Board of Supervisors February 27, 2017

Similar documents
Plant City Walk-Bike Plan

Thank you for attending

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Giles Run Connector Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

Washington St. Corridor Study

Tonight is for you. Learn everything you can. Share all your ideas.

Pennsylvania Avenue (CR 484) Design Alternatives Study

Route 47 (North Main Street) Reconstruction

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

Executive Summary Route 30 Corridor Master Plan

Chapter 2: Standards for Access, Non-Motorized, and Transit

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

122 Avenue: 107 Street to Fort Road

Bay to Bay Boulevard Complete Streets Project

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Intersection Traffic Control Feasibility Study

Bridges and Arizona Crossings

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

NORTH DOWNTOWN N EAST WEST

CDOT s Transportation Plan for the Obama Presidential Center in Jackson Park

Clackamas County Comprehensive Plan

Paoli Road Improvement Feasibility Study

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Public Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Public Works and Infrastructure Committee. General Manager, Transportation Services

5. RUNNINGWAY GUIDELINES

US Route 4 Traffic and Pedestrian Improvement Project

Hidden Oaks Elementary School

RZC Appendix 8A Marymoor Subarea Street Requirements

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

North Shore Transportation Improvement Strategy

Terwillegar Drive Expressway Draft Concept Plan

Fleur Drive Reconstruction

Building Great Neighbourhoods BONNIE DOON

City of Birmingham Draft Multi-modal Transportation Plan

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Transportation Impact Study for Abington Terrace

WELCOME Public Information Centre

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Foothill Expressway Improvements Between El Monte and San Antonio

Preliminary Engineering Study

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Windy Ridge Elementary School

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

CITY OF LOMITA CITY COUNCIL REPORT

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Water Street Promenade Engineering and Design Services

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

GIS Based Non-Motorized Transportation Planning APA Ohio Statewide Planning Conference. GIS Assisted Non-Motorized Transportation Planning

Building Great Neighbourhoods QUEEN ALEXANDRA

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

COMMUNITY MEETING AGENDA

This page intentionally left blank.

Station Plan: Penn & 43rd Avenue

TRANSPORTATION COMMISSION Agenda Staff Report

Living Streets Policy

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

Readington Road (C.R. 637) Construction

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Presentation Outline. Project/Study Purpose. Existing Conditions. Future Conditions. Understanding the Streetside. Similar Walkable Environments

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

City of Memphis On-Street Parking Modification Guidelines

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Transportation Corridor Studies: Summary of Recommendations

NJDOT Complete Streets Checklist

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Transcription:

: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities

Presentation Overview Background Summary of Traffic Analysis Results Draft Conceptual Plan Next Steps Page 2

: Today Page 3

Crash History Source: Reading Eagle (www.readingeagle.com) Page 4

PennDOT Resurfacing Project Construction Anticipated Spring 2018 Page 5

Goals Improve safety Reduce travel speeds Promote Main Street Bicycle and pedestrian connections Landscaping and corridor greening Support local businesses and redevelopment opportunities Minimize impacts to residents Maintain traffic flow Road Diet Evaluation DRAFT Conceptual Plan of Improvements Page 6

What is a Road Diet? Reduction in travel lanes and reallocating the space for other uses Source: Road Diet Informational Guide, FHWA, November 2014. Page 7

Road Diet Evaluation Page 8

Traffic Capacity Analysis Level-of-Service Definition Signalized Intersections Page 9

Existing Peak Hour Traffic Volumes 560 (925) [920] 50% (47%) [48%] 585 (825) [1020] 53% (45%) [50%] 1100 (945) [1250] 59% (40%) [53%] 1025 (960) [1100] 61% (41%) [51%] 1055 (1010) [1075] 57% (43%) [51%] 630 (815) [810] 52% (50%) [54%] PERKIOMEN AVENUE (S.R. 2021) 570 (1035) [1090] 50% (53%) [52%] BOSCOV S DRIVEWAY 525 (995) [1000] 47% (55%) [50%] E. NEVERSINK ROAD (S.R. 2039) 780 (1440) [1090] 41% (60%) [47%] 37 TH STREET 650 (1355) [1045] 39% (59%) [49%] 36 TH STREET 785 (1320) [1025] 43% (57%) [49%] OLEY TURNPIKE (S.R. 2034) 575 (830) [695] 48% (50%) [46%] # WEEKDAY AM PEAK HOUR TRAFFIC VOLUME (#) WEEKDAY PM PEAK HOUR TRAFFIC VOLUME [#] SATURDAY MIDDAY PEAK HOUR TRAFFIC VOLUME #% DIRECTIONAL SPLITS Source: Traffic counts from Traffic Signal Design Report for SR 2021, Section 03M Pavement Rehabilitation Project, prepared by JMT, March 2016. Page 10

Future (2037) Peak Hour Traffic Volumes 660 (1080) [1070] 50% (47%) [48%] 685 (960) [1190] 52% (45%) [51%] 1280 (1400) [1455] 58% (46%) [53%] 1195 (1120) [1285] 61% (41%) [51%] 1230 (1130) [1255] 57% (42%) [51%] 735 (950) [945] 52% (50%) [54%] PERKIOMEN AVENUE (S.R. 2021) 670 (1210) [1270] 50% (53%) [52%] BOSCOV S DRIVEWAY 620 (1155) [1165] 48% (55%) [49%] E. NEVERSINK ROAD (S.R. 2039) 910 (1670) [1270] 42% (54%) [47%] 37 TH STREET 760 (1580) [1220] 39% (59%) [49%] 36 TH STREET 915 (1535) [1195] 43% (58%) [49%] OLEY TURNPIKE (S.R. 2034) 670 (965) [810] 48% (50%) [46%] # WEEKDAY AM PEAK HOUR TRAFFIC VOLUME (#) WEEKDAY PM PEAK HOUR TRAFFIC VOLUME [#] SATURDAY MIDDAY PEAK HOUR TRAFFIC VOLUME #% DIRECTIONAL SPLITS Source: Traffic counts from Traffic Signal Design Report for SR 2021, Section 03M Pavement Rehabilitation Project, prepared by JMT, March 2016. Page 11

Existing Conditions Four Travel Lanes On-street Parking (in select locations) P P Page 12

Existing Peak Hour Levels-of-Service

Full Road Diet Two Travel Lanes Center Turn Lane Opportunities for: On-street Parking (both sides) Bicycle/Pedestrian Facilities Sidewalks Multi-use Trail Bicycle Lanes P P Page 14

Existing Peak Hour Levels-of-Service with Full Road Diet

Modified Road Diet Three Travel Lanes Two Northbound One Southbound Center Turn Lane Opportunities for: On-street Parking (both sides) Bicycle/Pedestrian Facilities Sidewalks Multi-use Trail Bicycle Lanes P P Page 16

Existing Peak Hour Levels-of-Service with Modified Road Diet

PennDOT s Plan (Center Left Turn Lane) Four Travel Lanes Center Turn Lane On-street Parking East Side (in select locations) Opportunities for: On-street Parking (one side) Bicycle/Pedestrian Facilities Sidewalks Bicycle Lanes P Page 18

Existing Peak Hour Levels-of-Service with PennDOT s Plan (Center Left Turn Lane)

40 th Street Connector Page 20

40 th Street Connector Page 21

Existing Conditions E. NEVERSINK TO 37TH STREET (Southern Section) Mix of land uses, including single family residential homes and retail establishments Wide and undefined commercial driveways (east side) Steep slopes adjacent to the roadway (west side) Utility poles (west side) Limited sidewalks Limited on-street parking (near 37 th ) Page 22

E. Neversink To 37th Street EXISTING Looking North Shoulder Shoulder 66 DRAFT PROPOSED Looking North 58 Page 23

Existing Conditions 37TH STREET TO BEECHWOOD DRIVE (Central Section) Mix of land uses, including single family homes and professional offices Frontage road (west side) Existing continuous sidewalks Established street trees On-street parking utilized (particularly on east side) Page 24

37th Street to Beechwood Drive EXISTING Looking North Varies Varies DRAFT PROPOSED 66 Looking North 66 Page 25

Existing Conditions Oley Turnpike BEECHWOOD DRIVE TO OLEY TURNPIKE (Northern Section) Mix of land uses, including single family residential homes and retail establishments Wide and undefined commercial driveways and parking areas (east side) Frontage road(west side) Limited sidewalks Limited on-street parking Page 26

Beechwood Drive To Oley Turnpike EXISTING Looking North Shoulder Shoulder 66 DRAFT PROPOSED Looking North 58 Page 27

Key Elements of DRAFT Conceptual Plan Center left turn lane On-street parking (east side between 37 th and Beechwood) Curb extensions (between 37 th and Beechwood) Continuous sidewalk (east side) Grass buffer area (between curb and sidewalk on the east side) Street trees (within buffer area) Ornamental pedestrian-scale lighting (east side) Access management: Defined driveways (east side) Potential 37 th Street left turn lane Page 28

DRAFT Conceptual Plan Overview Depicts improvement concepts and evaluates feasibility Based on PennDOT s plans, aerial imagery, GIS data, and field inventory Not based on topographic survey Does not include potential impacts to right-of-way, utilities, etc. Further engineering necessary to implement improvements Page 30

See DRAFT Conceptual Plan Exhibits Page 31

Next Steps Public Input Draft Conceptual Plans available on the Township s website Future Board of Supervisors Meeting Coordination with PennDOT Finalize Report Page 32