Contractor / Exhibitor Handbook

Similar documents
Contractor handbook. Purpose

B S Glass Ltd Safety procedures- outsourced Workplaces

Code of Practice and Instructions to Contractors Working for Viridor

WHS CONTRACTOR INFORMATION PACKAGE

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Health & Safety Contractor rules

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

(Health, Safety, and Welfare)

Compliance with Health & Safety legislation

Health, Safety and Welfare Policy

Health and Safety Policy

Company Policy Health & safety for work performed at Customer premises

Contractor Code of Conduct

Permit-To-Work Guidance and Templates

SEMBIT SQA Unit Code F9JC 04 Complying with statutory regulations and organisational safety requirements

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

Working safely in an engineering environment

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

SEMMPF201 Complying with Statutory Regulations and Organisational Safety Requirements

Method Statement Author

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

Work at height Policy

S31 Opening Statement Working at Height

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

2.0 Management Systems and Documentation

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

Understanding health and safety in gas utilisation

SOP. Working in Confined Spaces

HEALTH & SAFETY GUIDANCE

Working in Confined & Enclosed Space Policy

A Checklist for a Health and Safety Risk Assessment

LONE WORKING HEALTH AND SAFETY GUIDANCE

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

Safe work method statements

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Harbour Town Gold Coast Site Induction

CONFINED SPACE PROGRAM

ASPEC Engineering HSE Management System. Work Instruction. 1 Objective. 2 Working in confined spaces. 2.1 What is a confined space?

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

SAFETY, HEALTH AND ENVIRONMENTAL POLICY AND MANAGEMENT SYSTEM

Fire Safety Hot Work Permit Policy/ Procedures

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

Waste Industry Safety & Health

Understanding Statutory Regulations and Organisational Safety Requirements within a Medical Engineering Environment

QCF Unit and Assessment Specification

Health, Safety & Environmental Policy. Rotec Hydraulics Ltd

STORM WATER RETENTION TANKS MAINTENANCE INFORMATION FOR HEALTH AND SAFETY FILE

Contractors' Code of Safe Practice

CONTRACTOR SAFETY INDUCTION HANDBOOK

TOOL BOX TALK NO3. Use of P.P.E

To comply with the OHS Act, the responsible manager must carry out and document the following:

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

KIERNAN ELECTRICAL SITE INDUCTION. Site Supervisors: Chris Lettice

MAGB HEALTH and SAFETY GROUP Working In Confined Spaces

Health and Safety Policy

Health and Safety Policy Statement ENVILLE GOLF CLUB LIMITED

Workplace Safety Inspection Sheet

COMPANY HEALTH & SAFETY POLICY

Company Health & Safety Policy

Health and Safety Policy

Working at Height Regulation 2005

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

CONTRACTOR SAFETY RULES

SCOUTS AUSTRALIA NSW

Incorporating: Alan s Skip Hire Ltd Alan s Skip Hire (Wales) Ltd Ash Metal Recycling Ltd ASH Trade Waste Services Ltd Health & Safety Policy

Safety File. Contract Avonbourne School Prepared By Steve Steel Date 20 th July 2008

Hampstead Hill School Health and Safety Policy: Confined Spaces

POLICY FOR COSHH (CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH) POLICY

Lifting Operation & Lifting Equipment Procedure

Dryside Ltd Unit 270, 14 London Road Guildford Surrey GU1 2AG

Health and Safety Policy

CONTRACTOR HANDBOOK INDUCTION SAFETY MANUAL

Contractor/Visitor Safety Orientation UNBC

HEALTH & SAFETY HANDBOOK. Venues/HSE/08/16

Procedure: Permit Activities-Work in Confined Spaces and Hot Works

Boat Hoist Operations Code of Practice and Guidance COP2

Procedure: Confined space safety

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy 1

Health &Safety Policy HS803

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Boat Lifting Operations Code of Practice and Guidance COP3

LADDERS FIXED AND PORTABLE

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

Contractor s HSE BOOK

Risk assessment part 1 of 3

Arrangements for H&S

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Page1. Arrangements for H&S. Issue Date 07/03/2017 Issue 1 Document No: 007 Uncontrolled when copied

Contractor OHS Induction. AOHS-05-GUI September 2016

CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd. METHOD STATEMENT Commissioning and Final connections to IHT Skid

Quest Operations 4 Health and Safety Declaration Guidance Notes Issue 10 - October 2016

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

COMPANY HEALTH & SAFETY POLICY

Health & Safety Policy. Plymouth College & Preparatory School

S.K.J Construction Ltd Groundwork & Civil Engineering

BELFRY PROPERTY SERVICES LIMITED

Safe Work Method Statement

Transcription:

Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors on site are responsible for ensuring their employees, sub-contractors and others under their control have been briefed on, and follow these rules. Breaches of rules are liable to constitute a breach of contract and persons being asked to leave the site. All contractors are required to sign to indicate that they have read and understood the requirements outlined in this handbook using the attached receipt and acknowledgement form. ALL CONTRACTORS AND EXHIBITORS MUST RETURN A COPY OF THEIR PUBLIC LIABILITY INSURANCE WITH THE RECEIPT FORM On arrival on site please contact Michael Limming 07989 079082 for a venue specific site briefing Page 1

CONTENTS 1. Introduction 2. Consultation prior to commencement of contract work 3. Permits to work 4. Authorisations 5. Working area 6. Tidiness 7. Tools and equipment Live Promotions Events 8. Tools and equipment Contractors 9. Protective clothing and equipment 10. Fire prevention 11. Hot work 12. Smoking 13. Vessels and tanks 14. Procedure for work at height 15. Internal vehicles 16. Control of substance hazardous to health 17. Environmental protection 18. Fist aid 19. Accident reporting procedures 20. Speed limits 21. Security 22. Contractors acknowledgement (to be returned) Page 2

1. INTRODUCTION It is the intention of, Live Promotions Events Ltd the client organisation, to secure highest standards of health and safety on the premises and be compliant with CDM regulations. This booklet forms part of Live Promotions Events Safety Policy and contains the minimum requirements that all contractors must meet. All contractor staff must read and ensure they understand the project health and safety requirements contained in the book. On no account must any thing be assumed, all health and safety issues must be directed in the first instance to Live Promotions Events health and safety Co-ordinator, Michael Limming Contractors key task while working on Live Promotions premises are:- Identify the hazards of their work, assess the risk arising from these hazards and tell Live Promotions Events how these risks are to be controlled; Inform Live Promotions Events of any death, injury, ill health or dangerous occurrence; Provide Live Promotions Events with information to be included in the health and safety file; Co-operate with Live Promotions Events and other contractors Follow any directions of Live Promotions to enable them to comply with their duties under The Health and Safety at Work etc Act 1974, in particularly risks from other contractor work. This handbook assumes that you have made sure of the following:- You employ only competent, sensible staff who will arrive properly dressed with relevant PPE; You have adequate and valid Employers, Public (and where appropriate product) Liability Insurance Certificates; That you can supply copies of required certificates and licences on request. The attached receipt and acknowledgement form must be signed and completed prior to starting work on Live Promotions Events premises. Page 3

2. CONSULTATION PRIOR TO WORK Before starting any work, a responsible person representing you must report to Live Promotions Events, Site Safety Coordinator [Michael Limming], or in his absence his nominated representative. The Site Safety Coordinator will liase with while you are working on the site and inform you of any specific hazards i.e. dangerous areas and any other work activities which may affect the work you are carrying out. It should be noted contractors still have responsibility for the health and safety of their own staff and others that may be affected by their work under existing health and safety legislation. Proper consultation prior to work will be a vital component to ensuring safe systems of work on the site. 3. PERMITS TO WORK A written permit to work system will always be required for the following activities: All marquee erections Hot works Confined space working Work at height above 2 meters Additional permits may be introduced at the discretion of Live Promotions Events or were contractor individual risk assessments identify a requirement for a permit as part of a control measure. 4. AUTHORISATIONS To complement and formalise the permit to work systems there is also a requirement to have written authorisation prior to commencement of the following activities: Demolition Plant and equipment worthiness Operators competence to perform their designated tasks Prior to commencement of any of the above activities or any other deemed necessary by Live Promotions Events. The Contractor shall seek authorisation both verbally and in writing from Live Promotions Events Site Safety Coordinator. Authorisation will be formally recorded. Authorisation will only be given when the necessary risk assessment has been completed, a safe system of work developed. Page 4

5. WORKING AREA Wherever possible contract work, shall be kept separate, from Live Promotions Events working areas, offices etc. Contractor staff are forbidden to go beyond their designated area, without prior permission of Live Promotions Events Site Safety Coordinator. In such an event you will use only recognised access and egress routes, and will ensure that all your contract staff observe this restriction. 6. TIDINESS A high standard of housekeeping is required. It is not acceptable to leave materials, trailing cables or other or other tripping hazards in access routes. You must remove all tools and materials when you complete your work. You must leave the site in a safe and tidy condition. 7. TOOLS AND EQUIPMENT Live Promotions Events It is your responsibility to ensure that all your employees have adequate equipment to complete the contract. Additional tools and equipment that may be required from Live Promotions Events must be kept to a minimum and must be authorised in writing by Live Promotions Events Site Safety Coordinator. In addition Contractors will need to produce any relevant certification required in order to demonstrate competence to use the equipment required. 8. TOOLS AND EQUIPMENT CONTRACTORS Lists of all lifting tackle, ladders, scaffolding, staging, planks, electrical tools and appliances should be kept available together with evidence of recent satisfactory inspection. 9. PROTECTIVE CLOTHING AND EQUIPMENT The Contractor will supply and ensure the use of personal protective equipment (PPE) and work equipment to meet the requirements of health and safety legislation and the risk assessments undertaken prior to the work. Personal Protective Equipment is not mandatory on Live Promotions Events premises, however the following equipment may be required as identified by the risk assessment: Safety helmets; Safety Boots with steel toe cap, ankle protection and a toughened steel midsole; Eye protection as appropriate and hearing protection within designated zones; Overalls. This list is not exhaustive and further PPE may be required as identified by the work specific risk assessment and method statements carried out by the contractor during the planning stages of the work. Page 5

10. FIRE PREVENTION All Contractors must be aware of the system of fire warning for the area of the site where they are working. All persons must evacuate on instruction or upon hearing the alarm, and know the fire exits or assembly point. Contractors are required to sign on and off the premises when ever entering or leaving the site, even for short periods, and keep an up to date list of all their staff and any sub contractors they may have, so that a roll call can be taken. Fire fighting equipment is available for trained personnel only, and you may be required to provide your own fire fighting equipment and trained personal if carrying out hot works, i.e. welding and as identified in your risk assessment. All fires must be reported immediately to Live Promotions Events and the alarm raised. 11. HOT WORK All hot work on this site is strictly controlled, on no account must any hot work be carried out with prior authorisation from Live Promotions Events site Safety Coordinator. All hot work is subject to a hot works permit. Hot work may be defined as: Burning, welding or other hot work causing sparks, e.g. grinding and cutting; Any work involving the use of flame; Any other application of heat on or near a vessel or plant which contains (or which has contained) explosives or flammable substances. 12. SMOKING Smoking is not permitted within any part of the building, smoking is only allowed outside the building. Any no Smoking signs must be strictly observed 13. VESSELS AND TANKS CONFINED SPACES A written permit and authorisation must be obtained before any entry into a confined space. Typical confined spaces may include: Shafts, tunnels, manholes, sewers, ceiling voids, cellars and basements, boilers and vessels Confined spaces are not necessarily small or completely enclosed, even in an emergency; do not enter a confined space, unless you are fully equipped to do so. If in doubt, assume the workplace is a confined space, and contact Live Promotions Events site Safety Coordinator. Page 6

14. PROCEDURE FOR WORKING AT HEIGHT All work at height must be risk assessed and a suitable safe system of work developed. In order to prevent falls the following precautions should be considered as part of the risk assessment and method statement: Decide prior to starting what equipment will be suitable for the job and the conditions on site, Choose a safe method of getting to and from the work area; Ensure that platforms have guard rails and toe boards; Check all the access equipment is in good condition and ensure that whoever puts equipment together is trained and competent; Supervise those that are allowed to use the equipment and make sure it is used properly; If equipment is provided by another company, check before using it; Only use ladders as workplaces for short periods, and then only of it is safe to do so. It is generally safer to use a tower scaffold or mobile elevating work platform; Treat the use of harnesses and lines to prevent falls as a last resort they only provided protection for the person using the harness in the event of a fall, they do not prevent the fall, itself. If in any doubt seek advice from Live Promotions Events site Safety Coordinator. Mobile elevating platforms (MEWP) frequently used to access height around the site, and provide excellent safe access to high-level work. However the following precautions need to be observed and considered when carrying out risk assessments and developing safe systems of working at height: All person operating the MEWP s should be trained and competent; The work platform is provided with guard rails and toe boards; It is used on suitably firm and level ground, the ground may have to be prepared in advance; Tyres are properly inflated and are in good condition; Any outriggers are extended and are chocked as necessary before raising the platform; All persons should be aware of what to do if the machine fails with the platform in the raised position. Always check the limitations of the machine in the manufacturer handbook before taking them onto unprepared or sloping ground. Wearing a harness with a lanyard attached to the platform provides extra protection against falls, especially while the platform is being raised or lowered. 15. INTERNAL VEHICLES / ONSITE All contractors vehicles on site must carry the correct level of insurance and at all times adhere to site speed limits or those imposed by the organisers. Vehicles may only be parked in designated areas. Page 7

16. COSHH CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH Prior to commencement of work the contractor will inform Live Promotions Events of any activities which might use or create a substance which is hazardous to health. It must be demonstrated by assessment the exposure levels expected and control measures to be taken. The Contractor should have available a full list of substances to be brought onto site for inspection by Live Promotions Events. Contractor are expected to have safety data sheets for all hazardous substances used. All chemical spillage s must be contained and disposed of in accordance with the COSHH assessment and Material Safety Data Sheet. All chemicals and containers must be stored in secure areas, tops must be replaced after use. All partially used containers must be removed from site or suitably stored after use. 17. ENVIRONMENTAL PROTECTION The contractor will ensure that all work (including the use of equipment, materials and substances) is carried out in a manner to ensure compliance with all relevant regulations concerning the control of environmental effects of the work carried out. The contractor must minimise the creation of dust, fumes or any other impurity, which could be offensive or injurious or cause damage to equipment. Work involving asbestos must not be carried out without authorisation from Live Promotions Events site Safety Coordinator. Permission will only be given if the contractor can ensure total compliance with the Asbestos at Work Regulations and associated approved codes of practice and guidance. Asbestos removal must be entrusted to a specialist sub-contractor licenced by the Health and Safety Executive (HSE). Any incidents that cause or might possibly cause any form of environmental contamination shall be immediately informed to Live Promotions Events, site Safety Coordinator. The contractor shall immediately take steps to minimise the extent of the environmental contamination and shall co-operate fully with the site management and provide all relevant information to the company during subsequent investigation into any incident. 18. FIRST AID First aid facilities are available to Live Promotions Events staff, however the contractor must have their own first Aider and kit for use in the working area. 19. ACCIDENT REPORTING All accidents, near misses and dangerous occurrences shall be reported in accordance with the requirements of the RIDDOR Regulations 1995. (Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 1995). All accidents on site must in addition to the above, be reported to Live Promotions Events site Safety Coordinator. Live Promotions Events will, where necessary, investigate promptly any accident, near miss or dangerous occurrence that is reported. Page 8

20. SPEED LIMITS The speed limits of vehicles around the perimeter of Live Promotions Events buildings must be consistent with safety and must not exceed that shown on the notices displayed within the site. 21. SITE SECURITY Contractors will be subject to the same security arrangements that exist for all persons on Live Promotions Events premises Page 9

22. RECEIPT AND ACKNOWLEDGEMENT FORM (DETACHABLE) This form is to be completed by each Contractor and be detached and passed to the Live Promotions Events Safety Coordinator prior to starting work. Name and Address of Company:.... Brief Description of Work:.. As an exhibitor or trader I understand that I am responsible for health and safety within my stand space and have a meaningful risk assessment and public liability insurance covering attendance at the event Contract/Order Number: We acknowledge receipt of the Health and Safety Induction Handbook and note the Live Promotions Events Health and Safety Policy Statement, the general safety matters and the specific Health, Safety and Welfare and Technical Matters. We agree to abide by the contents of the document and for it to form part of the contract with Live Promotions Events. Signed: Name: (BLOCK CAPITALS) Title: On behalf of (Company) Date: Page 10