MIA Training Example (Beattie No. 99)

Similar documents
MIA Training Example (Catalano 2H)

Mechanical Integrity Assessment Training

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

Disposal/Injection Well Pressure Test Report (H-5)

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

SUBSEA KILL SHEET EXERCISE No. 5

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Acoustic Troubleshooting of Coal Bed Methane Wells

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

Casing Design. Casing Design. By Dr. Khaled El-shreef

On-Off Connector Skirt

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Casing and Cementing Requirements

Colorado Oil and Gas Conservation Commission

Texas Administrative Code

Deepwater Horizon Incident Internal Investigation

1 PIPESYS Application

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Understanding pressure and pressure

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

ACOUSTIC VELOCITY FOR NATURAL GAS

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Enbridge Pipelines (NE Texas) LP EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Why Do Not Disturb Is a Safety Message for Well Integrity

Petr 311 Wellbore pressures and Kick Control

PHE KE30-A8 WORKOVER PROGRAM

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

Presents the following instructional slide show:

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Float Equipment TYPE 925/926

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

SPE Copyright 2004, Society of Petroleum Engineers Inc.

Mobeetie Resource Dev LLC EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

6200E Installation Requirements

Rig Math. Page 1.

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS

Investigation of Explosion and Fire at Prudhoe Bay Well A-22 North Slope, Alaska August 16, 2002

Cased-Hole Logging Environment

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Drilling Morning Report

Form 21 Mechanical Integrity Test

Chapter 5 Drilling and Well Testing Practices

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

W I L D W E L L C O N T R O L FLUIDS

HOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

PETITION OF SHELL OIL COMPANY TO MAKE PERMANENT THE PRESENT SPECIAL FIELD RULES FOR THE SOUTHWEST PINEY

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Worked Questions and Answers

Deliquification Short Stories

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

WellTracer. East Texas Gas Producers Association. Carthage, Texas September 21 st, 2010

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

IWCF Equipment Sample Questions (Surface Stack)

HydroPull. Extended-Reach Tool. Applications

Intermittent Gas Lift Utilizing a Pilot Valve

Oil Well Potential Test, Completion or Recompletion Report, and Log

OCEAN DRILLING PROGRAM

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

Installation Operation Maintenance

FIG: 27.1 Tool String

COMBINATION AIR RELEASE DEGASSING (CARD) VALVES INSTALLATION AND MAINTENANCE MANUAL

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

16. Studio ScaleChem Calculations

VortexFlow DX (Downhole) Tool Installation Instructions

Efficient Pigging of Gathering Lines. Energy Management Workshop for Upstream and Midstream Operations

Shallow geothermal well systems

Flammability Chart. Gas Formula Ignition

Oil Well Potential Test, Completion or Recompletion Report, and Log

Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

HPHT Annular Casing Packer. Obex Annular Casing Packer

Commentary on the book by Andrew Hopkins. By Graham Dalzell

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

OXY Integral. INTERCON ENTERPRISES INC Tel: Fax: Internet:

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

Annulus Communications Eliminated using Pressure- Activated Sealant

Oilfield Safety OSHA s Stats

Practice Exam IADC WellSharp Driller and Supervisor

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

1. The well has been shut in on a kick and the kill operation has not started.

Sucker Rod Pumping Workshop Technology in a Mature Industry. September 2017 John C. Patterson Consultant Retired from ConocoPhillips (2015)

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

ENDEAVOR ENERGY RESOURCES

Transcription:

MIA Training Example (Beattie No. 99) The Beattie No. 99 is a Turn-of-the-20 th Century gas well with no construction information available. Since the production casing is all that is accessible at the surface, only a limited number of inspection components can be completed during the first inspection. In this example, a single inspection was performed during the fourth quarter of 2013 and Form A was set up to determine the minimum number of required inspection components in situations where well construction data are not readily accessible by selecting the button labeled Set Up Well for First Inspection in cell/box 4b. During the first inspection, additional construction details may potentially be gathered in the field and any updates made during the next inspection year. Page 1

Beattie No. 99 Well Schematic and Inspection Components Page 2

MIA Training Example (Beattie No. 99) Step 1: Enter basic information, including the operator, well ID and abridged API. a. Well Operator/Owner (cell/box 1.): Operator A 1. Only needs to be done once for the entire form b. Operator Assigned ID (cell/box 2.): Beattie No. 99 c. Abridged API # (cell/box 3.): 063-15999 Step 2: Enter well construction information under cells/boxes 4-8. This only needs to be done once for the life of the well, unless a change is made to the construction of that well. a. Well Type (cell/box 4a.): Gas b. Well Construction Information Not Readily Available (cell/box 4b.): Choose button labeled Set Up Well for First Inspection c. Water Level Accessible (cell/box 5.): N/A d. Freshwater Casing Only (cell/box 6.): N/A e. Annular Production (cell/box 7.): N/A f. Annular Production Inside Surface or Coal Casing String (cell/box 8.): N/A Step 3: Enter the number of casing strings and click Customize Data Tables. a. Number of Casings Strings, Excluding Conductor Pipe, Tubing, and Liners (cell/box 9): N/A b. Click (cell/box 9): N/A Steps 2 and 3 set up the rest of Form A. Step 4: Enter the Surface or Coal Casing Set Depth in feet (ft), if applicable, and then enter the first quarterly inspection date. a. Surface or Coal Casing Set Depth (ft) (cell/box 10.): N/A b. Q4 Date (cell/box 11.): 12/23/13 Page 3

Step 5: Fill out Section 13 Wellhead Pressure or Water Level for Q4. In this case, leave Section 12 blank for Q4 because this is a new well entry in Form A and, thus, there are no previous data to transfer from either the 4 th quarter of the previous year or previous quarter of the current year. a. Primary Production Gas Pressure (psig) (cell/box 13a.): 20 b. Produced Annular Gas Pressure(psig) (cell/box 13b.): N/A c. Shoe Test Pressure (psig) (cell/box 13c.): N/A d. Annulus (cell/box 13d.): N/A e. Water Level (ft) (cell/box 13e.): N/A f. Average Daily Pumping Time (hours) or average daily pumping volume (bbls) (If no produced water, Indicate NPW ) (cell/box 13f.): N/A g. Produced Water Quality Specific Conductance (μs or μmhos)/cm) (cell/box 13g.): N/A Step 6: Fill out Section 14 Flow or Pressure in Production Annulus for Q4. a. Production Annulus Status (cell/box 14a.): Choose button labeled Inaccessible b. Production Annulus Flow (scfpd) (cell/box 14b.): N/A c. Production Annulus Pressure (psig) (cell/box 14c.): N/A d. Time Since Production Annulus Was Last Blown Down (days) (cell/box 14d.): N/A e. Cement Top in Production Annulus Above Next Outer Casing Shoe (cell/box 14e.): N/A f. Annulus (cell/box 14f.): N/A Page 4

Step 7: Fill out Section 15 Measurement or Best Estimate of Leaking/Venting Gas Quantity for Q4. a. Annulus (cell/box 15a.): N/A b. Flow (scfpd) (cell/box 15b.): N/A c. Annulus Shut-in (cell/box 15c.): N/A d. Annulus (cell/box 15d.): N/A e. Flow (scfpd) (cell/box 15e.): N/A f. Annulus Shut-in (cell/box 15f.): N/A g. Annulus (cell/box 15g.): N/A h. Flow (scfpd) (cell/box 15h.): N/A i. Annulus Shut-in (cell/box 15i.): N/A j. Annulus (cell/box 15j.): N/A k. Flow (scfpd) (cell/box 15k.): N/A l. Annulus Shut-in (cell/box 15l.): N/A m. Surface/Wellhead Equipment/Outside Conductor (cell/box 15m.): N Step 8: Fill out Section 16 Liquid Hydrocarbon Flows for Q4. a. Annulus (cell/box 16a.): N/A b. Y/N/I (cell/box 16b.): N/A c. Annulus (cell/box 16c.): N/A d. Y/N/I (cell/box 16d.): N/A e. Annulus (cell/box 16e.): N/A f. Y/N/I (cell/box 16f.): N/A g. Annulus (cell/box 16g.): N/A h. Y/N/I (cell/box 16h.): N/A i. Annulus (cell/box 16i.): N/A j. Y/N/I (cell/box 16j.): N/A k. Surface/Wellhead Equipment/Outside Conductor (cell/box 16k.): N Page 5

Step 9: Fill out Section 17 Non-Freshwater Flows for Q4. a. Annulus (cell/box 17a.): N/A b. Y/N/I (cell/box 17b.): N/A c. Annulus (cell/box 17c.): N/A d. Y/N/I (cell/box 17d.): N/A e. Annulus (cell/box 17e.): N/A f. Y/N/I (cell/box 17f.): N/A g. Annulus (cell/box 17g.): N/A h. Y/N/I (cell/box 17h.): N/A i. Annulus (cell/box 17i.): N/A j. Y/N/I (cell/box 17j.): N/A k. Surface/Wellhead Equipment/Outside Conductor (cell/box 17k.): N Step 10: Fill out Section 18 Safe Venting and check for Corrosion Problems for Q4 in Section 19. a. Gas Leaking or Venting to Atmosphere (cell/box 18a.): N (auto populated) b. Wellhead Hydrogen Sulfide (ppm) (cell/box 18b.): N/A c. Wellhead Methane ( %LEL) (cell/box 18c.): N/A d. Corrosion Problems (cell/box 19.): N Page 6

Step 11: Fill out the Comments section, if needed; and check to see if Immediate DEP Reporting is Necessary based on the information entered in Form A for Q4. The option to Reset this portion of Form A is available as well. This function will only reset the four rows associated with this well. a. Comments (cell/box 20.): No well record available due to age of well. Limited information available at surface. b. Immediate DEP Reporting Necessary (cell/box 21.): Y (auto populated) c. Reset (cell/box 22): N/A Final: This concludes the Beattie No. 99 example. Page 7