TECHNICAL BULLETIN CRYOGENIC APPLICATION SERVICES. website:

Similar documents
Baffles and Traps Cryotrap

Chlorine Supply Containers And Piping

Micro Channel Recuperator for a Reverse Brayton Cycle Cryocooler

Water in the Atmosphere

Chapter 4, Problem 30.

MEDICAL EQUIPMENT CATALOG

Design Change Notification

Optimizing Gas Supply for Industrial Lasers

Generating Calibration Gas Standards

Liquid Gas Cylinder (LGC)

Vacuum Insulated vertical cryogenic CO 2 & N 2 O Tanks

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Experimental Analysis on Vortex Tube Refrigerator Using Different Conical Valve Angles

BREATHERS VC Series. The best-selling traditional breather type, with mechanical valve.

Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases.

APPS-160 Gen 2 User Manual

Series Environmental Chambers

Advanced Management of Compressed Air Systems Pre-Workshop Assignment

Load Responsive Multilayer Insulation Performance Testing

N2 Blanketing Valve DST100 / DST200 TYPE INSTRUCTION MANUAL CONTENTS K.S.P.C. General Description Operation. Installation Maintenance

NGN Series nitrogen generator

ASSIGNMENT 2 CHE 3473

ASSIGNMENT 2 CHE 3473

Air Saving Valve reduction in 40% air consumption 40% air consumption Air consumption reduction ratio (%) Flow valve Flow valv

94270 Vapor Guard Tank Blanketing Valve Vapor Guard Tank Blanketing Valve What is Tank Blanketing? Features How does it work?

EXAM # 2. First Name Last Name CIRCLE YOUR LECTURE BELOW: INSTRUCTIONS

Self-operated Pressure Regulators for special applications

BekkTech s Procedures For Performing In Plane Membrane Conductivity Testing

The Shand & Jurs Model Vapor Guard Tank Blanketing Valve

Single Phase Pressure Drop and Flow Distribution in Brazed Plate Heat Exchangers

MS.RAJA ELGADY/PRESSURE PAPER 3

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

Cryogenic Materials Operating Procedure and Safety Requirements

Vortex Tube Short Course February 2017

Gianluca Gemme LN2 DISTRIBUTION PLANT

HOW TO MANAGE VAPORIZATION IN AN ANALYTICAL SYSTEM By Dean Slejko and Tony Waters

Technical Information

OPERATING INSTRUCTIONS

3/30/2013. Vapor Pressure and Changes of State Phase Diagrams. Chapter 10 Sections 8, 9

Process gas requirements (Core, VWI, and OptiMix gas connect consoles)

What I have learned about SF 6 gas testing.a Practical explanation

[USING THE VITROBOT April 9, Using the Vitrobot

Chapter 4: Moisture and Atmospheric Stability The hydrologic cycle

CHECK VALVES APPLICATIONS

6200E Installation Requirements

Thermocirc Installation and Maintenance Instructions

STANDARD OPERATING PROCEDURES

Laboratory Hardware. Custom Gas Chromatography Solutions WASSON - ECE INSTRUMENTATION. Custom solutions for your analytical needs.

Workhorse 8 Oxygen System Model No 5665, 5673, 5679

Sample C ylinde rs, Acce ssorie s, and O utage Tube s

ABRASIVE REGULATOR II

ABRASIVE REGULATOR II

- Cost for regular gas filling. - Additinal costs, i.e. tank rent, delivery. - Cost for regular liquid nitrogen filling

v. Size shall be specified on drawings.

I. Subject: Compressed gas cylinders, regulators, and portable liquid systems.

Technology issues regarding Blends of Refrigerants Buffalo Research Laboratory

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

TUTORIAL. NPSHA for those who hate that stuffy word. by Jacques Chaurette p. eng. copyright 2006

DANFLO Control Valves 400 Series Model 20

Evaluation of Hydropath Clearwell Technology On Carbonate Brine Scaling Using Tube Blocking Method

An Investigative and Synoptic Review on Helium Liquefaction Using a Commercial 4 K Gifford- McMahon Cryocooler

Series MX pressure regulators 3/

The water supply for a hydroelectric plant is a reservoir with a large surface area. An outlet pipe takes the water to a turbine.

An Experimental Performance Study of Vortex Tube Refrigeration System

Test Report # Rev 0. Adiabatic Compression With Constant Bleed Valve

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM

Air Saving Valve. Pressure Valve Flow Valve

PHYS 101 Previous Exam Problems

CLOSED LOOP SOLVENT EMISSIONS CONTROL. David C.H. Grant

Chapter 3 EXPERIMENTAL: EQUIPMENT, SET-UP, AND PROCEDURE

Cable in Conduit Conductor (CICC) quench modelling

SOLAR 93 THE 1993 AMERICAN SOLAR ENERGY SOCIETY ANNUAL CONFERENCE. Washington, DC April 22028,1993. Editors: S. M. Burley M. E.

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the. IGF Code

Experimental Verification of Integrated Pressure Suppression Systems in Fusion Reactors at In-Vessel Loss-of -Coolant Events

Air Amplifiers & SYSTEMS

490 Micro GC Site Preparation Checklist

Air Saving Valve. Series ASQ. Series ASR. Pressure Valve. Flow valve TMH ASD AS AS-FG AS-FP AS-FM ASP ASN AQ ASV AK VCHC ASS. r r AS-FE KE 10 0.

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

WP2 Fire test for toxicity of fire effluents

KATEDRA MATERIÁLOVÉHO INŽENÝRSTVÍ A CHEMIE. 123MEAN water vapor transport

ATMO 551b Spring Flow of moist air over a mountain

K32230 DEW-POINT APPARATUS

CRYOGENIC EXPERTS, INC. World Wide Web Toll Free FOR CEXI Phone (805) Facsimile (805)

University of Minnesota Nano Center Standard Operating Procedure

Tank Blanketing Pressure Regulators RHPS Series

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

Purge Star & Ring Purge Systems

Effect of Hot End Obstruction and Nozzle on the Performance of Vortex Tube

PETROLEUM & GAS PROCESSING TECHNOLOGY (PTT 365) SEPARATION OF PRODUCED FLUID

TECHNICAL SPECIFICATION. SPC-1 Stirling Process Cryogenerator

Customer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist

Helium-Liquefaction by Cryocooler for High-Field Magnet Cooling

Gas Sampling Fitting with MK2.1 and L-Probe

Installation, Operation, and Maintenance Manual Parker Balston Model N2-04 Nitrogen Generator

Pressure Independent Control Series

Outcomes: Operationally define vapour pressure

Pressure Control. where: p is the pressure F is the normal component of the force A is the area

TECHNICAL SPECIFICATION. SPC-4 Stirling Process Cryogenerator

mass of container full of air = g mass of container with extra air = g volume of air released = cm 3

Bubble Tube Installations

Transcription:

TECHNICAL BULLETIN SERVICES website: email: www.pipingtech.com info@pipingtech.com copyright 2009 Piping Technology & Products, Inc.

SERVICES Objective TECHNICAL BULLETIN To determine the amount of ice formation on an un-insulated pipe operating at cryogenic temperatures employing a small scale model. Test Facility TEST RESULTS OF THE FORMATION OF ICE ON AN UNINSULATED PIPE CARRYING LIQUID NITOGEN A perspective view of the facility is shown in Figure 1. The test facility consists of a 36 long stainless steel pipe of 4 1/2 OD with 4 ID. The pipe ends are closed by 3/4 x 5 1/2 x 21 plates. The pipe is suspended from top using two pipe clamps. Figure 1. Perspective View of the test facility

To simulate cryogenic condition for an extended period of time, liquid nitrogen from a tank is supplied through a control valve into the pipe at one end and the nitrogen vapor is allowed to escape through a 1/2 tube from the other end. The test facility is set in our workshop area where large size doors allow cross ventilation maintaining atmospheric conditions. A type K thermocouple is set between the pipe and the clamp near the liquid nitrogen inlet to measure the pipe s outer surface temperature history. Simultaneously, the ambient room temperature, relative humidity, and dew points were measured. Test Procedure Liquid nitrogen was allowed to fill completely the stainless steel pipe first, followed by a steady flow of liquid Nitrogen. By adjusting the control valve to a point when the liquid Nitrogen ceases to exit through the vertical outlet tube, the pipe remained completely full of liquid Nitrogen throughout the test. This flow process caused a small fraction of the flowing liquid nitrogen in the pipe to change phase to vapor by gaining latent heat of evaporation from the ambient air and exited through the outlet tube. This maintained almost a constant pipe surface temperature over an extended period of time. Metering scales were fixed radially outward at three locations (near the two ends and at the middle) along the pipe to measure the ice deposition depth as a function of time. Results Test results are given in Table 1. After the liquid nitrogen flowed into the pipe, the atmospheric moisture started forming ice on the outer surface of the pipe, end plates and clamps. During this test, the ice thickness varied between day and night. This is due to the daytime temperature being higher than the nighttime temperature. PT&P Piping Technology & Products, Inc. email: info@pipingtech.com website: www.pipingtech.com Copyright 2009 Piping Technology & Products, Inc.

SERVICES TECHNICAL BULLETIN Material Items Thickness of Formed Ice with Time Pipe Ambient Relative Radial Ice Thickness No. Date Time Temp Temp Humidity LHS MID RHS 1 09/14/06 12:00 pm 84 o F 83 o F 80% 0 0 0 2 09/14/06 2:00 pm -30 o F 83 o F 80% 0 0 0 3 09/14/06 6:00 pm -196 o F 91 o F 75% 0.5 0.5 0.5 4 09/15/06 6:00 am -299 o F 80 o F 62% 1.5 1.5 1.5 5 09/15/06 10:00 am -299 o F 80 o F 80% 1.5 1.5 1.5 6 09/15/06 2:00 pm -289 o F 90 o F 50% 1.25 1.25 1 7 09/15/06 6:00 pm -295 o F 93 o F 70% 1.5 1.5 1.25 8 09/16/06 6:00 am -296 o F 84 o F 80% 2 2 1.75 9 09/16/06 10:00 am -295 o F 88 o F 80% 1.5 1.5 1.5 10 09/16/06 2:00 pm -294 o F 91 o F 80% 1.25 1.5 1.5

The variations of ambient and pipes surface temperature with time are shown in Figure 2. In each plot, the day and night durations are shown by arrows. After filling up the pipe with liquid Nitrogen, the pipe s surface temperature started falling exponentially with time and it took almost 20 hours to reach an almost steady state with small variations following a trend similar to that of the ambient temperature variations during day and night. 100 6 pm 6 am 6 pm 6 am PIPE SRFACE TEMPERATURE ( o F) 0-100 -200 Ambient Temperature Cylinder Surface Temperature -300 0 10 20 30 40 50 TIME (hour) Figure 2, Variations of Ambient and Pipe s Outer Surface Temperature with Time PT&P Piping Technology & Products, Inc. email: info@pipingtech.com website: www.pipingtech.com Copyright 2009 Piping Technology & Products, Inc.

SERVICES TECHNICAL BULLETIN

The variations of ice thicknesses with time at three axial locations of the pipe are shown in Figure 3. As it is to be expected, the rate of ice formation is higher at night (when the ambient temperature was 8 ~ 10 degrees lower than in the day time) than that during the day. From morning to early afternoon, as the ambient temperature increased, some ice melted, resulting in a decrease of the ice thickness. In the first night, the maximum thickness was about 1.5 ; the average thickness decreased to about 1.25 during daytime while in the following night the average thickness increased to about 1.75 and decreased to 1.35 during the day time, when the test was stopped. 2.5 6 pm 6 am 6 pm 6 am 2.0 ICE THICKNESS (inch) 1.5 1.0 0.5 Left Side Middle Right Side 0 0 10 20 30 40 50 TIME (hour) Figure 3, Variations of Ice Thickness at Three Locations with Time PT&P Piping Technology & Products, Inc. email: info@pipingtech.com website: www.pipingtech.com Copyright 2009 Piping Technology & Products, Inc.

SERVICES TECHNICAL BULLETIN (a) Test Facility without Ice Formation (b) Test Facility with Ice Formation