the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

Similar documents
WELL SUSPENSION AND ABANDONMENT GUIDELINES AND INTERPRETATION NOTES OFFICE OF THE REGULATOR OF OIL AND GAS OPERATIONS

Casing and Cementing Requirements

IDEM Indiana Department of Environmental Management Office of Land Quality P.O. Box 6015 Indianapolis, IN OLQ PH: (317)

METHOD 21 - DETERMINATION OF VOLATILE ORGANIC COMPOUND LEAKS. 1.2 Scope. This method is applicable for the

Subparts AA and BB - The Other RCRA Air Rules. Beginners aabb

Frequently Asked Questions Directive 056 Facilities Technical

The Alberta Energy Regulator (AER) has approved this directive on January 31, Introduction Purpose of This Directive...

Directive 059: Well Drilling and Completion Data Filing Requirements

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Misuse of Combustible Gas Meters

Reclassification and Recompletion

Proposed Uniform Standards for Equipment Leaks

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

MIA Training Example (Catalano 2H)

Flammability Chart. Gas Formula Ignition

OK.Company has 24 months from shut in to achieve suspension compliance. 29 Mar 2016

EQUIPMENT AND MATERIALS

Hygea Ultrasonic Validation Kit

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Verification Of Calibration for Direct-Reading Portable Gas Monitors

Contact Information. Progressive Optimization Service. We Provide: Street Bay #2. Grande Prairie, AB T8V - 4Z2

Oilfield Safety OSHA s Stats

UTAS EH&S INSTRUCTION No. 036 June 2012 Revision No. 3. Purging of Flammable Gas Equipment and/or Piping (Explosion Hazard)

Disposal/Injection Well Pressure Test Report (H-5)

Smart Water Application Technologies (SWAT) TM

Working in Gas Hazard Areas

1 Introduction Purpose of the Directive AER Requirements What s New in This Edition Overview...

Inflatable Packers for Grouting 11/10/00

Flammable Environments Guideline

COGCC OPERATOR GUIDANCE MECHANICAL INTEGRITY TEST GUIDANCE: PRACTICES AND PROCEDURES

The FLUX-METER: implementation of a portable integrated instrumentation for the measurement of CO 2 and CH 4 diffuse flux from landfill soil cover.

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

How HSE regulates onshore oil and gas

Confined Space ACOP L101

Diagnosing EVAP systems By: Bernie Thompson

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

Calibration Requirements for Direct Reading Confined Space Gas Detectors

Product Test Report F.A. Lennon Drive December 2015 Solon, Ohio U.S.A. Page 1 of 7. Valve Series Description Test Pressure Test Qty.

Table of Contents. Operating Instructions. Resource v.2 Conserving Regulator

MIA Training Example (Beattie No. 99)

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Texas Administrative Code

Tifft Water Supply Symposium

NATURAL GAS RESPONSE SOG

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

NSPS SUBPART Ka Check-off Form JULY 11, LAFAYETTE ROAD NO., ST. PAUL, MN

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Colorado Oil and Gas Conservation Commission

Chapter 4: Monitoring and Sampling. Chapter 4: Monitoring and Sampling

Mechanical Integrity Assessment Training

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Excavations and Trenches

Model Description

TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Oil and Gas Management

Responding to Natural Gas Pipeline Emergencies

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

Notable Clarifications to Directive 077 Requirements

Oxford Instruments Plasma Technology. PlasmaPro NGP80. Installation Data Sheet. Original Instructions.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

TAQA North Ltd. Well Blowout W4M June 8, 2009

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

INDUSTRIAL HYGIENE GROUP Standard Operating Procedure. TVA-1000 PID/FID Portable Toxic Vapor analyzer. 1 of 9. Contents

Gas Detection. Portable Gas Detection for Safety in Confined Spaces

NEW IGC CODE AND IGF CODE

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

DEVICES FOR FIELD DETERMINATION OF WATER VAPOR IN NATURAL GAS Betsy Murphy MNM Enterprises 801 N. Riverside Drive Fort Worth, Texas 76111

VACUUM TESTING PRECAST CONCRETE MANHOLES

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Testing Services Overview

Captains Meeting 2009 Introduction to Well Testing- Expro. Edwin Schoorl

Project Specific Information Package Kakwa Expansion Pipeline Project

Coal and Water Protection. PADEP: Well Plugging & Subsurface Activities Division Bureau of Oil and Gas Planning & Program Management

Power Transformer Maintenance. Maintenance Practices & Procedures for Substation Class Distribution Power Transformers

USEPA WORKER PROTECTION STANDARD REVISIONS. Department of Pesticide Regulation 2016

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

In-Water Mass Spectrometry for Characterization of Light Hydrocarbon Seeps and Leaks

1.0 PURPOSE 2.0 SCOPE 3.0 DEFINITIONS. ANSI: American National Standards Institute. CCC: Chemical Control Centre

Notes on equipment protection per EN/IEC and NEMA For Bourdon tube or diaphragm pressure gauges

Mass Spec will not Autotune

HAZARDOUS MATERIALS OPERATIONS NFPA 472, 2008 Edition

SITE INSPECTION PROCEDURE FORM

BRITISH COMPRESSED GASES ASSOCIATION Registered office: 4a Mallard Way, Pride Park, Derby, UK. DE24 8GX Company Number: 71798, England

FIRE AND EXPLOSION HAZARD MANAGEMENT

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Commercial Practice Test Method Internal Vapor Analysis of Hermetic Devices

Advanced Test Equipment Rentals ATEC (2832)

e-compliance Training

STANDARD OPERATING PROCEDURES

Type Testing Procedure for Crankcase Explosion Relief Valves

Pressure Regulators. Operating Instructions. Instrumentation

Atmospheric Hazards. Hazardous Atmosphere 3/29/2017. Oxygen deficiency and enrichment Flammable gases and vapors Toxic contaminants

WSC Performance Standard and Recommended Installation Procedures for Sanitary Water Well. Pitless Adapters, Pitless Units, And Well Caps

Subpart L NOTES: NOTES:

PIP PNE00012 Piping Examination and Leak Test Guide

Transcription:

Bulletin 2011-35 December 20, 2011 Surface Casing Vent Requirements for Wells This bulletin clarifies Section 6.100(4) of the Oil and Gas Conservation Regulations (OGCR) and provide additional surface casing annular flow testing options to Interim Directive 2003-01: (1) Isolation Packer Testing, Reporting and Repair Requirements, (2) Surface Casing Vent Flow/Gas Migration Testing, Reporting and Repair Requirements, (3) Casing Failure Reporting and Repair Requirements (ID 2003-01). This clarification specifies the requirements for surface casing vent exemptions. As the ERCB already considers wells that meet the criteria in this bulletin of low risk to public safety and the environment, it has historically granted exemptions on a case-by-case basis for wells that meet these criteria. Although the ERCB has not previously required wells without vent assemblies to test for surface casing annular flow, the ERCB now requires them to be tested. If surface casing annular flow is detected, a vent assembly must be installed to allow for further testing. The new testing requirements will further reduce the risk to public safety and the environment by ensuring that companies and the ERCB can take appropriate action as required in ID 2003-01. This bulletin supersedes all previous surface casing vent assembly exemptions issued under Section 6.100(4) of the OGCR. These exemptions are not applicable to thermal wells, which require a vent assembly. Acceptable testing methods for exempt wells with no surface casing vent assembly have been included in an attachment to this bulletin. Background Section 6.100(1) of the OGCR states: the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2). Currently, licensees must install a vent assembly to comply with this requirement. Section 6.100(4) of the OGCR states: The Board may exempt a well from the requirements of this section [installing a vent assembly] if the well pressures are such that annulus vents are not necessary, or if special circumstances require the vents to remain closed except when checking for pressure in the surface casing. This section does not include exemption criteria. Section 2.3 of ID 2003-01 states: Within 90 days of drilling rig release, licensees must test new wells for a vent flow. The interim directive does not include requirements for testing wells with no vent assembly. Exemption Criteria for Section 6.100(4) of the OGCR Exemption criteria intended to clarify Section 6.100(4) of the OGCR follows. In the event of a gas flow, see the attachment for further testing procedures. ERCB Bulletin 2011-35 1

Existing Wells Wells drilled before the release of this bulletin that have surface casing but no vent assembly are not required to install a vent assembly if the true vertical depth of the well is less than 1000 metres (m), the gas deliverability is less than 28 10 3 m 3 per day absolute open flow (AOF), the hydrogen sulphide (H 2 S) content is 0.00 moles per kilomole, the licensee has completed a satisfactory surface casing annular flow test using the testing procedures in the attachment, and there is no evidence of surface casing annular flow of gas, water, or liquid hydrocarbon. If gas, water, or liquid hydrocarbon is migrating to surface, the licensee must install a permanent vent assembly on the well that meets the criteria outlined in Section 6.100(1) of the OGCR, and test, report, and repair the vent flow in accordance with ID 2003-01. Licensees are required to test all existing wells by October 2013. New Wells Effective immediately, wells drilled with surface casing, as defined in Directive 008: Surface Casing Depth Requirements, do not require a vent assembly if the well meets all exemption criteria for existing wells, the maximum pressure gradient of all zones penetrated is less than 10 kilopascals per metre, the well is drilled in an established area as defined in Directive 008, the production casing cement returns are visible at surface, and the surface casing stub is at or above ground level. If gas, water, or liquid hydrocarbon is migrating to surface, then the licensee must install a permanent vent assembly on the well that meets the criteria in Section 6.100(1) of the OGCR, and test, report, and repair the vent flow in accordance with ID 2003-01. The licensee is required to test new wells within 90 days of the release of the drilling rig. Documentation Once a well has been tested, the licensee must document the test method, results, and conclusions. This information must be made available to the ERCB on request. As required in ID 2003-01, the licensee must retain documentation on the surface casing annular flow test for at least two years after the date of abandonment. General The ERCB s compliance assurance process is in Directive 019: ERCB Compliance Assurance. A list of risk assessed noncompliances is available on the ERCB website at www.ercb.ca under Industry Zone: Compliance and Enforcement: Risk Assessed Noncompliance. 2 ERCB Bulletin 2011-35

Any questions regarding this bulletin, the attachment, or any other matter relating to Section 6.100 of the OGCR or ID 2003-01 may be directed to the ERCB Well Operations Section by e-mail at welloperations@ercb.ca. <original signed by> Robin King Executive Manager Field Surveillance and Operations Branch Attachment ERCB Bulletin 2011-35 3

Attachment Types of Surface Casing Annular Flow Testing Procedures and Gas Identification Techniques This attachment supplements the surface casing flow requirement identified in ERCB Directive 020: Well Abandonment by outlining the acceptable procedures and equipment for testing wells as referenced in Bulletin 2011-35 dated December 20, 2011. Alternative testing methods may be acceptable and will be reviewed by the ERCB on a case-by-case basis. Testing Procedure for Identifying Surface Casing Annular Flow The following steps should be considered when evaluating the need to install a surface casing vent assembly if the surface casing stub is exposed: 1) Identify the presence of gas by using either one of the monitoring instruments listed below or an alternative method approved by the ERCB. 2) Confirm that the gas is not from background sources (e.g., biogenic methane, hydrocarbon-based soil contamination, etc.). 3) If hydrocarbon gas is present, a surface casing vent assembly is required (see Bulletin 2011-35). 4) After the vent is installed, further testing is required in accordance with Interim Directive 2003-01: (1) Isolation Packer Testing, Reporting and Repair Requirements, (2) Surface Casing Vent Flow/Gas Migration Testing, Reporting and Repair Requirements, (3) Casing Failure Reporting and Repair Requirements. The following steps should be considered to determine if further testing is required. The ERCB will accept a buried casing annular volume check if the surface casing stub is not exposed. 1) Create holes 30 centimetres (cm) deep and a maximum of 64 millimetres in diameter at four points around the well at a distance of 30 cm from the wellbore. 2) Isolate the hole from atmospheric contaminations for two to five minutes. 3) Insert measuring equipment at least 25 cm into the hole, ensuring a seal at surface to prevent atmospheric gas from mixing with soil gas. 4) Take the reading, and if gas is present, expose the surface casing and follow the above testing procedure for exposed surface casing. Licensees must be aware of the surrounding environment when using sampler devices such as the lower explosive limit (LEL) meter, toxic vapour analyzers (TVA), and photoionization detection (PID) instruments. In addition, licensees must take into consideration other methane sources such as biogenic methane (swamp gas), hydrocarbon-based soil contamination, and gas migration. Atmospheric conditions such as temperature, wind speed, and humidity must be suitable for drawing a detection sample. Licensees must also sample according to manufacturers standard operating procedures to ensure that a proper sample is obtained. As the source of the surface casing annular flow may be difficult to determine, an organized and methodical sample process should be in place so that a proper inspection can be conducted. The process must be documented and should include a sketch or diagram of the grid search for reference. Gas Identification Techniques The ERCB considers the following testing and monitoring devices acceptable for testing purposes. However, other methods and/or testing equipment (such as acoustical or ultrasonic detection equipment) may also be acceptable and will be evaluated by the ERCB on a case-by-case basis. 4 ERCB Bulletin 2011-35

Below are acceptable monitoring devices and techniques that are acceptable for surface casing annular flow testing procedures. 1) Soap test Spray a soap solution in the annulus between the surface casing and the next casing string. Observe the annulus to determine if any bubbles have formed. If no bubbles are observed, the well is presumed to have no detectable emissions or leaks. If any bubbles are observed, further investigation is required. 2) Portable gas detector method A suspected surface casing annular flow source can be successfully detected using a portable gas detector. This is done by placing an LEL meter (which draws a sample into the instrument) close to the surface casing to determine whether gas is present. A number of factors may influence the test s success and each LEL meter will operate slightly differently. Therefore, it is important to follow the original equipment manufacturers operating specifications. If no gas is detected, the test is finished. If gas is present, further steps must be taken to quantify the leak. 3) Photoionization detection instrument For a PID instrument to be effective for leak detection, it must be set up by the factory to analyze methane gas (CH 4 ). This will ensure that the instrument is not affected by other hydrocarbon gases, chemicals, water, or contaminated soils. 4) Toxic vapour analyzer The TVA (i.e., flame ionization detector) is an instrument similar to the PID. 5) Portable laser methane detector As with the PID instrument, the portable laser methane detector is set to analyze CH 4. As a result, this detector is totally unaffected by other hydrocarbon gases, chemicals, water, or contaminated soils. 6) Infrared camera method A suspected surface casing annular flow source can be scanned with an infrared emissions camera and the identified leak video recorded. If a gas leak is detected, a digital photo of the leak source is taken and the leak identification information is entered into the leak survey data collection sheet. Testing Conditions Environmental conditions such as smog, smoke, high humidity (e.g., fog, rain, snow, sleet), and wind will inhibit subtle gas leak detection. The ability to detect leaks drops significantly when used in ambient temperatures below -10ºC. Documentation Licensees must retain all documentation related to testing methods, results, and conclusions. ERCB Bulletin 2011-35 5