1. The well has been shut in on a kick and the kill operation has not started.

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

SUBSEA KILL SHEET EXERCISE No. 5

Practice Exam IADC WellSharp Driller and Supervisor

WILD WELL CONTROL WARNING SIGNS OF KICKS

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

VOLUMETRIC METHODS and STRIPPING OPERATIONS

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives

Well Control Institute (WCI) Core Curriculum and Related Learning Outcomes: Supervisory Level

Worked Questions and Answers

W I L D W E L L C O N T R O L COMPLICATIONS

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

Well Control for Supervisors for Drilling Operations Core Curriculum and Related Learning Objectives

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

August 21, Deepwater MPD / PMCD

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Extended leak off testing

OPTIMUM SELECTION OF WELL CONTROL METHODS

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures)

PTTCO Drilling Well Control Training Course

Understanding pressure and pressure

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

Blowout Engineers personnel have worked in over 40 countries and have a wide range of experience in addition to blowout control operations.

Deepwater Horizon Incident Internal Investigation

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

Rig Math. Page 1.

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Why Do Not Disturb Is a Safety Message for Well Integrity

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

What are the Well Control Complications While Drilling with Casing or Liner? Tawfik Elshehabi and H. Ilkin Bilgesu, West Virginia University

IWCF Equipment Sample Questions (Surface Stack)

Kicks Controlling Techniques Efficiency in Term of Time

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells.

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

Hard or Soft Shut-in : Which is the Best Approach?

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

BLACK HILLS PLATEAU PRODUCTION COMPANY

Drilling Efficiency Utilizing Coriolis Flow Technology

W I L D W E L L C O N T R O L FLUIDS

Step-Rate Formation Integrity Test Method for Geothermal Wells

Operations planning for optimal hole cleaning

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

UPM A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling

Casing Design. Casing Design. By Dr. Khaled El-shreef

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

W I L D W E L L C O N T R O L AIR DRILLING

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

The Diagnosis of Well Control Complications during Managed Pressure Drilling

Chapter 5 HORIZONTAL DRILLING

Chapter 4 Key Findings. 4 Key Findings

Float Equipment TYPE 925/926

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

Chapter 5 Drilling and Well Testing Practices

OCEAN DRILLING PROGRAM

Texas Administrative Code

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

WELL NO: BJN-8. Lower master valve

Book 3 - Well Control Calculations

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Evaluation of deepwater kicks and future countermeasures

UNIT 2 PATTERNS OF NATURAL

Air and Gas Drilling

ANALYSIS OF ALTERNATIVE WELL CONTROL METHODS FOR DUAL DENSITY DEEPWATER DRILLING

BaraShield -664 LCM Standard Field Application Procedure

Commentary on the book by Andrew Hopkins. By Graham Dalzell

APPENDIX A1 - Drilling and completion work programme

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

and and Norton J. Lapeyrouse CONTENTS

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

Automatic Well Control Simulations

Hydro-Mech Bridge Plug

EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING

DRILLSCENE PROACTIVE DRILLING DECISIONS

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Petr 311 Wellbore pressures and Kick Control

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

DRILLING IN VIETNAM. Section 2 VIETNAM APPROVED PROCEDURES

Transcription:

Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank fills while tripping Deviation from fingerprint trend Shallow Gas Top-hole Drilling Considerations: Control ROP Pump out of hole trips Max pump rates on kick Drill riser-less Warning Signs of kicks/abnormal pressure: Drilling break- gradual increase in ROP Increase in return flow rate Pit gain Well Flows with pumps off Decrease in circulating pressure Reduction is mud weight Increase in torque/drag- RPM Gas in Oil-base Mud: Can stay in solution until Bubble Point - Bubble Point is the point near the surface when the hydrostatics pressure above the gas is low enough to allow the gas to break out of solution. When gas breaks out surface pressures will increase rapidly Harder to detect gas influx with low permeability formations Study Guide IADC WellSharp Driller and Supervisor Rev 1 August 2016 Page 1

Ballooning: At connection well flows and when pumps on lose mud Annular Pressure Loss (APL) causes the extra pressure that induces the loses SICP SIDP If you suspect ballooning, first thing to do is to shut the well in. Verify by bleeding 1-2 barrels then check to see if pressures drop; if casing increases at all then it is not ballooning (it is a kick) After verifying ballooning circulate bottoms up through an open choke Slow Circulating Rates (SCR s): Retake: a. When you drill long sections of hole rapidly (500 of new hole) b. Each tour c. After mud weight change or significant mud properties type change d. Following pump repairs- pulsation dampener is not a pump repair e. After BHA change or trip Gelled mud can give inaccurate readings Reasons for using slow pump rates: a. To provide lower pressures during kill- lowers APL and choke line friction for subsea b. To provide more reaction time on the choke c. Pump and pressure limitations Record on gauge to be used on the kill- choke panel drillpipe gauge Indications of Abnormal Pressure: Increasing gas levels- connection gas, background gas (lagging indicators) Changes in mud weight Increase in cavings/cuttings shape and volume Decrease in cuttings/formation density Drilling break- gradual increase in ROP Changes in mud properties (viscosity, chlorides, etc.) MWD Study Guide IADC WellSharp Driller and Supervisor Rev 1 August 2016 Page 2

Oil-base Mud Temperature/Pressure: Increase in temperature increases volume and deceases density Increase in pressure increases density Transition Zones: Fingerprint connections Increase crew awareness to warning signs Monitor shakers for cavings Determines Size of Influx: Formation permeability (high permeability will give larger influx) Kick Intensity (difference in mud weight and formation pressure) Closing Time Determines SIDPP: Hydrostatic pressure of the column of fluid in the drill pipe (bit at bottom of hole) Formation pressure Determines SICP: Hydrostatic pressure of the column of fluid in the annulus a. Annulus capacity per foot (height of influx) b. Size of kick (barrels) Formation pressure Kick Gas Expansion during circulation: Volume of gas increases Pressure of gas decreases Pit level will increase until gas enters the choke then pit level will decrease Study Guide IADC WellSharp Driller and Supervisor Rev 1 August 2016 Page 3

Only times casing can be held constant: Study Guide IADC WellSharp Driller and Supervisor Changing SPM (start-up, shut-down, etc.) Pumping kill mud to bit 2 nd circulation Drillers Method (no influx in the annulus) Once influx is out 1 st circulation Drillers Method (no influx in the annulus) Shoe Pressures and MASP/MAASP Fracture pressure is the total pressure applied at the shoe that breaks down the formation Maximum Allowable Surface Pressures are the casing burst and the pressure that causes breakdown at the shoe Needed to calculate shoe leak off: a. Shoe TVD b. HP of mud at the shoe c. Pressure applied to leak off d. Accurate calibrated gauge Larger risk of exceeding MASP when mud hydrostatic pressure is closer to formation pressure Shoe pressures greatest upon initial influx or top of gas bubble at the shoe Shoe pressures will remain constant once all gas influx is in the casing Short open hole section least likely to exceed MASP Gas in Horizontal Section: Pit volume remains constant as influx is circulated along horizontal section SIDPP equal to SICP- because the kick in the horizontal section does not have the vertical height to affect the hydrostatic pressure in the annulus Casing pressure will increase as gas influx is being circulated from horizontal into vertical section Using Wait &Weight Method vertical kill sheet on a horizontal well will apply too much pressure Bit above the Influx: SIDPP equal to SICP If can t strip back to bottom, use Volumetric Method until influx past the bit then switch to circulation method. When stripping through the gas bubble, must allow casing to increase. (If you were to hold casing constant, you would decrease Bottom Hole Pressure (BHP).) Study Guide IADC WellSharp Driller and Supervisor Rev 1 August 2016 Page 4

Bottom Hole Pressure (BHP): Study Guide IADC WellSharp Driller and Supervisor Basic principle of BHP technique is to maintain BHP at least equal to formation pressure. U-tube concept keeps BHP the same on both sides of the well. In all constant BHP methods of well control, if you are doing the right thing, BHP will remain constant. If action is the wrong thing to do, then decide which way you go with the choke. (open will decrease BHP, close will increase BHP) Wait & Weight Method: Follow drillpipe pressure schedule while pumping Kill Mud to the bit. With Kill Mud to the bit SIDPP should be equal to 0. If not, check for trapped pressure then circulate more strokes if still has pressure. If mixing hopper blockage, shut-in and fix blockage. Hold FCP once Kill Mud is past the bit. Drillers Method: On 1 st circulation, once kick is out SICP should equal original SIDPP. If mixing hopper blockage on 1 st circulation, keep circulating while blockage is fixed. On 2 nd circulation of Kill Mud to the bit, follow drillpipe step-down schedule or hold casing constant as long as no influx in the annulus. Hold FCP once Kill Mud is past the bit. Wait & Weight verses Drillers Method: Wait & Weight provides lower equivalent pressures at the shoe than Drillers Method when the drill string volume is less than the open hole volume. Otherwise the pressures at shoe will be the same with either one. Wait & Weight requires one circulation where Drillers Method requires two circulations. Drillers Method requires more time on the choke with underbalanced kicks. Volumetric Method: Maintains constant bottom hole pressure while gas migrates to surface. Volumetric is complete when all the gas is at the surface. Once gas exits choke, shut-in and check pressures, if casing increases, continue with volumetric. Study Guide IADC WellSharp Driller and Supervisor Rev 1 August 2016 Page 5

Lube & Bleed: It is a remedial method to be used after Volumetric Method is complete. Also known as pump mud bleed gas Reduces surface pressures by increasing hydrostatic pressure and removing gas. Cementing, Self-fill, and Non-Return Float: Circulate a full bottoms-up before cementing to insure a good column of mud. As cement sets hydrostatic pressure can reduce causing a kick. If the self-fill failed to convert to a check valve: a. Fluids from the formation or the annulus can enter the casing. b. Cement could u-tube back inside the casing when pumps are stopped. c. Pressure would have to held on casing head to prevent u-tubing. d. If it plugs, normal hook load with depth will slow down due to buoyancy effect. Non-Return Float assembly: a. If casing is not kept full and it fails, mud could u-tube into casing. b. Mud u-tubing back into casing will cause a loss in BHP. Study Guide IADC WellSharp Driller and Supervisor Rev 1 August 2016 Page 6