[Type here] MANAGEMENT OF X-RAY GENERATING EQUIPMENT

HEALTH AND SAFETY SERVICES

Local Rules for Radiography: Ionising Radiation Regulations Working Instructions Staff MUST Follow

UNIVERSITY OF EDINBURGH GENERIC RISK ASSESSMENT - RADIATION RP/RA8 - WORK WITH X-RAY FLUORESCENCE ANALYSERS

MANAGING INDUSTRIAL SITE RADIOGRAPHY WORK

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

Reviewed: DD Month Management of Closed Radioactive Sources

PLANT/EQUIPMENT/ASSET HAZARD REPORT

Justification and use of hand-held X-ray equipment

Defective Fixed Signals - Rules 1 to 6

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

University of Cambridge - Safety Office. Radioactive Substances (Unsealed Sources) Audit - complete checklist

Control of Hazardous Energy Program (LOTO)

Lifting Operation & Lifting Equipment Procedure

This document provides guidance to conducting health and safety inspections at the University, to ensure Hazards are identified and controlled.

PLANT/EQUIPMENT/ASSET HAZARD REPORT

Cylinder Filling and Evacuation Procedures

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

Safety Manual: Hazardous Energy. January, 2017


PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

Radiation Safety Program Manual Part 3 Cyclotron - Isotope Production

Risk Assessment Form Cardiff School of Biosciences

Meuangvang Development Co.LTD Standard Working Procedure 058 Use of Hydraulic Torqueing Devices

MIT Analytical X-Ray Safety Policies and Procedures

TRUST POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH. Version: 4 Status: Final Author: Edward Braisher Job Title Health & Safety Manager

Departmental Laser Safety Audit Checklist

PRO Lifting Operations

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Risk Assessment June Skirmish Paintball Games Exeter

Policy Redesign Project. Plant Safety Policy. Table of Contents

Health & Safety Policy & Plan. Rightway Roofing.

Hazardous Waste Training Plan. Supersedes: 02/15/16 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

WORKING WITH IONISING RADIATION

230-LOCKOUT/TAGOUT PROGRAM

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

Texas Department of Insurance Division of Workers Compensation. Lockout Tagout HS96-100D (8-06)

Safe Work Method Statement Required for all High Risk Activities identified for the Project

3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals.

Common Discrepancies Uncovered on ADCI Diving Contractor & Training Program Audits

Health and Safety Inspection Procedure

Electrical Hazard Testing Procedure

SG33KTL-M Quick Installation Guide. 1 Unpacking and Inspection

Lockout/Tagout Plan Environmental Health & Safety Office July 2017

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

HAZARD IDENTIFICATION & RISK ASSESSMENT

DEPARTMENT OF CHEMISTY, PHYSICS AND GEOLOGY RADIATION SAFETY PLAN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

Nuclear Associates

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Fencing your spa or swimming pool

Hampstead Hill School Health and Safety Policy: Confined Spaces

OKLAHOMA CITY COMMUNITY COLLEGE PERSONAL PROTECTIVE EQUIPMENT PROGRAM. Environmental Health and Safety

WADKIN OVER HEAD ROUTER RISK ASSESSMENT (U002ra)

STANDARD OPERATING PROCEDURE

SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT

Issue: Issued By: Environment, Health & Safety Part: Hazard Identification and Assessment Revision #: 2 Revision

Fencing your spa or swimming pool

SECTION 2 SMART PAYOUT MANUAL SET FIELD SERVICE MANUAL

Hazardous Energies Control and Lockout/Tagout Program

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

Standard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation

Risk Assessment for: Roaches Pyrotec dyeing machines

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

PSSI 1 High Voltage Switching

Risk Assessment for: Fume cupboards

Grantek Systems Integration

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

LOCKOUT-TAGOUT PROGRAM

Guidance on the Ionising Radiations Regulations 1999 (IRR99)

LOCKOUT/TAGOUT PROGRAM

Electrical Safety. Hazard Awareness

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

LO/TO LOCKOUT/TAGOUT PROGRAM

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

Key Technology, Inc. Confined Space Entry Program. July, 2017

General Requirements for Personal Protective Equipment

4.1 The Vice-Chancellor and University Executive Committee

Electrical Safety Program

Ground Fault Circuit Interrupter(GFCI) Policy

Rigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

2. The purpose of this program is to achieve the following objectives:

Portland Community College Facilities Management Services ENERGIZED ELECTRICAL WORK PERMIT AND WORK PLAN

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

Preview to the 2018 NFPA 70E, the Standard for Electrical Safety in the Workplace

Hazardous Energy Control (Lockout-Tagout)

Assessment Checklist. Project. Name: Created: Machine Details. Serial Number: Type: Model: Manufacturer: Power Supply: Location: Building: Area:

SUNY OSWEGO ENVIRONMENTAL HEALTH AND SAFETY

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

Surface exploration drilling

Provision and Use of Work Equipment Regulations Policy (PUWER) March 17

Environmental Health & Safety Programs

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION

Transcription:

University of Aberdeen Ionising Radiation Safety Arrangements APPENDIX 9 X-ray Equipment form Version 1 May 2017 Authorised by Radiation Hazards Sub Committee Appendix 9 Version1 X-Ray form Page 1 of 5 Issued May 2017

X-ray Equipment form University of Aberdeen Audit of engineering controls for equipment that generates X-rays The Ionising Radiation Regulation 1999 requires an employer to ensure that all doses to staff and members of the public are as low as reasonably practicable. This can be achieved in several ways but most commonly by the use of engineering controls, design features and safety interlocks. This form will assess the current practices in place and identify areas where changes should be made. Date of audit Auditor Make: Make, model and serial numbers of equipment audited Model: S/N: Location Contact Person Date of any previous audit Summary of Actions Action Person Responsible Date Completed 1. 2. 3. 4. Appendix 9 Version1 X-Ray form Page 2 of 5 Issued May 2017

1. 2. 3. 4. Equipment Information What is the range of kv and ma available on the unit and what kv and ma settings are typically used? What is the typical scan time? Is the equipment fixed in place or is it mobile/ hand held? Are manuals available for the equipment and where are they kept? What is the maximum number of cycles per hour the unit is capable of? What is the workload / How often is the equipment used? 5. 6. 7. Installation Details When was the equipment installed? Is there a critical examination certificate from the installing company? Has the equipment been moved or reinstalled since its original installation? If yes, do documents exist to confirm that unit has been correctly reassembled? Has leakage been rechecked? Has the equipment been modified in any way? 8. Details of Maintenance arrangements and safety features Is the equipment on a maintenance contract? If yes how often is it inspected? Are maintenance reports issued? When does the contract end? If no who is responsible for Appendix 9 Version1 X-Ray form Page 3 of 5 Issued May 2017

maintenance and who checks safety interlocks are functioning correctly? 9. 10. 11. Details Maintenance arrangements and safety features (cont.) Is the equipment operated with a Key lock? If yes where is the key stored? Is there a key sign out sheet and who supervises this? Is the equipment permanently shielded Can the equipment still be operated if the shielding is removed? What levels of leakage have been recorded during operation? Does the manufacturer specify a minimum distance between the unit and the operator during operation? 12. 13. If yes what is the minimum distance? Does the manufacturer recommend any PPE to be used when operating the unit? Are there warning lights on the equipment or an audible tone when the equipment is in use and are checks made to ensure they are working? 14. 15. 16. Will the equipment operate even if the lights/audible signals have failed? Are there radiation warning signs on the equipment or in the area warning? Are these signs permanently displayed or who is responsible for ensuring the signs are displayed? Detail any other interlocks available on the equipment Are they regularly checked and is there a record that the checks have been performed? If an interlock has been activated does the unit need to be reset before it will operate again? Are there emergency off switches on the equipment and do they operate correctly. Are they tested regularly and are records kept? Appendix 9 Version1 X-Ray form Page 4 of 5 Issued May 2017

17. 18. Details of operator requirements Who is the Supervisor for the area Is there a current risk assessment for the equipment 19. Are Local Rules for the area available? 20. 21. 22. 23. Is there a list of trained operators for the equipment and are training records kept? Are there detailed written procedures for operating the equipment? Are there contingency arrangements detailed in the procedures? Are the contact details of the service listed in the procedures? Is there a fault book for the equipment? Plan of area and dose rate measurements Appendix 9 Version1 X-Ray form Page 5 of 5 Issued May 2017