CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

Similar documents
PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

MANUAL GAS MANIFOLDS

AUTOMATIC GAS MANIFOLDS

DUPLEX PRESSURE REDUCING SET

Manifolds & pressure reducing sets

AREA VALVE SERVICE UNITS

Installation & Maintenance Manual. C2 & C3 Manifolds

Economy Manifold Alert -2. Installation and Maintenance Manual V1.6

Technical Specification

Specialists in HTM Medical Gas Pipeline Equipment AVSU/Module Operating and Maintenance Instructions

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

Installation Operating Instructions for Duplex Manual Manifolds PX-TMD Series

PureGAS Manifold Control Panel - HTM02-01

Tri-Tech Medical Inc.

Pressure Regulator. Instructions for Use

Theatre Control Panel. Instructions for Use. January 2017 ASF-29 (1)

Installation & Maintenance Manual. Economy Manifold

Pressure Differential Automatic Manifold For LPG. PDH1000 Series. LPG Installation & Operations Instructions

Installation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series

Dialflow Regulator. Instructions for Use

Protocol Switchover Station

Oxygen Dialflow Meter. Instructions for Use

Fully Automatic Gas Manifold. Patent US 7,013,906. Installation & Operation Manual

453 Series Steam Heated Vaporizing Regulator

BOC Healthcare Training

BOC Healthcare training

Budget Range Operators Handbook

Oxygen Dialflow Meter. Instructions for Use

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

Specification for Medical Gas Pipeline s

AND OPERATION INSTRUCTIONS

BRITISH COMPRESSED GASES ASSOCIATION Registered office: 4a Mallard Way, Pride Park, Derby, UK. DE24 8GX Company Number: 71798, England

INSTALLATION MANUAL Matheson Tri-Gas Cabinet Enclosures

U S E R M A N U A L CAUTION. SAVE THESE INSTRUCTIONS Federal (USA) law restricts this device to sale by or on the order of a physician.

SERIES-O REGULATOR. Instructions for use

SAFETY PRINCIPLES FOR PRESSURE REGULATORS FOR MEDICAL OXYGEN CYLINDERS

623 Series Dome Load Regulators

Pressure Regulators. Instructions for Use

This document is a preview generated by EVS

EXD SERIES PRESSURE DIFFERENTIAL SWITCHOVER SYSTEM

Tri-Safem Model I1 Regulator. INSTRUCTIONS and PARTS

MEDICAL EQUIPMENT CATALOG

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

Oxygen Demand Valve. Instructions for Use

EDUCATION DEPARTMENT ACCU-TEST

System Pressure Manager Standard & System Pressure Manager Plus

Flow meter. bellow vaporizer. APL valve. Scavenging system

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

DPC-30 DPC-100. Reference Manual

MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY

Micro Dial-Flowmeter. Instructions for Use

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

Model PDT Dewpoint Transmitter

CENTRAL GAS SUPPLY SYSTEMS : CYLINDER BATTERIES AND HIGH PRESSURE HOSES

Operating Instructions for BAIR22-6 AIR-POWERED CRIMPING TOOL

East SP and Zeus SP Terminal Units Installation, Operation and Maintenance Manual

Electro-Pneumatic Converter YT-940 SERIES

MD R a n g e O p e r a t o r s H a n d b o o k

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Gas Countertop Hot Plates

2 CYLINDER MOBILE CART USER S MANUAL / INSTRUCTIONS

Peninsula Dental Social Enterprise (PDSE)

Firesafe Flowmeter. Instructions for Use

D10S/D20S Wall/Post Mount Inflator Quick Start Manual

Table of Contents. Operating Instructions. Resource v.2 Conserving Regulator

SINGLE STAGE ULTRA-HIGH PRESSURE REDUCING REGULATOR INSTALLATION AND OPERATION INSTRUCTIONS. Certified ISO 9001

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

BCGA GUIDANCE NOTE 17

Pressure Automated Calibration Equipment

Instruction manual. for. high purity gas pigtails 200 bar / 300 bar

Technical Datasheet. Rigid & Retractable Pendants. Rigid Pendant

Zeus Area Valve Service Unit (AVSU) and AVSU Module. Installation, Operation and Maintenance Manual

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

User manual. ZX trolley.

FLOWMETER MODELS: 1MFA, 4MFA, 6MFA and 8MFA Series SAVE THESE INSTRUCTIONS

Standard Gas Countertop Griddle

Installation & Operating Instructions for Genesys Series Manifolds

Calibration Gas Instrument INSTRUCTION MANUAL. Release I. Advanced Calibration Designs, Inc.

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

Operating Instructions Part No

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel:

MANIFLEX System. 52B Series 52C Series 52S Series INSTALLATION AND OPERATION INSTRUCTIONS

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

SIX R (P ) AND SEVEN R (P ) POSITION CYLINDERS Service Information

SINGER MODEL 106/206-RPS-L&H

Yoke Block Instruction Manual

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Digital Range

INSTRUCTIONS FOR MODEL SG6500 GAS HEATERS

ISO INTERNATIONAL STANDARD. Medical gas pipeline systems Part 1: Pipeline systems for compressed medical gases and vacuum

User Information Sheet 013

92831 TEL: (714) FAX:

Pressure Regulators. Operating Instructions. Instrumentation

MEDICAL REGULATOR RANGE (MEDIREG RANGE)

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

CSA Sample Draw Aspirator Adapter Operator s Manual

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

Oxygen Concentrator. Installation and Operation Manual. ClearWater Tech, LLC. Integrated Ozone Systems

Transcription:

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855 VAT

VERSION HISTORY Version Implemented Revision Approved Approval Reason # By Date By Date 1.0 Kevin Pugh 11/09/2013 Rob Parry 1 st Issue O&M Manual Automatic Manifold Page 2 of 14

TABLE OF CONTENTS 1 INTRODUCTION... 4 1.1 Key features... 4 1.2 System Operations... 5 1.3 Pneumatic Operation... 5 1.4 Safety... 6 2 INSTALLATION... 7 3 TESTING... 9 3.1 General... 9 3.2 Testing... 9 3.3 Commissioning... 10 4 MAINTENANCE... 10 5 PREVENTATIVE MAINTENANCE... 10 6 SPARE PARTS... 11 7 WARRANTY... 11 8 CONTACT US... 12 9 REGULATORY REQUIREMENTS... 13 APPENDIX A: OPERATIONS & MAINTENANCE MANUAL APPROVAL...14 O&M Manual Automatic Manifold Page 3 of 14

1 INTRODUCTION The CPX Precision UK emergency Standby manifold shall fully comply with the requirements of the UK DoH Health Technical Memorandum 02-01 (HTM 02-01). The emergency standby manifold ESM shall be manufactured under an ISO 13485:2003 quality management system. A copy of the certificate of registration shall be provided for review. The ESM shall be designed and certified for use with oxygen at 300 bar and 60 C. The ESM shall provide a backup supply of medical gas from a high pressure cylinder bank via a suitable arrangement of pressure regulators, providing a constant downstream nominal pipeline gauge pressure of 400 kpa. (SA7-700 Kpa) 1.1 KEY FEATURES Emergency Standby Manifolds (ESM) comprise a pressure regulator, manifold header & rack, tailpipes, a cylinder contents pressure switch, an isolation valve and a pressure relief valve. The ESM is for use with a manifold installation to provide a back-up supply whilst maintenance is being carried out to, or failure of, the main supply manifold. Manifolds are available for oxygen, nitrous oxide, 50% oxygen/50% nitrous oxide mixture and compressed air. An isolation and pressure relief valve assembly is provided with copper stub pipes for on site copper to copper joints to the hospital distribution pipeline and exhaust pipeline. A non return valve is incorporated into each point where the tailpipe connects into the header to prevent a whole bank of cylinders becoming depleted in the event of a cylinder being disconnected or a tailpipe rupture. Tailpipes are available with pin-index or bull nose cylinder connections. O&M Manual Automatic Manifold Page 4 of 14

1.2 SYSTEM OPERATIONS The ESM is not automatic and must be operated manually when required. The ESM should be kept in the following state when not in use, i.e. in standby mode; (a) Both cylinders should be full of gas and connected to the tailpipes. (b) One cylinder should closed and the other cylinder open, supplying pressure to the regulator. (c) The isolation valve to the distribution pipeline should be closed. When the ESM is required, i.e. during maintenance or in an emergency, the isolation valve should be opened to supply the distribution pipeline. When the cylinder supplying gas becomes exhausted, the cylinder valve on the other full cylinder should be opened and the empty cylinder valve closed. The empty cylinder should then be disconnected from the tailpipe and replaced with a new full cylinder. When the fault with the main supply manifold has been rectified, the isolation valve on the ESM should be closed and the ESM left in the standby mode. 1.3 PNEUMATIC OPERATION The gas from the left hand (LH) cylinder is connected to the header via the LH tailpipe. This is connected to the contents pressure switch, contents pressure gauge and passes through regulator to the outlet pressure gauge. Similarly, the gas from the right hand (RH) cylinder is connected to the header via the RH tailpipe. This is connected to the contents pressure switch, contents pressure gauge and passes through regulator to the outlet pressure gauge. The contents pressure gauge indicates the cylinder contents pressure in the LH and RH cylinders respectively, depending on which cylinder is open. The outlet pressure gauge indicates the outlet pressure from the regulator. When the pressure in the header falls below the setting of the pressure switch, the other cylinder is opened thus allowing the ESM to continue O&M Manual Automatic Manifold Page 5 of 14

with the gas supply. The empty cylinder should now be replaced with a full cylinder. This sequence will continue. 1.4 SAFETY The CPX ESM must be fixed in consultation with the construction manager during installation procedure. The methods described for the fixation, gases and power supply are general recommendations and there implementation is to be planned and designed for each individual case by qualified experts. Precision UK ESM s are not suitable for use in potentially explosive areas. CPX ESM s are suitable for continuous duty. CPX ESM s are pre wired in accordance with BS EN 7671 wiring regulations. This equipment should be kept clean and be free from oil and grease at all times. Oil and grease will ignite spontaneously in the presence of oxygen. If you suspect that any equipment is contaminated. DO NOT USE IT. No attempt should be made to use or modify this equipment for use with gas other than the gas identified. O&M Manual Automatic Manifold Page 6 of 14

2 INSTALLATION The ESM is supplied with all internal electrical connections pre-wired. The only external wiring required for the installation is the connection of the ESM pressure switch (if required) to the automatic manifold. All regulators and pressure sensors are preset and no further adjustment of these settings should be required. 2.1 Mechanical (a) Secure the ESM header rack to the wall using suitable fixings at the height indicated in figure 2.3. (b) Install the outlet stub pipe, pressure relief valve and isolation valve. (c) Install the exhaust pipeline from the pressure relief valve to a safe external location. (d) Install all tailpipes onto the manifold headers. (e) Check and tighten all mechanical joints. (f) Connect cylinders, pressurise the manifold and check for leaks. Make sure that the isolation valve is closed if the connection to the distribution pipeline has been made. 2.2 Electrical (a) Remove the fascia from the termination box mounted on the header rack. (b) Connect the emergency standby manifold (ESM) pressure switch into terminals 1 and 2 of CON1 on the monitoring and status panel PCB on the auto gas manifold. Refer to figure 2.4. O&M Manual Automatic Manifold Page 7 of 14

2.3 Installation Drawing O&M Manual Automatic Manifold Page 8 of 14

2.4 Electrical Schematic Diagram 3 TESTING 3.1 GENERAL Prior to testing the manifold installation, please check the following. (a) All components have been installed are tightened. (b) The mains power supply has been installed and power is available. (c) The isolation valves on the automatic manifold and ESM are closed. (d) Full cylinders have been fitted to all tailpipes. 3.2 TESTING (a) Slowly open one cylinder on each bank and allow the system to pressurise. (b) Check all tailpipes and joints for leaks. (c) Close the cylinders. Create a leak between the regulator and the distribution pipeline and very slowly depressurise the system. O&M Manual Automatic Manifold Page 9 of 14

(d) At the setting of the ESM pressure switch, the RESERVE LOW indicator on the automatic manifold control panel will illuminate. (e) If any pressure settings differ from those as stated in table 2.5, adjust as necessary. 3.3 COMMISSIONING Demonstrate the manifold installation to the client by repeating the above-mentioned test procedure. It is advisable to confirm that a central alarm system (if available) is operating correctly at the same time. The manifold must not be used until all testing & commissioning procedures for the pipeline system as detailed in HTM 2022 have been satisfactorily completed and accepted. 4 MAINTENANCE Maintenance of the manifold should be restricted to periodic checking and adjustment and if necessary the replacement of faulty components. It should be noted that although many of the components appear to be standard items, many have been selected and treated to make them suitable for the gases carried and the pressures involved. 5 PREVENTATIVE MAINTENANCE Regular inspections and maintenance of the manifold will prolong it s life and reduce the possibility of sudden, inconvenient component failures. Manifolds should be subjected to regular inspection and testing as detailed below. Monthly; (a) (b) (c) Visually inspect the manifold for signs of damage. Check all mechanical joints for leaks. Check that cylinders connected are full. O&M Manual Automatic Manifold Page 10 of 14

Annually; (a) Visually inspect the manifold system for signs of damage. (b) Check that one bank of cylinders on the ESM is open ready for use. (c) Check all mechanical joints for leaks. (d) Test the manifold system as detailed in section 5.2 to confirm correct operation. (e) Observe that all indicators are working correctly. All maintenance should be carried out with the knowledge of the hospital engineer and in accordance with the Permit-to-Work system. 6 SPARE PARTS When ordering spare parts, please quote the batch number of the equipment and a description of the component required to ensure that you receive the component that you require! 7 WARRANTY The CPX Emergency Standby manifolds comes with a 12 month warranty from day if shipment. Within this period Precision UK will repair, replace any part on site, or at the factory, which is proven defective at Precision UK s cost. Furthermore, Precision UK will warrant its materials to be free from defects for an additional period of four (4) years (five (5) in total from date of shipment).within this period Precision UK will replace any part, at no charge, which is proven to be defective. Shipping cost after the first twelve (12) months will be borne by the customer. This warranty is valid when the product has been properly installed according to Precision UK s specifications, used in a normal manner and serviced according to the factory recommendations. It does not cover failure due to damage which occurs in shipments or failures which resulted from accidents, misuse, abuse, neglect, mishandling, alteration, misapplication or damage that may be attributable to acts of god. Precision UK shall not be liable for incidental or consequential damages resulting from the use of this equipment. O&M Manual Automatic Manifold Page 11 of 14

8 CONTACT US CPX Technology Building, Pepper Road, Hazel Grove, Stockport, Cheshire, SK7 5BW, UK Tel: +44 (0) 161 487 2822 Fax: +44 (0) 161 487 2816 Email: info@precisionuk.co.uk O&M Manual Automatic Manifold Page 12 of 14

9 REGULATORY REQUIREMENTS The following British, European and International Standards have been consulted during the design, manufacture and testing of the bed head unit. BS EN 1441:1998 Medical Devices. Risk Analysis. BS EN 13348:2001 Copper and copper alloys. Seamless round copper tubes for medical gases or vacuum. BS EN 1044:1999 Brazing. Filler metals. BS EN 980:1997 Graphical symbols for use in the labelling of medical devices. BS EN 1089:3:1997 Transportable gas cylinders. Gas cylinder identification (excluding LPG). Colour coding. ISO 7396-1 Medical gas pipeline systems. Pipeline systems for compressed medical gases and vacuum. ISO 7396-2 Medical gas pipeline systems. Anaesthetic gas scavenging disposal systems. ISO 11197:2004 Medical Supply Units. BS EN 60601-1 Medical electrical equipment general requirements for basic safety and essential performance. BS EN 60601-1-2 Medical electrical equipment general requirements for basic safety and essential performance collateral standards electromagnetic compatibility. ISO 32 Gas cylinders for medical use. Marking for identification of content. ISO 554 Standard atmospheres for conditioning and/or testing. Specifications. SS 01 91 02 Colour atlas. HTM08-03 Health Technical Memorandum Bedhead Services HTM 2022 Medical gas pipeline systems. Design, installation, validation and verification. HTM 02-01 Medical gas pipeline systems. Design, installation, validation and verification C11 NHS model engineering specification medical gases. O&M Manual Automatic Manifold Page 13 of 14

Appendix A: Operations & Maintenance Manual Approval The undersigned acknowledge they have reviewed the automatic manifold Installation, Operations & Maintenance Manual and agree with the approach it presents. Changes to this Operations & Maintenance Manual will be coordinated with and approved by the undersigned or their designated representatives. Signature: Print Name: Title: Role: Date: Signature: Print Name: Title: Role: Date: Signature: Print Name: Title: Role: Date: O&M Manual Automatic Manifold Page 14 of 14