BALL STOP INSTALLTION GUIDE

Similar documents
FNFB-30 (30 FT FIELDPRO FOOTBALL BACKSTOP SYSTEM) Installation Instructions

20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS

HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION

First Team Sports, Inc. Blast Recreational Volleyball System

No ' Long No ' Long

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

THOR 10 HAMMER CAGE INSTRUCTIONS

First Team Sports, Inc. Stellar Recreational Volleyball System

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Troyer s Gourd Rack 8 unit F R H O P

STATIONARY TRUCK INTERNAL HALYARD CAM CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL COMMERCIAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

STATIONARY TRUCK INTERNAL HALYARD V-CLEAT FLAGPOLES FOR QUICK AND PROFESSIONAL INSTALLATION READ ALL INSTRUCTIONS BEFORE PROCEEDING

American Flagpole & Flag Co. 1(800)

MODEL TRIPEX PULLEY SYSTEM

TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall

CABLES-ONLY SYSTEM PRODUCT GUIDE

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Model: 7200 Collegiate Volleyball System

Model: 5100 OmniSteel Volleyball System

Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B

Reach poles & cables system. product guide

STRAIGHT POLE TENSIONED BATTING TUNNEL POLE LAYOUT

CHAPTER 5 REWIND STARTERS

ASSEMBLY MANUAL HOBIE CATSY

Falcon 3 145, 170, 195 and Tandem Owner / Service Manual

Installation Guide Wall Mounted Angled Flagpole

E. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.

MODEL CHEST PULLEY SYSTEM

MODEL / SINGLE and DUPLEX PULLEY SYSTEMS

SAMPLE PAGE. Section 2... Wire Rope

Installation Instructions

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Tripod Setup Guide (M-TPx)

2,500/4,000 LB Easy Riser Vertical Cable Feighner Lift

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

LEGACY II TM STARTING PLATFORMS

FIRST TEAM SPORTS, INC Storm Portable Series Assembly Instructions

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Assembly Instructions. -Cantilever Boat Lifts

User s Manual. Model SWTC800. CAUTION: Adult Assembly Required

Boat Boat Loader Fitting Instructions

Page 1 of 1 04/19/13 SBR

Cable Replacement Instructions for R-Series Roust-A-Bout 100/150/250

Rudder Kit Assembly Instructions for Quest 13

VERTICAL SURFBOARD CARRIER READ ME! IMPORTANT WARNING!

PULLTARP INSTALLATION & OPERATORS MANUAL

ROCKSOLID DUAL POST ANCHOR

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

II-28 STOKES BASKET OPERATIONS

Installation and Training Manual

Home Batting Cage. Assembly Instructions

-- SGP (NOVA TEAM SQUARE)

Soccer Goal. Model: SG20 Series. Installation, Operation and Maintenance Instructions

Xtender30. Home Batting Cage. Assembly Instructions

600 / 600FC OWNER'S MANUAL

ROCKSOLID SINGLE POST ANCHOR

OUTDOOR BACKSTOP WITH 5'-0" EXTENSION

Side-of-Pole Mount for 1 Module (SPM1) For Module Type C

OWNER'S MANUAL. Copyright 2003 GAMMA - All Rights Reserved

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

Ref Part Part # Qty Letter A Rudder Catcher B X 1/2 PH Bolts C Rudder Bracket

Trampoline Installation Instructions

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

OWNER'S MANUAL. Copyright 1999 ATS - All Rights Reserved

1.0 - OPENING AND CLOSING THE DOOR

HoldUp Plus2. Safety Kit included: See additional instructions for installation. REAR WHEEL TRAY. BASE (1x) lock WASHER (1x) KEY (2x) SAFETY CLIP (1x)

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Installation Instructions - Super Six Electric Arm Kits with Underbody Pivots , , ,

(PLEASE CONTACT YOUR LOCAL DEALER or CUSTOMER SERVICE FOR WARRANTY INFORMATION)

Assembly Guide ST200 FUNCTIONAL TRAINER

Safety System Installation Guide for ARE Wind Poles

How to install AEA s 10 meter meteorological tower

Instant Garage 20' x 12' 3" x 8' 3"

3. Align ratchet drive with female insert on assembly, and raise ratchet handle until the ratchet drive is firmly seated into the assembly.

Hobie Island Spinnaker Instructions

200 STRINGING MACHINE

Installation Instructions - Steel 4 Spring Arm Kits , , , ,

INSTALLING THE PROWLER 13 RUDDER

Side-of-Pole Mount for 1 Modules (SPM1) For Module Types E, F, G, & H ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation

400/488 Rotating Davit Installation Instructions

IF YOU EXPERIENCE ISSUES WITH THIS PRODUCT, DO NOT RETURN TO THE RETAIL STORE WHERE PURCHASED - CALL TOLL FREE: (800) IMPORTANT

Retractable Security Cover for a Swim Spa

Only. Gives You the TechLock. System Advantage ASSEMBLY, DISASSEMBLY AND TROUBLESHOOTING INSTRUCTIONS FOR 3000 SERIES FONTAINE

602 STRINGING MACHINE OWNER'S MANUAL

THE AMERICAN BARN DOOR KITE

FITNESS, SAFETY & MEDICAL SUPPLIES

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

ORNAMENTAL CANTILEVER GATE INSTRUCTIONS

Soma Wind Generators

IMPORTANT: RECEIVING INSTRUCTIONS:

INSTRUCTIONS FOR CHAIN LINK INSTALLATION

Rocky Mountain Instinct / Pipeline Frame Assembly Guide. Date: March 31, 2017

Assembly, Installation, Care, Maintenance and Use Instr uctions.

VERSA BIKE RACK INSTRUCTIONS

CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

Sanibel Owners Manual

EZ-Mount 4 Spring Enclosed System to 22 (Low & High Mount Applications) Installation Instructions

Transcription:

BALL STOP INSTALLTION GUIDE GROUND SLEEVE INSTALLATION: 1. Locate the exact location of the ground sleeve. NOTE: Maximum recommended pole spacing is 20 feet on center. 2. Excavate the pole footing; refer to the minimum footing size shown on the detail drawing for the exact Ball Stop System being installed. NOTE: Refer to local building codes for final footing requirements. Depending on the local soil conditions, the footing size may need to be increased. Please allow for a minimum of 6 of drainage stone at the bottom of the ground sleeve. 3. Place the ground sleeve in the center of the excavated hole and firmly secure to make sure sleeve does not move during concrete pour. The top of the ground sleeve should be flush with finished grade. NOTE: Be sure to position the sleeve so that the installed stop bolt at the bottom of the sleeve runs parallel in line with the nets. Check to see that the sleeve has a stop bolt installed approximately 3 inches from bottom of sleeve. 4. Double check to make sure the ground sleeves are level and plum, it is very important that the ground sleeve be installed perfectly straight. Pour the concrete foundation flush with the top of the ground sleeve; taper the concrete to slope away from center of the ground sleeve to allow water to drain away from the sleeve. The provided ground sleeve cap can be used to help keep concrete and debris out of the sleeve during installation. Be sure to protect the sleeve cap so it can be given to the owner for future use if/when the poles get removed. 5. Allow a minimum of 24 hours for the concrete footing to cure before installing the assembled pole. Page 1 of 6

POLE ASSEMBLY: 1. Install provided pole cap in the top of the pole. 2. Locate clear zip lock hardware bags labeled (1) POLE. a. Install provided eyebolt that has a block pulley attached in the upper threaded insert near the top of the pole. b. Install provided eyebolt only in the lower threaded insert near the bottom of the pole. 3. Install provided rope cleat to the pole at desired location with the provided self-drilling screws. Recommended location is approximately 4 feet from the field level near the bottom of the pole, install the cleat on the left, right or back side of the pole to allow for rope tie off, do not install in the front of the pole as it will interfere with the net. (NOTE: Be sure to not over tighten screws.) 4. Insert the provided 5/16 rope through the block pulley system at the top of the pole; tie the rope to the supplied spring snap clip, O-ring and clamp assembly using a bowline knot or other suitable method (See Photo 1A & 1B below). Pull the spring snap clip assembly down to the installed pole rope cleat, slide the spring snap clip over the bottom of the cleat and tie the other end of rope off to the rope cleat to keep secure when installing the pole in the sleeve. (NOTE: Snap clip, O-ring and clamp assembly must be secured at the cleat for easy access for attaching the net later.) Photo 1A & 1B (Eyebolt attached to Threaded Insert at Top of Pole & Bowline Knot) (Note: Attach Eyebolt & Pulley Assembly to Pole Insert before feeding rope through pulley) 5. Repeat steps 1 through 4 above for all poles. NOTE: 10 Ft. and 12 Ft. Tall Systems DO NOT include the Pulley, Rope or Cleat. Page 2 of 6

END POLE ASSEMBLY: After steps 1 through 4 listed above have been completed on all poles. 1. Locate clear zip lock hardware bags labeled 1 END POLE. Each End Pole bag contains (1) looped end cable, (2) cable/thimble packs, (2) turnbuckles and additional spring snap clips. (NOTE: Items from End Pole hardware bag that are needed for this step: (1) Looped End Cable, (1) Turnbuckle and (3) spring snap clips. Remaining spring snap clips, cable / thimble packs and turnbuckle will be used in section Attaching the Net below.) Photo 2A, 2B & 2C (Upper and Lower Eyebolt Connection to Looped Cable; Turnbuckle Locations) 2. Install provided spring snap clips to upper and lower eyebolts for all end poles. (NOTE: Be sure the spring snap clip is positioned behind the block pulley system on the upper eyebolt nearest to the pole.) 3. Attach one end of the looped cable to the upper spring snap clip; attach the other loop end to the turnbuckle with spring snap clip. Attach the turnbuckle to lower pole spring snap clip. (See photo 2C above). (NOTE: Turnbuckles are used only at the bottom of the two end poles for each net run. Loosen turnbuckle bolts before final placement and tightening of the cable, tighten turnbuckle as needed.) 4. Repeat for all end poles. INSTALLING ASSEMBLED POLE: 1. Be sure that the concrete footing is completely cured before installing the poles. 2. Install the pole in the ground sleeve; the notch at the bottom of the pole should be properly oriented and placed over the installed stop bolt on the sleeve to prevent the pole from rotating. (NOTE: Do not drop the pole in the sleeve, lower until pole reaches stop bolt and then rotate to lock in place. Be sure eyebolts face direction of netting.) Page 3 of 6

ATTACHING THE NET: 1. Lay nets flat on the ground on the field side of poles, be sure that net is pulled and stretched completely out to full length. Position top section of the net closest to the poles, lower section of the net farthest away from the poles. 2. Locate provided black nylon coated cable spools, clear zip lock hardware bags labeled 1 End Pole with remaining (2) cable / thimble packs (1) turnbuckle and additional spring clips. Cable/Thimble Packs shown below in photo 3A, photo 3B shows cable clamps attached to the cable. Photo 3A & 3B (Turnbuckle and Cable Clamp Packs / proper install method) 3. Cut the cable to length based on overall net run from one end pole to the end pole on the opposite end of the net run, add (6) feet to allow for looping and cable clamps. Two (2) cable lengths are required; one (1) for the top and one (1) for the bottom of the net. (NOTE: If desired, you can weave the nylon coated cable through the net as listed below in step (4) prior to cutting the cable to ensure correct lengths.) 4. Weave (1) cable length through the square mesh at the top section of net just below the rope border, weave cable through the mesh squares at approximately every 12 of the net. Repeat for the lower section of the net. (NOTE: If you have nets that run together that create a net seam or joint; please use the provided spool of net twine to lace the net seams together or provided zip ties.) 5. Starting with the top section of the net; loop cable on one end, insert cable thimble and secure with (2) cable clamps, repeat these steps at the other end of the cable. (NOTE: Be sure that the net is pulled and stretched completely out to full length prior to final thimble placement.) 6. Starting at one end pole; attach the spring clip on the hoisting rope to cable loop located at one end of the net, cable clamp and O-ring will need to be removed from the spring clip for the end poles only. Use cable clamp to secure vinyl coated cable and rope border together. 7. Go to the next pole in line and clamp the rope border and the vinyl coated cable together with the cable clamp that is attached to the hoisting rope and spring clip. Repeat this step for all remaining inner poles (see photo 3A below). Page 4 of 6

8. Repeat step 6 above for the opposing end pole. Be sure to measure the exact distances prior to attaching cable clamps for each pole location. Slight adjustments may be required later for final positioning. Photo 4A (Clip, O-ring, Cable Clamp Assembly attached to Pull Rope & Clip) (Note: Vinyl Coated Cable and Net Rope Border to be attached to cable clamp) 9. Starting at one end pole, slowly raise the net. While raising the net, attach the remaining spring snap clips to the vertical edge of the rope border on the net every 24, then attach spring snap clip to the end pole vertical cable, repeat until net is at full height. This will keep the net close to the end poles and minimize gaps. Tie rope off to rope cleat. (NOTE: Depending on the net height, it may be necessary to raise the net in equal increments at each pole location to reduce pull drag especially at the end pole). 10. Continue raising the net on all the inner poles until you reach the opposing end pole. Repeat step 9 above for the opposing end pole. 11. Attach (1) turnbuckle to the bottom spring snap clip at the bottom of the end poles. Loop the lower cable section, insert cable thimble, attach looped end to the turnbuckle and secure with (2) cable clamps. (See photo 2C above). (NOTE: Loosen turnbuckle bolts before final placement and tightening of the cable, tighten turnbuckle as needed. Cut and depose of any excess cable.) 12. Attach lower cable and net rope border to remaining spring snap clips along all the bottom of the remaining inner poles. 13. Inspect and adjust cables and net to desired position and tightness. Page 5 of 6

MAINTENANCE and CARE: 1. Ball Stop Nets should always be lowered when not in use and especially in high wind, snow and ice storms. 2. To help prolong the life of the nets, the nets should be stored inside during the off season or if they will not be used for an extended period of time. Nets should be properly stored in a location that will avoid mice and pest damage. Component List for Each Pole (1) Aluminum Pole (1) Plastic Pole Cap (Black) (1) Aluminum Ground Sleeve (1) Plastic Ground Sleeve Cap (Black) (1) 3/8 x 2.5 S.S. Eyebolt & (1) Block Pulley Assembly (1) 3/8 x 2.5 S.S. Eyebolt (2) 9/32 S.S. Spring Snap Clips (1) ¾ S.S. O-ring & ¼ S.S. Cable Clamp (1) 5/16 Black Poly Rope (Cut to length for specific pole height x 2 plus 5 feet) (1) Aluminum Pole Cleat with (2) Self-drilling screws NOTE: Block Pulley, 5/16 Rope and Pole Cleat are NOT provided with 10 Ft. & 12 Ft. Tall Ball Stop Systems. Net Hardware (2) Lengths of the net run plus (6) feet of Black Vinyl Coated Cable (Cut on site) (4) Cable Clamp / Thimble Packs (2) 3/8 Turnbuckles Additional Hardware list required for END POLES (1) Pre-Cut Looped Black Vinyl Coated Cable Lengths (Sized for height of pole) (1) 3/8 Turnbuckle (3) 9/32 S.S. Spring Snap Clips *Additional Spring Snap Clips (Quantity varies depending on the pole height; 1 extra clip provided for every 2 feet of the pole) Page 6 of 6