Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Similar documents
Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

TRANSPORTATION ADVISORY BOARD. Metropolitan Council, 390 Robert Street North, Saint Paul, Minnesota 55101

ACTION TRANSMITTAL No

Twin Cities Regional Bicycle System Study

ACTION TRANSMITTAL No

Regional Bicycle System Master Study. Preliminary Results Update

Chapter 7: Bicycle And Pedestrian Investment Direction

Metropolitan Council Transportation Committee. Twin Cities Regional Bicycle Barriers Study

ACTIVE TRANSPORTATION

Hennepin County Bicycle and Pedestrian Planning

Chapter 7 Bicycle and Pedestrian Investment Direction

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

This page intentionally left blank.

Living Streets Policy

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Regional Bicycle Barriers Study

City of Jacksonville Mobility Fee Update

AMATS Complete Streets Policy

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

This page intentionally left blank.

This page intentionally left blank.

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

PEDESTRIAN ACTION PLAN

Chapter 9: Pedestrians and Bicyclists

MASTER BICYCLE AND PEDESTRIAN PLAN

PEDESTRIAN ACTION PLAN

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle and Pedestrian Investment Direction

Bicycle and Pedestrian Plans and Improvements

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Solana Beach Comprehensive Active Transportation Strategy (CATS)

City of Novi Non-Motorized Master Plan 2011 Executive Summary

TABLE OF CONTENTS. Executive Summary

BIKE PLAN CONTENTS GATEWAY

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

What Is a Complete Street?

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

NON-MOTORIZED TRANSPORTATION

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

CHAPTER 7.0 IMPLEMENTATION

Bicycle and Pedestrian Planning in a Historically Car-Centric Culture: A Focus on Connectivity, Safety, & Accessibility

5. RUNNINGWAY GUIDELINES

Goals, Objectives, and Policies

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

Perryville TOD and Greenway Plan

Omaha s Complete Streets Policy

City of Waterloo Complete Streets Policy

This page intentionally left blank.

MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives

PEDESTRIAN ACTION PLAN

Executive Summary Route 30 Corridor Master Plan

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Philip Schaffner Minnesota Department of Transportation October 22, 2013

Evolving Roadway Design Policies for Walking and Bicycling

Bicycle and Pedestrian Connectivity Study Phase 2

Improving intersections for people that walk in Minneapolis

Active Transportation Infrastructure Investment A Business Case

Who is Toole Design Group?

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Beyond First First Last Last Mile Strategies. APA National Conference April 3, 2016 Chelsea Richer, AICP Fehr & Peers

Michael Parmer, Management Aide, City Manager's Office

C C C

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Transportation Master Plan Advisory Task Force

Hennepin/First Transportation Study

Plant City Walk-Bike Plan

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Welcome. Background. Goals. Vision

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

ACTION TRANSMITTAL No

City of Charlottesville Bicycle and Pedestrian Master Plan Update

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Non-Motorized Transportation 7-1

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Ajax: The Road to Complete Streets

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CITY MANUALS AND STANDARDS REVIEW

MnDOT Implementation of Complete Streets Policy. January 2014

North Coast Corridor:

2.0 Existing Conditions

COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

ADA TRANSITION PLAN 2013

CITY OF PORTSMOUTH PLANNING DEPARTMENT

Hennepin County Pedestrian Plan Public Comment Report

Bicycle Boulevards and Neighborhood Greenways

Madison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process

City of Moorhead Committee of the Whole Meeting

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

2014 Bellingham Bicycle Master Plan

CONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan

Transcription:

Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017

Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we headed? How will we get there? What changes are expected in this update? 2

Where are we now? Bicycling & Walking in the Twin Cities

Current TPP Purpose of Bike/Ped Chapter to: Describe trends in biking/walking for transportation Report new developments in planning and infrastructure Set region s vision for bicycle infrastructure planning and investment. Provide/highlight pedestrian/bike planning best practices Provide regional guidelines for investment through city, county, state & Regional Solicitation funds. 4

Bicycle System Facilities Bicycle Infrastructure consists of: Protected bikeways On-street bike lanes (incl. buffered) Off-road trail networks (paved) Designated bike parking facilities Route & wayfinding signage Bike-specific traffic signals 5

Pedestrian Facilities Infrastructure consists of Sidewalks, curb ramps, & streetscaping Street intersection treatments (crosswalks, curb extensions, signals, medians, etc.) Multi-use trails play vital role in accommodating pedestrians Regional trails Local, street-adjacent trails Local off-road trails 6

Biking & Walking Trends Will reiterate 2000-2010 trends from Travel Behavior Inventory Include recent updates from federal, city, and/or state data reports More people actively walking & biking for transportation and recreation More biking occurring in winter months 7

Biking & Walking Trends Pedestrians overrepresented in region s traffic fatalities FHWA emphasis on ADA compliance Title II requirements for public agencies with self-evaluations or transition plans 8

Regional Bicycle System Inventory Regional Bicycle System Mileage Summary Type On-Street Off-Street Undefined Total Bikeways Trails Existing 1,878 2,030 -- 3,908 Planned 1,032 820 1,013 2,865 Total 2,910 2,850 1,013 6,773 9

New Developments Bicycle Infrastructure Protected separated bikeways are being planned and implemented by cities and counties Minneapolis Amended Bicycle Master Plan with Protected Bikeways Update (2015) Goal to construct 30 miles by 2020 Saint Paul Amended city Bicycle Plan to include the downtown Capital City Bikeway (partly constructed) Complete 4-mile loop of Downtown to be implemented with connections to other bikeways 10

New Developments Bicycle Infrastructure Hennepin & Ramsey Counties have included protected or separated bike facilities in their updated bike & pedestrian plans Other counties and suburban cities are updating plans and may consider protected bikeway components Major bridges over the Mississippi & Minnesota Rivers were constructed with new bikeways Lafayette Bridge, St Paul US 169 Bridge, Shakopee & Eden Prairie New TH 36 Bridge 11

New Developments Pedestrian/Bike Data Collection MnDOT s Bicycle and Pedestrian Counting Initiative Training Permanent monitoring stations (10-12 in Twin Cities) Encouragement to do automated counts equipment loan program Published a data collection manual to supplement the federal Traffic Monitoring Guide 12

Where are we headed? Bicycle & Pedestrian TPP Planning Framework

TPP Planning Framework Goals Transportation System Stewardship Safety and Security Access to Destinations Competitive Economy Healthy Environment Objectives (Bike/Ped-related Only) Preserve and maintain bike/ped system in a state of good repair Reduce crashes & improve safety for bike/ped modes Increase share of trips taken using biking or walking Improve bike/ped options for all ages & abilities Improve bike/ped access to job concentrations Invest in bike/ped infrastructure to attract and retain businesses and residents Reduce air emissions from transportation sources Increase availability and attractiveness of biking & walking to encourage healthy communities & car-free lifestyles Leveraging Investments to Guide Land Use Focus growth to support full range of multimodal travel Encourage local land use/design to integrate all modes 14

How will we get there? Bicycle & Pedestrian Investment Direction

Current TPP Regional Bicycle Trans. Network (RBTN) Goals Establish an integrated/seamless network of on- and off-street bikeways Provide vision for a backbone arterial network for daily bicycle transportation Encourage cities, counties, parks agencies, and the state to plan and implement future bikeways 16

Current TPP RBTN Guiding Principles Overcome physical barriers & eliminate system gaps Facilitate safe and continuous trips to regional destinations Accommodate a broad range of cyclist abilities and preferences Integrate &/or supplement existing & planned infrastructure Consider opportunities to enhance economic development 17

Current TPP RBTN Guiding Principles (cont.) Function as arteries to connect regional destinations & transit system year round Provide improved opportunities to increase bicycle mode share Connect to local, state & national bikeways Be equitably distributed throughout the region Consider regional priorities reflected in adopted bicycle plans Follow spacing guidelines to reflect established development and transportation patterns 18

19

Investment Direction Regional Priorities RBTN investment Proposed projects that enhance or complete new segments or connections of the RBTN Critical bicycle transportation links Closes a gap in RBTN Improves continuity/connections between jurisdictions (on or off RBTN) Removes a physical barrier (e.g., river, rail line, freeway) & can be on or off RBTN 20

Investment Direction Regional Priorities Other key prioritization factors Stand-alone pedestrian projects connecting to transit or regional job centers Safety enhancements Cost effectiveness for construction and/or maintenance Multimodal benefits incorporated in roadway projects Bicycle connections to transit Upgrades through existing facility reconstruction 21

What Changes are expected for Bike/Pedestrian chapter?

TPP Changes Incorporation of Studies Regional Bicycle Barriers Study Map of regional barriers Includes streams & rivers, major rail lines, freeways & expressways Map of ~ top 150 regional barrier crossing improvement locations (tiered) Map of major rivers with existing/planned bikeway crossings Update guidelines for regional investment 23

TPP Changes RBTN Updates Designated alignments within existing corridors will be added Other changes resulting from county/city meetings and other communications since last update RBTN Corridor and Alignment adjustments will be proposed New proposed RBTN map to show changes List of changes and planning rationale 24

TPP Changes Funding Sources Update Federal TAP conversion to Surface Transportation Program Block Grant Setaside Program (STPBG Set-aside) State Active Transportation grant program was established in trans. appropriations bill No funds were authorized through the legislation Framework for future state funds to be appropriated by legislature & administered through MnDOT 25

TPP Changes Other Text Revisions Bike/ped safety related to traffic speeds Add best practice references: Complete streets design & policy/planning guides Bike & ped data collection & applications Direction for local bikeways data updates for regional system inventory Information on improving pedestrian safety Reinforcement of the need for ADA compliance 26

Possible Work Plan Items RBTN Protected Bikeway Corridors Study Analysis of RBTN & local bikeway connections to regional transit system Analysis of pedestrian connections to regional transit system Updates to regional bicycle system inventory Regional pedestrian and bicycle crash data analysis 27

Thank you Questions? Steven Elmer, AICP steven.elmer@metc.state.mn.us 651-602-1756 Heidi Schallberg, AICP heidi.schallberg@metc.state.mn.us 651-602-1721