COMPLETE STREETS DURING CONSTRUCTION

Similar documents
Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Accommodating Pedestrians in the Work Zone

ADA on Construction. Guidance for Section C Plan Preparers

ADA* for Roadway Design

ADA PRESENTATION (CURB RAMPS)

ADA & Public Rights of Way

Work Zone Safety A Look At Best Practices. AASHTO SCOTE June 6, 2016

2017 Temporary traffic control guidelines for pedestrians. v.2

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

MUTCD Part 6: Temporary Traffic Control

Pedestrian Accommodation in Work Zones:

Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices

Traffic Control Inspection Checklist Segment:

Hospital Link Project Project Update September 2017

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

INDOT Complete Streets Guideline & Policy

2018 AASHTO BIKE GUIDE

MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018

CURBSIDE ACTIVITY DESIGN

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

CHAPTER 6H. TYPICAL APPLICATIONS

MUTCD Part 6D: Pedestrian and Worker Safety

PEDESTRIAN CROSSING TREATMENTS

Temporary Traffic Control for Highway Work Zones

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

2018 AASHTO BIKE GUIDE

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

Table of Contents. Introduction. Prompt List Arterials and Streets. Prompt List Interchange. Prompt List Intersections. Prompt List Limited Access

ADA Operations Contact Info

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Route 47 (North Main Street) Reconstruction

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

Off-road Trails. Guidance

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

SOUTH MAIN STREET ROUTE 28

Appendix 3 Roadway and Bike/Ped Design Standards

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

Edison Electric Institute. Work Zone Safety October 4-7, 2009

Hospital Link Project Project Update November 2017

Appendix A Guiding Principles for Cycling Safety in Work Zones

CHAPTER 6H. TYPICAL APPLICATIONS

ADA Training Standard Plans

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Field guide for Accessible Public Rights-of-Way Edition

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

SECTION TRAFFIC REGULATIONS

Steps to Conducting a Complete Streets Assessment

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

Small Town & Rural Multimodal Networks

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Bicycle Facilities Planning

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

What Is a Complete Street?

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

12A Accessible Sidewalk Requirements

Derby Street. Project Updates. Salem, Massachusetts

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Arlington County, Virginia ~ National Capital Region Transportation Planning Board (TPB) Transportation and Land-Use Connections (TLC) Program

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Complete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013

Chapter 6: Along the Street

Chapter 5. Complete Streets and Walkable Communities.

AMATS Complete Streets Policy

NJDOT Complete Streets Checklist

12A Accessible Sidewalk Requirements. 12A Protruding Objects

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

Field guide for Accessible Public Rights-of-Way Edition

Table of Contents. 2 Applying the Americans With Disabilities Act In Work Zones: A Practitioner Guide

PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

ROUNDABOUTS/TRAFFIC CIRCLES

Complete Streets Funding Program Project Prioritization Plan

Chapter 2: Standards for Access, Non-Motorized, and Transit

Paul Vraney Bureau of Project Development 02/11/2016

Who is Toole Design Group?

GENERAL. 1. Description

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

INTERSECTION DESIGN TREATMENTS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

700 Multi-Modal Considerations

Washington St. Corridor Study

Chapter 17. Work Zone Management. 17 Work Zone Management

COMPLETE STREETS FUNDING PROGRAM

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

Fundamentals of Traffic Control Devices

Transcription:

COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

Presentation Outline Brief Overview of Complete Streets Project Planning Project Outreach Complete Streets Construction Management Plan (CMP) Elements

Brief Overview of Complete Streets Complete Streets are streets for everyone. They are designed and operated to enable safe access for all users, including pedestrians, bicyclists, motorists and transit riders of all ages and abilities. A Complete Streets approach integrates people and place in the planning, design, construction, operation, and maintenance of our transportation networks.

Brief Overview of Complete Streets

BRIEF OVERVIEW OF COMPLETE STREETS Cities and Towns with Complete Street Initiatives

Project Planning First Avenue Improvements, New York City

Project Planning

PROJECT PLANNING ADA Title II Regulations Adopted by Design Guides

PROJECT PLANNING Existing Project Site and Land Uses

PROJECT OUTREACH Information Tempers Expectations

PROJECT OUTREACH Methods to Reach Out to Public Wayfinding Signage Portable Changeable Message Signs (PCMS) Variable Message Signs (VMS) Project Web Sites E-mail Blasts Flyers

Complete Streets CMP Elements Construction Management Plan (CMP) A living, collaborative document that communicates to the public logistic and sequencing for roadway construction, building construction, or maintenance projects. The CMP clearly lays out how the project is undertaken, what steps are taken to maintain access for all users and what means are used to communicate the project to the public.

Complete Streets CMP Elements Pedestrians Bicycles Automobiles Transit Emergency Access Construction Activities

Pedestrian Accommodations

Common Mistakes During Construction Sidewalk Construction Fully Close Sidewalk for Construction or Extra Site Staging No Proper Detours No Protected Pedestrian Path of Travel

Common Mistakes During Construction Work and Equipment that Impedes Access to Next Block No Where to Detour Pedestrians on Current Sidewalk

Common Mistakes During Construction Loss of Existing Pedestrian Signal Accessibility Construction Staging May Block Access to Pedestrian Facilities Common Examples: Sidewalk Replacement Removing Medians with Signal Equipment Replacing Traffic Signal Equipment

Complete Streets CMP Elements Creating an Alternate Route without Laying Asphalt or Another Smooth Continuous Surface

Standards To Be Met During Construction Americans with Disabilities Act of 1990 R201.2 Temporary and Permanent Facilities The requirements in this document [PROWAG] shall apply to temporary and permanent facilities in the public right-of-way. Source: PROWAG AAB 521 CMR 2.00: 2.6 Maintenance of Access Features At all times, accessibility features must be maintained and fully operational Source: MA AAB Rules and Regulations A path of travel includes a continuous, unobstructed way of pedestrian passage by means of which the altered area may be approached, entered, and exited. Source: ADA Title II

Design Regulations for Path of Travel Wheelchair Passage Width

Wayfinding Signage

Pedestrian Management Guidance System Short-term Use, Mostly for Sidewalk Reconstruction or Utility Connections Light-weight, Easily Moveable Provides Handrail and Detectable Edge for Visually Impaired Not Crash-worthy Best for Non-roadway Applications

Pedestrian Management Guidance System Accessible Pedestrian Route with Positive Protection Barrier Separation from Vehicles

Temporary Pedestrian Barriers and Barricades PORTABLE PRECAST CONCRETE BARRIER WITH HAND RAIL MassDOT E 403.6.0 MASH TL-II min. rated

Alternate Path of Travel Example Long-term Use, Mainly for Building Construction Typically Portable Precast Concrete Barriers, Not Easily Moveable

Design Regulations for Accessible Curb Ramps Ramp Must Meet Same ADA Guidelines as Permanently Installed Ramps Slope Regulations Detectable Warning Units Level Landings

Portable Temporary Curb Ramp Parallel Used in Alternative Path Off of Sidewalk Can Maintain 4-foot Landings without Extending Far into Roadway

Temporary Building Access Meet ADA Guidelines Slope (1:12 max), Rise (30 max) Clear Width (48 min) Rail Height (18-20 Bottom Rail, 34-38 Top Rail) Level Landings (60 Clear min)

Pedestrian Detours Detours Should be Path of Least Inconvenience Appropriate Wayfinding Signage Should be Used to Direct Pedestrians Not Preferred for Long Duration Closures Be Cognizant of Local Populations

Temporary Pedestrian Signals Relocate Signals on Temporary Foundations Must Adhere to Height (7 min) and Side Offset (1.5-6 typ.) Requirements Audible Pushbuttons for Visually Impaired 42 Above Ground Level

Bicycle Accommodations

Wayfinding Signage

Delineators for Separated Exclusive Path Longitudinal Channelizing System that Should Not be Used to Protect Pedestrians including Workers from Vehicle Impacts or Obstacles - MUTCD

Exclusive, Mixed-use and Shared-use Paths Provide Positive Protection Accessible Pedestrian Route while Maintaining Existing Bike Lane Provide Temporary Mixeduse Path and Emphasize Sharrow Lane for Closed Sidewalk and Bike Path

Shared-use Path Temporary Sharrow Markings During Construction Bicycle Wayfinding Signage for Interim Conditions

Common Mistakes During Construction Placement of Sign Impedes Bicycles Workzone Encroaching Bike Path Poor Markings and Cones

Automobile Accommodations

Wayfinding Signage

Site Specific Signage Clearly Communicate Routes and Businesses Open During Construction

Lane Shift Temporary Markings to Delineate Travel Lane Markings Define Edge in Event Cones/Drums are Knocked Over

Portable Changeable & Variable Signs Utilize Existing Infrastructure: 119 PCMS Installed in Massachusetts between 2012 and 2014 Over 450 variable message boards currently installed in Massachusetts Implement 2 Weeks Prior to Start of Construction Notify Users Prior to Major Changes in Traffic Patterns

Transit Accommodations

Transit Accommodations

Emergency Access Accommodations

Title Provide Gates Clear of Obstructions for Emergency Access Proper Signage Quickly Directs Emergency Personnel

Construction Activities Accommodations Maintain Accessible Pedestrian Route While Providing Protection from Workzone Provide Adequate Workzone Areas and Access

Construction Activities Accommodations Truck turning simulation

MAINTAIN ACCESSIBILITY FOR ALL How to Maintain Throughout the Project Design Temporary Traffic Control Plans (TTCP) to Meet ADA, FHWA and MUTCD Requirements Consider All Users During Design and Implementation for Each Phase of the Project Open Early Coordination with Authorities Having Jurisdiction Provide Full Detail in Special Provisions for Devices Necessary and Means and Methods for Implementing Proposed Measures More Work Upfront Reduces Problems in the Future

Your Title Here. Level One Level Two Level Three Questions?