSR: Abandonment DISPOSITION: Returned to applicant 39) Robert Herrera (Inland Engineering Services, Inc) 5710 S Main St SCSR: Aerial fiber optic cable installation, Main St from 53 rd St to 59 th Pl. BSS#: 2018001075 DISPOSITION: Returned to applicant 40) Old business items, Haul Route submittals and miscellaneous discussion items. TLRs were approved and issued for the following old business items: 180048-PLE 180212-SCSR 180213-SCSR 180214-SCSR 180215-SCSR 180216-SCSR 180217-SCSR 180220-SCSR 180241-SCSR 180245-SCSR Q:\TCTMC\Meeting Minutes\TCTMC Meeting Minutes 4-12-18\Agenda 4-12-18.docx