Construction, Fitting and Testing of Closed Fuel Overflow Systems

Similar documents
Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

Chapter 53 Submersibles 2015

CHAPTER 70 - MULTI-POINT MOORING SYSTEMS

RULES FOR THE CLASSIFICATION OF NAVAL SHIPS

Chapter 21 Navigation Bridge Visibility, Bridge Arrangement and Equipment 2013

Chapter 8 Chemical Tankers JAN 2016

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

Chapter 33 - Polar Class Ships JAN 2017

Chapter 8 Chemical Tankers 2013

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

DNVGL-CP-0187 Edition March 2016

CHAPTER 58 OCEAN TOWAGE

Hours / 100 Marks Seat No.

SLOP RECEPTION AND PROCESSING FACILITIES

Instruction Manual. Pipe Friction Training Panel

A centrifugal pump consists of an impeller attached to and rotating with the shaft and a casing that encloses the impeller.

AIR VENT HEADS STANDARD FOR CERTIFICATION DET NORSKE VERITAS. No. 2.9 Type Approval Programme No OCTOBER 2008

DIMENSIONING WATER SUPPLY SYSTEM IN BUILDING

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

M-06 Nitrogen Generator (Nitrogen Making Machine)

Fuel Filters DN15 DN25. elektrogas.com DE

Rules for Classification and Construction Additional Rules and Guidelines

ANNEX 18. RESOLUTION MSC.362(92) (Adopted on 14 June 2013) REVISED RECOMMENDATION ON A STANDARD METHOD FOR EVALUATING CROSS-FLOODING ARRANGEMENTS

Experiment 8: Minor Losses

Gas Filters DN15 DN300. delta-elektrogas.com EE151 03/17

Self-operated Pressure Regulators for special applications

Applied Fluid Mechanics

TECHNICAL CIRCULAR. Circular No: S-P 32/13 Revision: 1 Page: 1 of 7 Date:

Rules for Classification and Construction Ship Technology

and its weight (in newtons) when located on a planet with an acceleration of gravity equal to 4.0 ft/s 2.

Gas Filters DN15 DN300. elektrogas.com EE151 06/13

01 18/11/2013 correction of the reference of the product 1 4 5

GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

Installation and commissioning instructions 255 series and 256 series

The capacity of the cargo tank venting system (46 CFR );

GRUNDFOS DATA BOOKLET. Hydro Solo-E. Complete pressure boosting systems 50/60 Hz

ASX 176 Axial Pressure regulator

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION

APPENDIX 4 STANDARD FORMAT FOR THE PROCEDURES AND ARRANGEMENTS MANUAL

Hours / 100 Marks Seat No.

INTERIM GUIDELINES FOR DETERMINING MINIMUM PROPULSION POWER TO MAINTAIN THE MANOEUVRABILITY OF SHIPS IN ADVERSE CONDITIONS

STABILITY AND WATERTIGHT INTEGRITY, CLOSING APPLIANCES

Gas Pressure Regulator HON 300

Electrical Shore Connections

The water supply for a hydroelectric plant is a reservoir with a large surface area. An outlet pipe takes the water to a turbine.

Safety shut-off valve S 50. Product information

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid

Explanations hydraulic valves TECHNICAL EXPLANATIONS HYDRAULIC VALVES. Contents. 1. Foreword. 2. Characteristic Values

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition

OIL AND GAS INDUSTRY

THE WAY THE VENTURI AND ORIFICES WORK

Safety shut-off valve S 100. Product information

RESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS

Irrigation &Hydraulics Department lb / ft to kg/lit.

Gas Pressure Regulator HON 200

ISO INTERNATIONAL STANDARD. Earth-mover tyres and rims Part 3: Rims. Pneumatiques et jantes pour engins de terrassement Partie 3: Jantes

Safety Relief Valve HON 832

Calculations of hydraulic resistance of simple pipelines for liquid viscous and non-newtonian products.

ISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves

Tutorial. BOSfluids. Relief valve

Rules for Classification and Construction Ship Technology

Experiment Instructions. Circulating Pumps Training Panel

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

ISO INTERNATIONAL STANDARD

ClassNK Technical Information No. TEC Required minimum propulsion power In principle, the installed propulsion power (total main engine output

Gas Vapor Injection on Refrigerant Cycle Using Piston Technology

Issue Date: Effective Date: Supersedes: V-15 (rev. 2)

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

Product Information. Gripper for small components MPC

ISO 4081 INTERNATIONAL STANDARD. Rubber hoses and tubing for cooling systems for internal-combustion engines Specification

Citation for published version (APA): Somer, F. M. J. J. D. (2003). Strategies for optimisation of paediatric cardiopulmonary bypass s.n.

INTERNATIONAL MARITIME ORGANIZATION

G SPECIFICATION: TITLE: VOLUME: 4 REVISIONS:

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Mounting and Operating Instructions EB 2558 EN. Self-operated Pressure Regulators. Type Pressure Build-up Regulator

Gerald D. Anderson. Education Technical Specialist

Organisation Internationale de Métrologie Légale

Constant Pressure Inlet (CCN) Operator Manual

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

Mounting and operating instructions EB 2530 EN. Self-operated Pressure Regulator. Pressure Reducing Valve Type M 44-2

ISO INTERNATIONAL STANDARD. Flow-metering devices for connection to terminal units of medical gas pipeline systems

SIZING AND CAPACITIES OF GAS PIPING

Technical Information TI-S10 Safety Locks. 2 Function. Contents

ISO INTERNATIONAL STANDARD. Natural gas Measurement of properties Volumetric properties: density, pressure, temperature and compression factor

Application Worksheet

Correction of Pressure Drop in Steam and Water System in Performance Test of Boiler

4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0) Fax: +44 (0)

SIZING AND CAPACITIES OF GAS PIPING

1811G/H PITOT-STATIC TEST SET

Smart Water Application Technologies (SWAT) TM

ISO INTERNATIONAL STANDARD. Earth-mover tyres and rims Part 3: Rims. Pneumatiques et jantes pour engins de terrassement Partie 3: Jantes

ANNEX 16 RESOLUTION MEPC.232(65) Adopted on 17 May 2013

Measuring range Δp (span = 100%) Pa

TECHNICAL DATA Q= C. Table 1 - Specifications

Technical Data Sheet TI-F52 Locking Unit KFHL Certified by Lloyd s Register

F All types of inert gas systems are to comply with the following:

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

Pressure Regulators. Aperflux 851

Transcription:

Construction, Fitting and Testing of Closed Fuel Overflow Systems 2014 This latest edition incorporates all rule changes. The latest revisions are shown with a vertical line. The section title is framed if the section is revised completely. Changes after the publication of the rule are written in red colour. Unless otherwise specified, these Rules apply to crafts for which the date of contract for construction is on or after 1 st of July 2014. New rules or amendments entering into force after the date of contract for construction are to be applied if required by those rules. See Rule Change Notices on TL website for details. "General Terms and Conditions" of the respective latest edition will be applicable (see Rules for Classification and Surveys). If there is a difference between the rules in English and in Turkish, the rule in English is to be considered as valid. This publication is available in print and electronic pdf version. Once downloaded, this document will become UNCONTROLLED. Please check the website below for the valid version. http:/www.turkloydu.org All rights are reserved by Türk Loydu, and content may not be reproduced, disseminated, published, or transferred in any form or by any means, except with the prior written permission of TL.

TÜRK LOYDU Head Office Postane Mah. Tersaneler Cad. No:26 Tuzla 34944 İSTANBUL / TÜRKİYE Tel : (90-216) 581 37 00 Fax : (90-216) 581 38 00 E-mail : info@turkloydu.org http://www.turkloydu.org Regional Offices Ankara Eskişehir Yolu Mustafa Kemal Mah. 2159. Sokak No : 6/4 Çankaya - ANKARA / TÜRKİYE Tel : (90-312) 219 56 34 Fax : (90-312) 219 68 25 E-mail : ankara@turkloydu.org İzmir Adana Atatürk Cad. No :378 K.4 D.402 Kavalalılar Apt. 35220 Alsancak - İZMİR / TÜRKİYE Tel : (90-232) 464 29 88 Fax : (90-232) 464 87 51 E-mail : izmir@turkloydu.org Çınarlı Mah. Atatürk Cad. Aziz Naci İş Merkezi No:5 K.1 D.2 Seyhan - ADANA / TÜRKİYE Tel : (90-322) 363 30 12 Fax : (90-322) 363 30 19 E-mail : adana@turkloydu.org Marmaris Atatürk Cad. 99 Sok. No:11 Kat:4 Daire 6 Marmaris - MUĞLA / TÜRKİYE Tel : (90-252) 412 46 55 Fax : (90-252) 412 46 54 E-mail : marmaris@turkloydu.org

Contents Section 1 - Construction, Fitting and Testing Of Closed Fuel Overflow Systems A. GENERAL... 1-2 1. Other rules 2. Definition of designations 3. Grouping of closed fuel oil overflow systems 4. Documents for approval B. CONSTRUCTION AND EQUIPMENT OF THE SYSTEMS... 1-6 1. Systems of group I 2. Systems of group II 3. Systems of group III 4. Overflow tanks C. TESTING... 1-10 1. Initial operation of the system Annex A - Calculation of The Overflow Line... 1-11 1. Formula characters 2. Calculation of the overflow line 3. Calculation of the pressure losses in the overflow line 4. Calculation of statical pressure losses

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-1 SECTION 1 CONSTRUCTION, FITTING AND TESTING OF CLOSED FUEL OVERFLOW SYSTEMS Page A. GENERAL... 1-2 B. CONSTRUCTION AND EQUIPMENT OF THE SYSTEMS... 1-6 C. TESTING... 1-10 Annex A Calculation of the Overflow Line... 1-11

1-2 Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems A. General The construction, equipment and testing of closed fuel oil overflow systems shall be in accordance with these Additional Rules. 1. Other rules Beside of these Additional Rules the following TL Rules apply also: Chapter 1 Hull, Section 12 Chapter 4 Machinery, Sections 13 and 16 Chapter 5 Electrical Installation 2. Definition of designations 2.1 Closed overflow system A closed overflow system is a system which is so constructed and equipped that during fuel oil bunkering the permitted design pressure of the storage tanks cannot be exceeded. A closed overflow system consists of all pipe lines (bunker lines, overflow pipeline, transfer lines of the tanks), storage tanks and overflow tanks together with their associated valves and fittings as well as all control and measuring devices. 2.2 Overflow pipeline The overflow pipeline (overflow main and branches) is the part of the closed overflow system through which the fuel oil is led to the overflow tank. The overflow pipeline may be arranged before or after the storage tanks. 2.3 Design pressure The design pressure for the storage tanks is the test pressure height according to TL Rules, Chapter 1 Hull, Section 12. For overflow systems according to 3.1 the dynamic pressure losses are to be considered in addition. 2.4 Bunker station The bunker station is the location from where the bunkering operation is centrally monitored and controlled. 3. Grouping of closed fuel oil overflow systems Within the scope of these Additional Rules closed fuel oil systems are subdivided into three groups. 3.1 Systems of group I Systems of group I (Fig. 1.1) are systems having monitoring devices whereby excess pressure in the storage tanks is prevented by reduction of the bunker rate.

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-3 Overflow is effected by means of an overflow line between storage tank and overflow tank. 3.1.1 The storage tanks may be filled only to a maximum level defined by the shipyard with the maximum designed bunker rate. 3.1.2 On reaching of the maximum level, the tanks are finally filled by the calculated topping-up rate. The maximum permitted topping-up rate is to be monitored by the flow meter. If the flow meter shall be dispensed with (with owners confirmation), the maximum permitted topping-up rate shall be reduced down to 2/3 of calculated topping-up rate. 3.1.3 If the overflow line is constructed for the designed bunker rate, the requirements according to 3.1.1 and 3.1.2 may be dispensed with. 3.2 Systems of group II Systems of group II (Fig. 1.2) are systems having pressure limiting devices (1) whereby pressures in excess of the tank design pressure are prevented by means of an intermediate overflow valve. Overflow is effected by means of an overflow line and overflow valve between bunker line and overflow tank. 3.2.1 The overflow valve may be direct acting or be controlled by auxiliary energy. 3.2.2 Each storage tank is to be fitted with two independently actuating limit switches. 3.2.3 The storage tank may be filled by the maximum designed bunker rate up to the first level (limit switch slowdown). Topping-up of the tanks is to be carried out at a reduced bunker rate. 3.2.4 The maximum permitted filling level of each storage tank is monitored by a second limit switch (max. alarm). With this alarm/signal the tank filling valve shall be closed. 3.2.5 If overflow valves are controlled by auxiliary energy they will be opened by the limit switch max. alarm when the maximum permitted filling level is exceeded. 3.3 Systems of group III Systems of group III (Fig. 1.3) are systems equipped with pressure limiting devices and automatic control of the tank valves, whereby pressures in excess of the design pressures of the storage tanks are prevented by automatic limitation of the filling levels. (1) Overflow valves or other suitable devices can be applied as pressure limiting devices. In the following the designation overflow valves is used.

1-4 Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems Fig. 1.1 Fuel oil overflow system of group I Fig. 1.2 Fuel oil overflow system of group II

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-5 Overflow is effected by an overflow line and overflow valve between bunker line and overflow tank. 3.3.1 Each storage tank is to be equipped with two independently actuating limit switches by which control of the tank inlet valves and the overflow valve is effected. 3.3.2 The storage tanks may be filled with the maximum designed bunker rate up to the first limit level (limit switch slowdown alarm). By actuation of the limit switch slowdown alarm, the filling valve of the tank concerned is closed and locked. When the last tank to be filled has reached that limit level, the overflow valve is opened simultaneously. Fuel oil bunkering shall be stopped. 3.3.3 The system shall be switched to topping-up operation. This effects closing of the overflow valve and opening of the inlet valves of the tanks to be filled-up. The storage tanks can then be further filled by the topping-up rate. By means of the second limit switch (max. alarm) the filling valves of the individual tanks are closed and locked. When the last tank has reached that level, the overflow valve is opened simultaneously. Bunker / topping-up operation has to be stopped. 3.3.4 On completion of fuel oil bunkering the overflow system may be switched to normal operation. Now the tank valves are unlocked, the overflow valve is closed and the limit switches are inactive. 3.3.5 Filling valves of storage tanks which are not to be filled, are to be closed and locked prior to fuel oil bunkering and the corresponding limit switches are to be switched to the position inactive. Fig. 1.3 Fuel oil overflow system of group III

1-6 Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 4. Documents for approval The following documents are to be submitted to TL in triplicate for approval. 4.1 For systems of groups I. II and III tank plan of the storage tanks including tank design pressures schematic drawing of the overflow system pressure loss calculation for the overflow pipeline technical data on level indicating arrangement and limit switches list of pipes and valves electrical wiring diagrams bunkering instructions 4.2 Additionally for systems of group I dimensioned isometric drawing of the overflow pipeline technical data of the flow meter 4.3 Additionally for systems of group II technical data of the overflow valves in the case of using direct acting overflow valves: Dimensioned isometric drawing of bunker line, overflow pipeline and transfer lines as well as a pressure loss calculation for the filling lines of the tanks up to the overflow valve. 4.4 Additionally for systems of group III technical data of the overflow valves and the remote controlled tank valves and their wiring diagrams B. Construction and Equipment of the Systems 1. Systems of group I 1.1 Construction 1.1.1 It is to be proved by calculation that the total resistance through the overflow line does not exceed the design pressure of the tanks connected to the system during overflow, taking the topping-up rate into consideration.

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-7 The calculation of the overflow line is to be carried out for the proposed topping-up rate according to Annex A. 1.1.2 The level limits in the tanks are to be so arranged that the remaining volume between the level switch and tank top is sufficient to take up the volume until the bunker rate is reduced (2). 1.2 Equipment 1.2.1 Bunker line The bunker line is to be fitted with filter, pressure gauge, thermometer and flow meter (3). 1.2.2 Storage tanks The storage tanks are to be fitted with level indicating arrangements. Each tank is to be provided with an independent limit switch. 1.2.3 Overflow line The overflow line is to be provided with heat tracing and insulation, if necessary. 1.2.4 Bunker station The following equipment shall be arranged in the bunker station: remote level indicators and level alarms of the storage tanks end position indicators for remote controlled tank valves, if provided indicator of the flow meter, if provided level alarm of the overflow tank bunkering instructions 2. Systems of group II 2.1 Construction 2.1.1 The overflow line is to be so designed as to allow overflow of the maximum permitted bunker rate to the overflow tank with opened overflow valve without excess pressure increase in the tanks. (2) For guidance, a period of approximately 5 minutes can be assumed for the time needed until the bunker rate is reduced down to topping rate. (3) Without flow meter, the maximum permitted topping-up rate shall be reduced down 2/3 of maximum calculated topping-up rate. See also A.3.1.2

1-8 Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 2.1.2 The set pressure of direct acting overflow valves is to be determined as follows: p o = (H 1 - H 2 ) g ρ w [N/m²] p o = set pressure of the overflow valve [N/m²] H 1 = height of test pressure of the tanks above base [m] H 2 = fitting position of the overflow valve above base [m] g = acceleration due to gravity [m/s²] ρ w = density of water [kg/m³] If the tanks have been designed for different test pressure values, the lowest pressure value is to be set for H1. 2.1.3 Overflow valves with auxiliary energy shall open automatically at failure of energy supply and be equipped with means for manual operation. 2.1.4 When using overflow valves with auxiliary energy, the limit switch (max. alarm) is to be so adjusted that the overflow valve will open before the design pressure of the particular tank is reached. 2.2 Equipment 2.2.1 Bunker line The bunker line is to be fitted with filter, pressure gauge and thermometer. 2.2.2 Storage tanks The storage tanks are to be fitted with level indicating arrangements. Two independent actuating limit switches are to be installed in each tank. 2.2.3 Overflow line The overflow line is to be provided with an overflow valve. 2.2.4 Bunker station The following equipment is to be arranged in the bunker station: remote level indicators and level alarms of the storage tanks end position indicators for remote controlled tank valves, if provided level alarm of the overflow tank pressure gauge for the bunker line if a direct acting overflow valve is arranged end position indicator for the overflow valve

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-9 bunkering instructions 3. Systems of group III 3.1 Construction 3.1.1 The filling limit levels are to be determined by consideration of bunker rate and topping-up rate respectively, volume and shape of tanks, closing time of the tank inlet valves of the tanks as well as opening time of the overflow valve (4). 3.1.2 Overflow valves with auxiliary energy shall open automatically at power failure and be fitted with means for manual operation. 3.1.3 The overflow line is to be so designed as to allow the maximum permitted bunker rate to be discharged to the overflow tank with open overflow valve without excess pressure increase in the tanks. 3.1.4 The air pipes of the storage tanks are to be dimensioned and arranged as to avoid any pressure increasing which may affect the measuring. 3.2 Equipment 3.2.1 Bunker line The bunker line is to be fitted with filter, pressure gauge and thermometer. 3.2.2 Storage tanks The storage tanks are to be fitted with level indicating arrangements. Two independently actuating limit switches are to be installed in each tank. 3.2.3 Overflow line The overflow line is to be provided with an overflow valve. 3.2.4 Bunker station The following equipment is to be arranged in the bunker station: remote level indicators and level alarms for the storage tanks end position indicators for remote controlled tank valves and overflow valves level alarm for the overflow tank bunkering instructions (4) Guidance for the limit levels in the tanks: Limit level 1: approximate 80 ~ 90 % filling level; Limit level 2: approximate 95 ~ 98 % filling level

1-10 Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 4. Overflow tanks Overflow tanks are to be so dimensioned that they can take up the volume flow entered until bunkering is stopped. Overflow tanks are to be equipped with level alarms at approximate 1/3 full. C. Testing 1. Initial operation of the system 1.1 After completion and prior to the first operation every fuel oil overflow system is to be tested. The following equipment and instruments are to be tested and adjusted: safety devices pressure indicators and their drives alarm and locking devices indicating and measuring instruments 1.2 A TL Surveyor is to be present during the first operation of the system.

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-11 ANNEX A CALCULATION OF THE OVERFLOW LINE 1. Formula characters p = loss of pressure [Pa] = coefficient of pipe friction (1) [-] L = length of the straight pipe [m] d i = inside pipe diameter [m] d a = outside pipe diameter [m] d gl = equivalent pipe diameter [m] w = velocity of flow [m/s] ρ = density [kg/m³] ς = resistance coefficient (2) [-] h geod = geodetic height [m] V = volume flow [m³/s] A = cross section of pipe [m²] A d = cross section of pipe running full U = wetted circumference [m] g = acceleration due to gravity [m/s²] R e = Reynolds number [-] R ekr = critical Reynolds number (2320) = kinematic viscosity [m²/s] c = correction factor [-] (1) In the systems handled in these Additional Rules laminar flow (Re < Rekr) can be assumed (2) The Zeta values needed for the calculation are to be taken from recognized standards or publications

1-12 Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems s = thickness of pipe [mm] s = tolerances of wall thickness [mm] 2. Calculation of the overflow line The overflow line is to be so designed that the dynamic and static pressure losses due to flow through the line with the topping-up rate will not exceed the design pressure of the storage tanks. This means that p ges = p dyn + p stat < design pressure 3. Calculation of the pressure losses in the overflow line The calculation of the pressure losses in the overflow line is made in consideration of the following parameters: maximum allowable viscosity of the fuel oil at bunkering density (3) of the fuel oil related to the temperature 3.1 Calculation of the dynamical pressure losses The loss of pressure in a pipeline results from the resistance behaviour of the straight pipe lengths and their fittings for changes in direction, cross section and flow as well as from their components (valves, sight glasses) and can be determined as follows: p λ ρ w for straight pipe length (1) ρ w for the fittings (2) From formulae (1) and (2) results the dynamical pressure loss of a pipe section, since: (3) resistance coefficient for the straight pipe length of inside diameters d 1.. d n sum of the individual resistance coefficients for fittings and components in pipe sections of flow rate w 1.. w n 3.2 Correction factor and equivalent diameter The allowable tolerances for pipes given in the standards are to be taken into consideration by means of a correction factor. (3) In the calculation the density is given with minimum 1000 [kg/m 3 ]

Section 1 - Construction, Fitting and Testing of Closed Fuel Overflow Systems 1-13 This can be approximately calculated as follows: (4) Equation (4) put in equation (3), results in: (5) Where c n are the correction values for d 1.d n pipe diameters. Equation (1) also applies to non-circular cross sections if instead of the inside diameter d i the equivalent diameter d gl is put in: (6) 3.2.1 Pressure losses for pipes connected in parallel If two or more overflow pipe lines are lead from a storage tank to the collecting manifold, the following applies: - same pressure loss: p dyn = const. - single volume flows add up to the total volume flow V = V 1 + V 2 +. V n The solution of the individual equations (3) can only be found by iteration, since λ = f(re) and Re = f(w). 3.2.2 Pressure losses for pipes connected in series Analogous to 2.2.1 the pressure losses for the individual pipes are to be determined according to equation (3). The pressure loss of all pipes results from the sum of all individual pressure losses: p dyn = p dyn1 + p dyn2 + p dynn 4. Calculation of statical pressure losses The statical pressure loss results from the geodetic heights of the overflow pipelines, measured between tank top and overflow summit (peak) of the pipes. This is to be determined as follows: p stat = h geod g (7)