Safe Use of Explosives in Construction. Safe to Blast. Information Sheet

Similar documents
This standard comprises the following:

Fall Protection at the Top of the Quarry Face

COMPLIANCE CHECK to the AEISG CODE

Safe distances when using explosives

VTCA Safety Seminars Blasting Safety

Oral Exam Explosives

GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES

(Health, Safety, and Welfare)

Geotechnics, Face and Stockpile Operations

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

PROCEDURES FOR STANDBY

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

Health and safety at quarries

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Policy Redesign Project. Plant Safety Policy. Table of Contents

Health & Safety Policy & Plan. Rightway Roofing.

Work Health Safety Record Management Guidelines. October, 2014

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009

Apprenticeship Training Standard. Surface Blaster. Trade Code: 278B. Development Date: January 2003

SOP. Working in Confined Spaces

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

EXPLOSIVES An Introduction By Nigel Cooper. What is an explosive?

LONE WORKING HEALTH AND SAFETY GUIDANCE

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

Newtown Neighbourhood Centre

Lone Working Guidance for University Departments and Functions December 2009 Safety Services Office

Plant Isolation Lock out/tag out Procedure

Risk Assessment RA-1. Risk Assesment

Method Statement Author

Safe work method statements

Dangerous Substances and Explosive Atmosphere Regulations 2002 Appendix 2 Detailed assessment & zone classification where DSEAR applies to an area

Compliance with Health & Safety legislation

Health, Safety and Welfare Policy

OCCUPATIONAL HEALTH AND SAFETY ACT AND REULATIONS: 85 OF 1993 (FULL VERSION)

To comply with the OHS Act, the responsible manager must carry out and document the following:

Confined Space Entry Program

WORKPLACE SAFETY AND HEALTH ACT (CHAPTER 354A) WORKPLACE SAFETY AND HEALTH (CONFINED SPACES) REGULATIONS 2009

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

CONTRACTOR SAFETY INDUCTION HANDBOOK

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

Input relevant details relating to your trading name, address and any relevant contact details. Organisation Name Trading address

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

WHS record keeping requirements

PSSI 6 Demarcation of Work Areas in Substations

CONTROL OF HAZARDOUS ENERGY

Contractor handbook. Purpose

Electrical Safety. Hazard Awareness

DRIVER FATIGUE MANAGEMENT PLAN

Hazard Communication Plan (HCP) 29 CFR

Status Date Prepared Reviewed Endorsed Approved

2014 No. HEALTH AND SAFETY. The Mines Regulations 2014

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

C167 Safety and Health in Construction Convention, 1988

MANITOBA LABOUR AND IMMIGRATION WORKPLACE SAFETY AND HEALTH. Code of Practice. For the Use of Explosives

How HSE regulates onshore oil and gas

Falling Supervisor Certification Assessment

Industry Code: Alberta Small Employer OHS Legislated Requirements

Health, Safety & Environmental Policy. Rotec Hydraulics Ltd

DRAFT. Dublin City Council Control of Stationless On-Street Bicycle Hire Bye-Laws 2017.

Delaware State University

HSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Government Gazette Staatskoerant

LADDERS FIXED AND PORTABLE

List all key terms and acronyms used in the procedure, and their definitions.

CITB Construction site safety update

Working at Height Regulation 2005

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Confined Space Entry Safety Program

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

DRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES

Health and Safety Inspection Procedure

OPERATING CODE NO. 8 APPENDIX 2

Part 1 Preliminary... 3

General Isolation Procedures

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

Monitoring excavation in the highway

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

Contractor / Exhibitor Handbook

Hampstead Hill School Health and Safety Policy: Confined Spaces

Work Activity (e.g. Road Work): Work Location:.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

WORKING ALONE PROGRAM

DSEAR Assessment. To be completed in conjunction with any generic risk assessment for the task/activity being undertaken.

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Explosives Regulations 2014 Safety provisions

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Contractor OHS Induction. AOHS-05-GUI September 2016

Status Date Prepared Reviewed Endorsed Approved

Removal of Lead-Based Paint

Transcription:

Safe Use of Explosives in Construction Safe to Blast Information Sheet This guide has been developed to provide general information to site management on issues dealing with safe use of explosives on construction sites. The availability of commercial explosives is regulated under the Explosives Act 1875 and associated Explosives Regulations. Explosives are strictly controlled and a person may not import, store or manufacture explosives without a license issued by the Department of Justice and Equality. Under the Safety, Health and Welfare (Construction) Regulations 2013 Part 8: Explosives; clear duties are detailed on the use of explosives on construction sites. This information sheet will cover the use and operation of explosives in the field and will look at the following key areas; appointments, shotfiring rules, planning / blast specification, risk assessment, charging, danger zones & misfires. Explosives Primer Detonator Picture 1: Typical Explosive s Components Picture 2: Typical Blast Shelter Appointments The Regulations impose clear and specific duties on Contractors under Part 8 Explosives; Appointments of the following competent persons must be made by the contractor in writing and confirmation of acceptance of these appointments must also be received in writing; -Explosives Supervisor -Shotfirer & Trainee Shotfirer -Storekeeper (Where required) These persons must have sufficient experience, knowledge, training to carry out their roles safely; on acceptance of their appointments they must confirm this in writing to the contractor. Note: The Explosives Supervisor and Shotfirer can be appointed to both positions. Explosives Supervisor The explosives supervisor must be appointed in writing by the contractor. The explosives supervisor must be competent and have sufficient experience to carry out the role. The contractor must ensure that at no time is there more than one person acting as the Explosives Supervisor at the site. The explosives supervisor is required to carry out key duties such as; 1. Preparing a written blast specification which includes; a. Minimising the risk of flyrock being projected outside the declared danger zone. b. Minimising the risk of misfires. c. Determining the location of misfired shots.

2. Communication with the appointed shotfirer. 3. Supervision. 4. Amending the blast specification where necessary e.g. to suit local conditions. Shotfirer All shotfirers must possess sufficient practical and theoretical knowledge and experience to perform their full range of duties. All persons carrying out shotfiring duties must be in possession of a SOLAS CSCS Shotfiring registration card. A trainee shotfirer must work under the supervision of an experienced shotfirer, until the necessary competence has been acquired and demonstrated. Shotfiring Operations may include; Priming Cartridges Charging & Stemming Holes Linking and Connecting Shots Withdrawal & Sheltering of Persons Inspection & Testing of a Shotfiring Circuit Firing a Shot Checking for Misfires Destroying Surplus Explosives Shotfiring Rules Shotfiring rules must be drafted and implemented on site wherever blasting is planned to be carried out by the contractor. The purpose of shotfiring rules is to ensure that practical operating procedures are in place, that they are understood and acted on so as to ensure the safety of the workforce and members of the public in the vicinity of operations. The key points to be included in any Shotfiring Rules are; (a) The appointments and authorisation of explosive supervisors, shotfirers, trainee shotfirers, and others working with explosives; (b) The explosives supervisor / shotfirer to check that: (i) The equipment provided is suitable and safe; and (ii) Site conditions are in line with the blast specification before working with explosives; (c) Times when shotfiring is permitted; (d) The determination of the danger zone likely to be created by the firing of each shot, the evacuation and control of the danger zone and the provision of effective shelters when a shot is tested or fired; (e) Warning systems including, as appropriate: (i) The use of flags or notices; (ii) A system of audible signals to warn people to withdraw from the danger zone and to give the all clear; (iii) he posting of sentries; (f) Inspection of the blast site after firing to check the blast area and whether a misfire has occurred; (g) Ensuring that normal working is resumed only when the shotfirer is fully satisfied that it is safe and the all clear is sounded; (h) Safeguarding charged, but unfired shot-holes at the end of the working day. These arrangements should ensure that someone is in attendance or within sight of the charged holes at all times to prevent theft or unauthorized initiation of the explosives (including detonators);

(i) Dealing with misfires and the discovery of unfired explosives from previous operations. There must always be a competent person available, normally the explosives supervisor, to ensure that any misfire is dealt with safely; (j) Safe disposal of surplus explosives (including detonators) that may remain after completion of shotfiring; and (k) Monitoring arrangements to ensure the rules are complied with. Planning / Blast Specification The purpose of the blasting specification is to minimise the risk associated with the firing of shots. The blasting specification must be specific to each blast, and take account of site conditions. The specification should be designed to achieve the following goals: Minimise the risk of flyrock being projected outside of the declared danger zone; Minimise the risk of misfires; Enable the location of any misfired shots to be accurately determined. The specification should take account of: (i) Experience gained from previous blasts at the construction site; (ii) Any unusual circumstances which are present or likely to arise; and (iii) he design of the excavation required. The following matters need to be addressed when planning, preparing and undertaking a blast: 1. The location on a construction site to be blasted; 2. A drilling plan / log should be prepared showing the hole positions, the length, diameter and the angle of inclination of each hole and direction to which the drill is to be set for each hole. It should also consider the surface position and number or other identifier for each shothole; the angle of inclination, direction, length and diameter of, and extent of any sub grade drilling for each completed shothole; 3. The burden ( burden - distance from hole to exposed face) around each shothole should be adequately determined. 4. The quantity, type and position of explosives and stemming material used; 5. The system of initiation, including full details of any delay sequence and timing; 6. The danger zone, shotfiring position and sentry positions should be determined; 7. The date and time of the blast and prevailing weather conditions. 8. The proximity of other persons, dwellings, roads, railway lines, commercial buildings or other places which could be affected. 9. Notification of An Garda Siochana. The blast specification should record information on all of these matters

Site Specific Risk Assessment What is a Risk Assessment? A risk assessment is a careful examination of what could cause harm to people as a result of a work activity. It allows you to take the necessary precautions to prevent harm occurring. How do I do a risk assessment? There are five steps to a risk assessment: 1. Look at the hazards. 2. Decide who might be harmed and how. 3. Evaluate the risks and decide whether the existing precautions are adequate or whether more should be done. 4. Record your findings. 5. Review your assessment. What do I need to consider if I am doing a risk assessment? If you are doing a risk assessment you need to consider the following: the work activity; the equipment to be used; the duration of the work; the location of the work activity i.e. presence of hazards such as adjoining properties, members of the public; the working environment, e.g. weather conditions, geology, lighting, other persons, falls from height, drilling rigs and mobile plant; condition and stability of existing work surfaces; physical capabilities of the workers. Charging the Shot When carrying out charging operations the following should be taken into account; Only sufficient explosives for the blasting operations should be available on site and under the direct control of the appointed shotfirer; Boxed explosives and detonators should not be opened and kept apart until required. These materials should not be left lying around; Holes should be checked at regular intervals during loading to check that; -Cartridges are not stuck at high level; -Correct amount of explosive is loaded into each hole e.g. bulk explosives is not lost into cavities or voids in the ground; That metal objects are not used to manipulate stuck cartridges in holes; That holes are stemmed with single size crushed aggregate; On completion of charging that the area is kept clear and circuits remain open until blasting occurs. Danger Zone The characteristics of the blast specification will determine the danger zone. The purpose of a danger zone is to protect persons in the event of a fly-rock incident and from entering a live blast area. When determining the danger zone the explosives supervisor has to take into account the following: 1. Other works which maybe ongoing adjacent or near the blasting area; 2. Other persons i.e. public roads, workplaces and habitable dwellings within the danger zone;

3. If members of the public are living within the danger zone the blast should be re-designed so as they are not affected; 4. Clearance & checking of danger zones; 5. Placement of adequate number of sentries around the danger zones and communication with same; 6. Adequate traffic management procedures are in place where traffic has to be stopped; 7. Final checking procedures and sounding of audible warning devices; 8. Protection for the shotfirer. Misfires When misfires occur they are defined into two categories Type A & Type B; Type A Misfire: Testing before firing a shot reveals broken continuity which cannot be rectified. Type B Misfire: Failure of any or part of a shot to explode when fired. If a Type A or B misfire occur there must be clear written procedures in place to deal with these eventualities. These are normally covered in the shotfiring rules which will contain procedures to deal with the appropriate type of misfire. Note: Where a misfire has occurred the contractor must follow the safety procedures as laid down in the shotfiring rules and also to include risk assessment and method statement. A suitable record of a misfire must be recorded. 8 Steps to Successful Blasting on Construction Sites All Clear is Given Make Appointments in Writing & Confirm Acceptance Prepare Shotfiring Rules Take Shot and Check for Misfire Safe to Blast Blasting Specification Prepared by Explosives Supervisor Danger Zone Cleared and Enforced Charge the Shot Site Specific Risk Assessment Carried Out First published in December 2008 and updated November 2014 by the Health and Safety Authority, The Metropolitan Building, James Joyce Street, Dublin 1 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior permission of the Health and Safety Authority. HSA0308