MIA Training Example (Catalano 2H)

Similar documents
MIA Training Example (Beattie No. 99)

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

Mechanical Integrity Assessment Training

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Disposal/Injection Well Pressure Test Report (H-5)

Texas Administrative Code

Casing Design. Casing Design. By Dr. Khaled El-shreef

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

SUBSEA KILL SHEET EXERCISE No. 5

Acoustic Troubleshooting of Coal Bed Methane Wells

WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

On-Off Connector Skirt

Deepwater Horizon Incident Internal Investigation

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

IWCF Equipment Sample Questions (Surface Stack)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

PHE KE30-A8 WORKOVER PROGRAM

Understanding pressure and pressure

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Colorado Oil and Gas Conservation Commission

Casing and Cementing Requirements

Enbridge Pipelines (NE Texas) LP EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

PETITION OF SHELL OIL COMPANY TO MAKE PERMANENT THE PRESENT SPECIAL FIELD RULES FOR THE SOUTHWEST PINEY

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Why Do Not Disturb Is a Safety Message for Well Integrity

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Mobeetie Resource Dev LLC EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

Form 21 Mechanical Integrity Test

Worked Questions and Answers

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

BLACK HILLS PLATEAU PRODUCTION COMPANY

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Presents the following instructional slide show:

OCEAN DRILLING PROGRAM

Float Equipment TYPE 925/926

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

NORSOK STANDARD SYSTEM REQUIREMENTS BOP, DIVERTER AND DRILLING RISER SYSTEM (SYSTEM NO.: 12-30, 12-40)

Petr 311 Wellbore pressures and Kick Control

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

TAM Single SeT inflatable

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

Chapter 5 Drilling and Well Testing Practices

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

HPHT Annular Casing Packer. Obex Annular Casing Packer

30 C.F.R. Subpart D Oil and Gas Drilling Operations

1. The well has been shut in on a kick and the kill operation has not started.

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

Cased-Hole Logging Environment

Deliquification Short Stories

TROUBLESHOOT ROD PUMPED WELLS USING TUBING FLUID LEVEL SHOTS

Recommended minimum functional specifications and standards for geothermal wells in the Netherlands v.5

APPENDIX A1 - Drilling and completion work programme

Shallow geothermal well systems

Railroad Commission of Texas

Subsea Safety Systems

ACOUSTIC VELOCITY FOR NATURAL GAS

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

Study Guide IADC WellSharp Driller and Supervisor

PTRT 1471: Exploration and Production I. Chapter 6: Drilling and Well Completion

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L FLUIDS

North Dakota Petroleum Council Re-stimulation Initiative

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oilfield Safety OSHA s Stats

OCTOBER 2017 ISSUE Page 1 of 7

Drilling Morning Report

Rig Math. Page 1.

OREGON HEALTH. Systems Public Water Supply Systems Community Water Supply Systems Source Water Protection

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Flammability Chart. Gas Formula Ignition

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Reclassification and Recompletion

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Oil Well Potential Test, Completion or Recompletion Report, and Log

Abstract Objective Scope of Study Introduction Procedures

SECTION P4 SEPARATION SYSTEMS

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

Model A Sleeve Valve Cement Retainer

3(752/(80 SPECIALTY 3(752/(80 SPECIALTY 5(17$/,1& 5(17$/,1&

Transcription:

MIA Training Example (Catalano 2H) The Catalano 2H is a relatively new 4-string gas well drilled in an area where active underground coal mining is taking place. It is a cased-hole completion and the production string is anchored with cement below the intermediate casing shoe. The well is equipped with two freshwater casing strings one to isolate a shallower coal seam, and a second, deeper string to protect the fresh groundwater interval. It also has intermediate and production strings and is being produced through a tubing assembly. In this example, the inspections began in the first quarter of 2013 and revealed that venting at the well was producing high levels of methane gas in the vicinity of the wellhead. A vent stack was plumbed to the production annulus in the first quarter of 2013 in order to divert methane up and away from the well. Page 1

Catalano 2H Well Schematic and Inspection Components Page 2

MIA Training Example (Catalano 2H) Step 1: Enter basic information, including the operator, well ID and abridged API. a. Well Operator/Owner (cell/box 1.): Operator A 1. Only needs to be done once for the entire form b. Operator Assigned ID (cell/box 2.): Catalano 2H c. Abridged API # (cell/box 3.): 063-45879 Step 2: Enter well construction information under cells/boxes 4-8. This only needs to be done once for the life of the well, unless a change is made to the construction of that well. a. Well Type (cell/box 4a.): Gas b. Well Construction Information Not Readily Available (cell/box 4b.): N/A c. Water Level Accessible (cell/box 5.): N/A d. Freshwater Casing Only (cell/box 6.): N e. Annular Production (cell/box 7.): N f. Annular Production Inside Surface or Coal Casing String (cell/box 8.): N/A Step 3: Enter the number of casing strings and click Customize Data Tables. a. Number of Casings Strings, Excluding Conductor Pipe, Tubing, and Liners (cell/box 9): 4 b. Click (cell/box 9): Customize Data Tables Steps 2 and 3 set up the rest of Form A. Step 4: Enter the Surface or Coal Casing Set Depth in feet (ft), if applicable, and then enter the first quarterly inspection date. a. Surface or Coal Casing Set Depth (ft) (cell/box 10.): N/A b. Q1 Date (cell/box 11.): 2/12/13 Page 3

Step 5: Fill out Section 13 Wellhead Pressure or Water Level for Q1. In this case, leave Section 12 blank for Q1 because this is a new well entry in Form A and, thus, there are no previous data to transfer from either the 4 th quarter of the previous year or previous quarter of the current year. a. Primary Production Gas Pressure (psig) (cell/box 13a.): 55 b. Produced Annular Gas Pressure(psig) (cell/box 13b.): N/A c. Shoe Test Pressure (psig) (cell/box 13c.): N/A d. Annulus (cell/box 13d.): N/A e. Water Level (ft) (cell/box 13e.): N/A f. Average Daily Pumping Time (hours) or average daily pumping volume (bbls) (If no produced water, Indicate NPW ) (cell/box 13f.): N/A g. Produced Water Quality Specific Conductance (μs or μmhos)/cm) (cell/box 13g.): N/A Step 6: Fill out Section 14 Flow or Pressure in Production Annulus for Q1. a. Production Annulus Status (cell/box 14a.): Choose button labeled Shut-in b. Production Annulus Flow (scfpd) (cell/box 14b.): N/A c. Production Annulus Pressure (psig) (cell/box 14c.): 25 d. Time Since Production Annulus Was Last Blown Down (days) (cell/box 14d.): 1 e. Cement Top in Production Annulus Above Next Outer Casing Shoe (cell/box 14e.): N f. Annulus (cell/box 14f.): P (auto populated) Page 4

Step 7: Fill out Section 15 Measurement or Best Estimate of Leaking/Venting Gas Quantity for Q1. a. Annulus (cell/box 15a.): I b. Flow (scfpd) (cell/box 15b.): 25 c. Annulus Shut-in (cell/box 15c.): N d. Annulus (cell/box 15d.): S/C e. Flow (scfpd) (cell/box 15e.): 0 f. Annulus Shut-in (cell/box 15f.): N g. Annulus (cell/box 15g.): S/C 1 h. Flow (scfpd) (cell/box 15h.): 0 i. Annulus Shut-in (cell/box 15i.): N j. Annulus (cell/box 15j.): N/A k. Flow (scfpd) (cell/box 15k.): N/A l. Annulus Shut-in (cell/box 15l.): N/A m. Surface/Wellhead Equipment/Outside Conductor (cell/box 15m.): N Step 8: Fill out Section 16 Liquid Hydrocarbon Flows for Q1. a. Annulus (cell/box 16a.): P (auto populated) b. Y/N/I (cell/box 16b.): N c. Annulus (cell/box 16c.): I (auto populated) d. Y/N/I (cell/box 16d.): N e. Annulus (cell/box 16e.): S/C (auto populated) f. Y/N/I (cell/box 16f.): N g. Annulus (cell/box 16g.): S/C1 (auto populated) h. Y/N/I (cell/box 16h.): N i. Annulus (cell/box 16i.): N/A j. Y/N/I (cell/box 16j.): N/A k. Surface/Wellhead Equipment/Outside Conductor (cell/box 16k.): N Page 5

Step 9: Fill out section 17 Non-Freshwater Flows for Q1. a. Annulus (cell/box 17a.): P (auto populated) b. Y/N/I (cell/box 17b.): N c. Annulus (cell/box 17c.): I (auto populated) d. Y/N/I (cell/box 17d.): N e. Annulus (cell/box 17e.): S/C (auto populated) f. Y/N/I (cell/box 17f.): N g. Annulus (cell/box 17g.): S/C1 (auto populated) h. Y/N/I (cell/box 17h.): N i. Annulus (cell/box 17i.): N/A j. Y/N/I (cell/box 17j.): N/A k. Surface/Wellhead Equipment/Outside Conductor (cell/box 17k.): N Step 10: Fill out Section 18 Safe Venting and check for Corrosion Problems for Q1 in Section 19. a. Gas Leaking or Venting to Atmosphere (cell/box 18a.): Y (auto populated) b. Wellhead Hydrogen Sulfide (ppm) (cell/box 18b.): 0 c. Wellhead Methane (%LEL) (cell/box 18c.): 20% d. Corrosion Problems (cell/box 19.): N Page 6

Step 11: Fill out the Comments section, if needed; and check to see if Immediate DEP Reporting is Necessary based on the information entered in Form A for Q1. The option to Reset this portion of Form A is available as well. This function will only reset the four rows associated with this well. a. Comments (cell/box 20.): High LEL near wellhead due to venting gas; install vent stack b. Immediate DEP Reporting Necessary (cell/box 21.): N (auto populated) c. Reset (cell/box 22): N/A Step 12: Once you have finished inputting all data for Q1, return to Section 11 Quarterly Inspection Information and enter the date of the Q2 inspection. Next, fill out Section 12 All Well MIA Conditions Unchanged from Previous Quarter, which will transfer all data from the previous quarter. This function is useful when only a few conditions or no conditions at all change at the well. a. Q2 Date (cell/box 11.): 5/10/13 b. All Well MIA Conditions Unchanged from Previous Quarter (cell/box 12.): Y c. Click: Transfer Previous Quarter s Data Page 7

Step 13: Once all data from the previous quarter have been transferred, make the following changes to Sections 13, 14, 15 and 18 for this example. Sections 16, 17, 19 and 20 require no changes from the previous quarter. a. Section 13 1) Primary Production Gas Pressure (psig) (cell/box 13a.): 52 b. Section 14 1) Production Annulus Pressure (psig) (cell/box 14c.): 23 c. Section 15 1) Flow (scfpd) (cell/box 15b.): 15 d. Section 18 1) Wellhead Methane (%LEL) (cell/box 18c.): 1% Page 8

Step 14: Once you have finished inputting all data for Q2, return to Section 11 Quarterly Inspection Information and enter the date of the Q3 inspection. Next, fill out Section 12 All Well MIA Conditions Unchanged from Previous Quarter, which will transfer all data from the previous quarter. a. Q3 Date (cell/box 11.): 9/2/13 b. All Well MIA Conditions Unchanged from Previous Quarter (cell/box 12.): Y c. Click: Transfer Previous Quarter s Data Step 15: Once all data from the previous quarter have been transferred, make the following changes to Sections 13, 14, 15 and 18 for this example. Sections 16, 17, 19 and 20 require no changes from the previous quarter. a. Section 13 1) Primary Production Gas Pressure (psig) (cell/box 13a.): 51 b. Section 14 1) Production Annulus Pressure (psig) (cell/box 14c.): 29 c. Section 15 1) Flow (scfpd) (cell/box 15b.): 30 d. Section 18 1) Wellhead Methane (%LEL) (cell/box 18c.): 2% Page 9

Page 10

Step 16: Once you have finished inputting all data for Q3, return to Section 11 Quarterly Inspection Information and enter the date of the Q4 inspection. Next, fill out Section 12 All Well MIA Conditions Unchanged from Previous Quarter, which will transfer all data from the previous quarter. a. Q4 Date (cell/box 11.): 11/13/13 b. All Well MIA Conditions Unchanged from Previous Quarter (cell/box 12.): Y c. Click: Transfer Previous Quarter s Data Step 17: Once all data from the previous quarter have been transferred, make the following changes to Sections 13, 14, 15 and 18 for this example. Sections 16, 17, 19 and 20 require no changes from the previous quarter. a. Section 13 1) Primary Production Gas Pressure (psig) (cell/box 13a.): 56 b. Section 14 1) Production Annulus Pressure (psig) (cell/box 14c.): 24 c. Section 15 1) Flow (scfpd) (cell/box 15b.): 25 d. Section 18 1) Wellhead Methane (%LEL) (cell/box 18c.): 3% Page 11

Final: This concludes the Catalano 2H example. Page 12