NYCBS March 2014 Monthly Report

Similar documents
NYCBS April 2014 Monthly Report

NYCBS December 2014 Monthly Report

NYCBS November 2014 Monthly Report

NYCBS August 2014 Monthly Report

NYCBS January 2014 Monthly Report

NYCBS September 2013 Monthly Report

NYCBS July 2013 Monthly Report

NYCBS October 2013 Monthly Report

NYCBS January 2015 Monthly Report

NYCBS August 2015 Monthly Report

NYCBS September 2015 Monthly Report

NYCBS October 2015 Monthly Report

NYCBS December 2015 Monthly Report

March 2016 Monthly Report

Table of Contents. January 2016 Monthly Report

October 2016 Monthly Report

January 2017 Monthly Report

May 2017 Monthly Report

April 2018 Monthly Report

September 2017 Monthly Report

January 2019 Monthly Report

November 2018 Monthly Report

Canarsie Tunnel Repairs: Planning Ahead for the Crisis

BICYCLE SHARING PROGRAM DEVELOPMENT. CUTR Webcast Series June 27, 2013

Rochester Area Bike Sharing Program Study

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

SCAG EMERGING REGIONAL ISSUES: GOMONROVIA OVERVIEW. City of Monrovia

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

REQUEST FOR PROPOSALS TULSA BIKE SHARE SYSTEM APPENDICES

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

GOLD COAST TRANSIT DISTRICT SHORT RANGE TRANSIT PLAN FY 2015 FY 2019 APPENDICES

Overcoming the Challenges of Winter Bike Share. Phil Goff, Sr. Associate and Director of Bike Share Services 2/3/15

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

Sacramento Metropolitan Air Quality Management District. Technical Working Paper #7: On-Going Evaluation Methods

B. THAT Council direct staff to prepare by-law amendments to allow for Public Bike Share City-wide.

TAC February 1, 2012 Prepared by Metro Bike Program

CBTL Job Postings. The Track Manager will be responsible for evening and weekend work on a flexible and changing schedule.

Is St. Louis Ready for a Bike Share System? May 14, 2014 Public Open House

ORANGE COUNTY TRANSPORTATION AUTHORITY. Metrolink Ridership and Revenue Quarterly Report. Staff Report

AGENDA. Stakeholder Workshop

Expansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.

WE WANT YOU TO SPONSOR

Appendix T 1: Additional Supporting Data

Public Bike Share Schemes. 14 December 2017

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

A. Information on Bicycle Share Business

Welcome. Wilmington Transit Moving Forward Workshop Presentation. October 16, 2013

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Semi-Annual DC Circulator Forum. February 25, 2014

Bike Share in the U.S.: 2017

TORONTO TRANSIT COMMISSION REPORT NO.

1999 On-Board Sacramento Regional Transit District Survey

Santander Cycle Hire. Presentation by: David Eddington Cycle Hire Operations Manager Transport for London

-TABLE OF CONTENTS. 8. Station Performance. 16 One Year Anniversary. 13 Promotions. 15 Press and Accolades. 3 Executive Summary.

Evaluation. Monitoring and 8.0

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

STAFF REPORT SAUSALITO CITY COUNCIL

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

Transportation 101. Getting To, From & Around Campus

January Project No

Public Bicycle Sharing Scheme

Swift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit

2013 Annual Passenger Counts

Bike Share Expansion P LANS A ND P ROGRAMS C OMMITTEE J UNE 1 6,

2016 Annual Passenger Counts

Dartmouth College Parking & Commuting June 10, 2009

February 4, Community Meeting August 2, :30 6:10 Presentation

JULY 21, RIDE GUIDE

Holland Tunnel Exit in NJ

To: The results of these surveys have been analysed and are summarised within this Technical Note.

MORE CONNECTIONS. Redesigning routes for the future of transit in Milwaukee County.

Implementation Matrix

M14A/D Select Bus Service

EAST VILLAGE SHOPPERS STUDY A SNAPSHOT OF TRAVEL AND SPENDING PATTERNS OF RESIDENTS AND VISITORS IN THE EAST VILLAGE

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

Los Angeles County Metropolitan Transportation Authority Metro Bicycle Roundtable

North Coast Corridor:

Lawrence Bike Share Feasibility Study

Dynamic Cluster-Based Over-Demand Prediction in Bike Sharing Systems

2018 Annual Passenger Counts. Board of Directors September 6, 2018 Agenda Item #11

NACTO Designing Cities Conference Project Evaluation: Tools for Measuring Success and Building Support. October 29, 2015

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

ALTERNATIVE MODES. Annual Report for Academic Year

The potential impact of high density docking stations on Bike Share distribution activities Biella Research June 2016

TRANSPORTATION IMPROVEMENT STRATEGY

CITY OF OAKLAND RENTAL SURVEY

Paoli Road Improvement Feasibility Study

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009

395 Express Lanes Extension

95 Express Annual Operations Report: Fiscal Year

Item B1 November 19, 2009

Ridership in Virginia by System FY2017

COLUMBUS AVENUE NEIGHBORHOOD TRANSPORTATION STUDY

SKATE ONTARIO. Skate Ontario Sectionals Series Bid Package

Transcription:

NYCBS March 2014 Monthly Report

March 2014 Monthly Report Table of Contents 1. Executive Summary... 3 2. Membership... 3 3. Ridership... 4 4. Environmental Impact... 5 5. Rebalancing Operations... 6 6. Station Maintenance Operations... 6 7. Bicycle Maintenance Operations... 6 8. Incident Reporting... 7 9. Customer Service Reporting... 7 10. Customer Outreach... 7 11. Financial Summary... 8 12. Service Levels... 8 Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 2

1. Executive Summary March 2014 Monthly Report March was Citi Bike s tenth full month of operation. There were 327 (5 were temporarily removed or awaiting relocation during the month) active stations at the end of the month. Our target fleet size for the month was 5,400 (90% of fleet size) bicycles on the street, and our average fleet size was 5,028 due to a backlog of maintenance from winter conditions. Fleet size at the end of the month was 5,158. 2,736 annual members and 10,387 casual members signed up during the month. Total annual membership at the end of the month was 100,600. Overall ridership was 451,432 trips and 703,956 miles traveled, with annual members taking 428,064 trips and casual members accounting for 23,368 trips. There was an average of 14,562 rides per day in March with an average distance of 1.56 miles per trip. On average, each bicycle in the system had approximately 3 rides per day. There were no snow or weather events that impacted the system. NYCBS rebalanced 34,277 bicycles in March, averaging 1,106 bicycles moved per day. In March, there were 3,545 reported bicycle maintenance issues that were addressed through in-shop maintenance, an increase over February. There were 125 reported cases of vandalism (including graffiti) to the stations and bicycles. There were 3,824 instances of full stations and 17,496 instances of empty stations during operational hours. Of the empty and full instances, 85% lasted less than 60 minutes. In March, there were 15,336 calls to the call center and 1,274 emails. We had approximately 3.4 calls to the call center per 100 rides. The gross revenue, including sponsorship, for March 2014 was $422,608. 2. Membership Citi Bike had 2,736 annual members sign up during March 2014, for a total of 100,600 annual members. There were 9,652 one day memberships in March and 735 seven day memberships. Casual membership increased significantly from February as spring weather began to arrive. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 3

March 2014 Monthly Report 3. Ridership There were 451,432 trips in March 2014, which was a significant increase from February. Annual members accounted for the vast majority of the trips, recording 428,064 trips vs. 23,368 trips for casual members. Citi Bike riders traveled a total of 703,956 miles with an average miles traveled per trip of 1.56. Ridership was generally higher on weekdays, but casual ridership was highest on weekends. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 4

March 2014 Monthly Report The most popular origins and destinations continue to be stations near large transit hubs, including the stations near Penn Station and the Port Authority, Pershing Square, and the area around Union Square. As has been the pattern, the least frequented destination stations are in Brooklyn, particularly the stations in and around the Brooklyn Navy Yard. Top 10 Stations for Ridership for the Month Station Trips To Station Trips From Station Lafayette St & E 8 St 5,105 5,225 8 Ave & W 31 St 4,605 4,856 E 17 St & Broadway 4,539 4,199 Pershing Square N 4,517 5,197 W 21 St & 6 Ave 4,416 4,412 Broadway & E 14 St 3,886 3,741 W 41 St & 8 Ave 3,848 3,466 Broadway & E 22 St 3,649 3,517 W 33 St & 7 Ave 3,506 2,936 E 43 St & Vanderbilt Ave 3,493 3,378 4. Environmental Impact Citi Bike riders traveled 703,956 miles in the month of March. Citi Bike riders burned a total of 30,270,111 calories for the month. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 5

March 2014 Monthly Report Using our calculation, we find that Citi Bike offset 366,057.15 pounds of carbon in March. 5. Rebalancing Operations NYCBS staff rebalanced a total of 34,277 bicycles during the month of March. The number of bicycles rebalanced will continue to increase as NYCBS staffs up for the peak season. In addition to our truck rebalancing, re-balancers using bicycle trailers move bicycles along the Broadway corridor and near Penn Station and the Port Authority. There were 21,320 total empty and full instances, but 85% lasted less than one hour. Peak availability was 97% (SLA target level is 98%), without including whether the next closest station was full of empty. Non-peak availability was 98% (SLA target level is 96%). 6. Station Maintenance Operations There were 327 active Citi Bike stations at the end of March. Technicians made a total of 883 station visits to address dock and station field maintenance orders. There were 630 reported station malfunctions and 359 reported dock malfunctions. Both of these figures are substantially higher than winter numbers, and they are expected to trend upwards even further as the system gets more use in the spring and summer. Reboots, battery swaps, and small docking point repairs were the most common FMO types. Some station FMOs remained open for long periods of time due to limited availability of replacement credit card readers. Because PBSC commissions credit card readers for use on their platform, disruption of PBSC support to NYCBS resulted in an inability to put replacements in the field. PBSC has recently resumed supporting NYCBS and has sent back a batch of functioning credit card readers that had been returned to the manufacturer for repair. During March, NYCBS continued the process of inspecting every docking point in the system and repairing broken docks as they are discovered. 7. Bicycle Maintenance Operations The bike shops at the Farley Building and Sunset Park completed 3,545 total repairs and inspections on 2,738 bicycles in March. The plurality of repairs seen by the bike shop in March were related to Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 6

March 2014 Monthly Report normal wear and tear from usage. In addition to regular inspection, mechanics continued to perform winter maintenance on bicycles, which includes cleaning and removal of salt 8. Incident Reporting In March, there were 125 reported instances of vandalism to bikes and stations, including stickers, graffiti, and damage to stations or bicycles, which were addressed either by NYCBS field staff or a third party cleaning vendor. This is an uptick of approximately 40% from the winter levels, and based on our experience last year, we expect vandalism to continue to trend upwards. 9. Customer Service Reporting In March, the NYCBS call center processed 15,336 calls with an abandonment rate of 3%. Call volume for March was approximately 3.4 calls per 100 rides, which is a decrease from February when issues related to snow removal drove call volume up relative to rides. However, this figure is roughly in line with trends from last year s peak season. The average time to handle a call was 3 minute and 39 seconds with an average hold time of 1 minute and 36 seconds. NYCBS also received 1,274 emails. 10. Customer Outreach As the weather warms more visitors are coming back to our website. CitiBikeNYC.com had 361,855 page views in March. The site received 110,608 visits of which 71,351 were unique visitors, nearly double the traffic we saw in February. Our social media following continues to grow, with 18,904 Twitter followers and 13,309 Facebook "likes." NYCBS hosted or participated in the following public events in March: Citi Bike Street Skills class @ Bicycle Habitat, 244 Lafayette St., Soho Sunday, March 2, 2014 9:30am Spring Fitness Break at the Westin New York Grand Central Hotel Stop in to the Westin for yoga and guided meditation, fitness seminars, super snacks and smoothies, raffles, and more. Be sure to swing by the Citi Bike table to say hello! Jumpstart your spring fitness! Thursday, March 20, 2014 7pm - 9pm The Westin New York Grand Central Hotel 212 E 42nd St. Citi Bike Street Skills class @ Bicycle Habitat, 250 Lafayette St., Soho Sunday, March 23, 2014 9:30am Citi Bike Street Skills class, held in partnership with NYU Wagner Transportation Association @ NYU Puck Building, 295 Lafayette St., 2nd fl., Soho Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 7

Sunday, March 29, 2014 11am Open to the public, registration required March 2014 Monthly Report 11. Financial Summary 1 Revenue Type March 2014 Inception to End of March 2014 Memberships (Gross) Annual 259,920 9,297,080 Daily 94,256 3,280,863 Weekly 18,100 779,250 Total - Memberships (Gross) 372,276 13,357,193 Overage Fees (Gross) Annual 67,064 749,892 Casual 52,076 1,698,967 Total - Overage (Gross) 119,140 2,448,859 Total - Other Revenue 7,985 71,729 Discounts, Adjustments, and Refunds (76,793) (1,271,446) - Subtotal - Membership and Usage 422,608 14,606,335 Sponsorship Fees - 13,512,275 Total Revenue 422,608 28,118,610 12. Service Levels Ref Name 1 2 Station Inspection and Litter Removal Station and Bicycle Cleaning Service Level Agreement Every station is inspected two times per week. All litter is removed two times per week. All defects are entered into the NYCBS database to be cleaned within 24 hours (station) or 96 hours (bicycle) In addition to Reference 1, every station, as well as bicycles present, is cleaned and wiped down once every 14 days Performance Level Actual Performance 94% of stations were inspected and had litter removed twice a week. 98% of stations were cleaned every 14 days for the month. 1 These are preliminary revenue figures and not audited Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 8

Ref Name 3 4 5 6 7 8 Bicycle Maintenance Station Cleaning After Discovery or Notification Bicycle Cleaning After Discovery or Notification Emergency Station Repair or Removal Station Deactivation or Removal Station Reactivation or Replacement Service Level Agreement In addition to Reference 1, every bicycle receives a full mechanical check at least once every calendar month. Maintenance for any individual bicycle must be conducted at least 10 days apart Stations must be cleaned within 48 hours of discovery or notification (by DOT, 311, NYCBS call center, etc.). Cleaning includes but is not limited to full wipe down and graffiti, scratchiti, and sticker removal Operator must clean bicycles or remove them from the system within 96 hours of discovery or notification (by DOT, 311, NYCBS call center, etc.). Cleaning includes but is not limited to full wipe down and graffiti, scratchiti, and sticker removal In the event of an emergency, a station must be repaired or removed as soon as possible, but no later than 12 hours after notification by DOT To accommodate public works and other events, a station must be removed the later of (i) 48 hours after notification by DOT and (ii) 24 hours before the event start. To accommodate public works and other events, a station must be deactivated the later of (i) 12 hours after notification by DOT and (ii) 12 hours before the event start. Every station must be replaced within 24 hours or reactivated within 12 hours after the end of the event or emergency, as determined by DOT Performance Level March 2014 Monthly Report Actual Performance 2,738 of 5,025 (55%) of bicycles were given a full mechanical check in the depot. NYCBS cleaned 85% of stations within 48 hours after notification. NYCBS cleaned or removed from service 33% of bicycles within 96 hours after notification. NYCBS ability to clean bicycles in the required timeframe is limited by the lack of remote bicycle lockdown functionality. There were no emergency station repairs or removals in March. of stations were deactivated or removed within the required timeframe of stations were reactivated or replaced within the required timeframe Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 9

Ref Name 9 10 Snow Removal (Shut Down) Snow Removal (No Shut Down) 11 Station Uptime 12 13 Website Availability Central Computer System Outage 14 Bicycle Fleet 15 Operational Docks Service Level Agreement If the program is shut down due to snow event: Equipment must be operational and reasonably free of snow within 5 hours of the program's reopening If the program did not shut down due to snow event: Equipment must be operational and reasonably free of snow within 12 hours of end of snow event Stations must be fully functional including all communications and transaction systems, excluding major upgrades to the Central Computer System providing that NYCBS has given reasonable advance notice to DOT and the customers of the program Website must be fully functional. This includes but is not limited to the ability to: process transactions, provide real-time data and map; and provide subscriber account information, such as rental histories The Central Computer System must be fully functional The operator will ensure that all bicycles are in circulation as agreed upon by all parties. The bicycle fleet size shall not go below 90% of the program fleet from March to January, and shall not go below 70% between January and March Docks must be repaired within 48 hours of discovery or notification of a defect. Defect includes but is not limited to the ability to rent and receive bicycles from all user types and full functionality of all communications and transaction systems Performance Level <97% <99% <97% <99% March 2014 Monthly Report Actual Performance There were no snow events that resulted in system shut down during the reporting period There were no snow events during the period. Stations were operational for all transaction types 90% of the time for the month. A number of work orders were open for long periods of time due to constraints in the supply of spare credit card readers. There were no reported website outages during the reporting period There were no reported Central Computer System outages during the reporting period Average fleet size for the month was 5,028 (84%). Breakdown of daily fleet size can be found in the accompanying spreadsheet. NYCBS repaired 64% of dock malfunctions within 48 hours. Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 10

Ref Name 16 17 Peak Hours Bicycle Rebalancing Non-Peak Bicycle Rebalancing 18 Call Center 19 Delivery of Reports Service Level Agreement Bicycles shall be redistributed throughout the system as necessary to meet demand. The number of bicycles at any station during peak hours (peak hours being defined herein as 8 am to 8 pm Monday through Friday) shall not be completely full or completely empty. Liquidated damages shall not be assessed if the next closest station in any direction is not full or empty during the same period of time Bicycles shall be redistributed throughout the system as necessary to meet demand. The number of bicycles at any station during nonpeak hours (non-peak hours being defined herein as 8:01 pm to 7:59 am Monday through Friday as well as Saturday and Sunday) completely full or completely empty The call center within New York City limits will answer a minimum of 80% of the calls each year from, at a minimum, 7 am to 7 pm, 365 days a year The operator will provide all reports on the agreed upon schedule Performance Level <96% March 2014 Monthly Report Actual Performance Stations were available 97% of the time during peak hours. NYCBS does not have a system for calculating whether the next closest station was full or empty. Stations were available 98% of the time during non-peak. Call center answered 97% of the calls for the month Delivery of this report is considered completion of this service level agreement for the month Citi Bike NYC operated by NYC Bike Share, LLC; 5202 3rd Avenue, Brooklyn, NY 11220 11