Landing Skeg Installation

Similar documents
Akcent-2 - Building Instructions

TABLE OF CONTENTS FRAME FEATURES INTRODUCTION

WHITE WOLF. X-ray View MID POWER MODEL ROCKET KIT BUILDING INSTRUCTIONS KIT SPECIFICATIONS:

R3 RIM MANUAL EN. Version 1 I

R5 RIM MANUAL EN. Version 1 I

AGM 33 PIKE ALL FIBERGLASS. Specifications Length: 92 Diameter 5.5 Weight: 24 lbs Motor Mount: 75mm Fins: 6-3/16 G10 CP: 68 from nose tip Parts List

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION. A guide to your Cervélo C Series frame.

AVA Building Instructions

FRAME FEATURES TABLE OF CONTENTS INTRODUCTION

aero naut Electric Model Aeroplane Quido Order-No. 1303/00

General Build Instructions for Mach 1 BT50 and BT55 Single Fin Kits. Needed Items for Assembly

TABLE OF CONTENTS INTRODUCTION

Model Aero AT-6 Texan Introduction

Model Aero Sportster Indroduction

Building Instructions ME 163 B 1a M 1:5 Turbine

TOURNAMENT ICE. 8Ft-Gold Standard Manual Score Home Air Hockey Game Assembly Instructions / Manual

Hat s off to you for choosing a kit from Port Townsend Watercraft.

VALDIVIA BUILD LOG Dr Ron

Instructions for Fun Foam Critter 4/25/2007 BP Hobbies LLC 140 Ethel Road W Suite J Piscataway NJ,

DIY Shallow Water Anchor Assembly Instructions for Rods, T-grips, Stainless Tips, Stainless Couplers, and the 4-in-1 Paddle

Aegea Assembly Notes:

5. Tailplane assembly

Methylethycetone (MEC) - PMS 60 polyurethane glue - Grease - White silicone

Kari-Tek. Kari-Tek. Hydro Skeg Retro-Fitting Instructions. Instructions for retro-fitting of Hydro Skeg

BUIDLING INSTRUCTION GLIDER MINI-RACE. MINI-Race building instruction January

R5 DISC MANUAL EN. Version 1 I

How Scott Builds a Fighter Kite, May 2011 Updated Sept 2018

Main Wing Wood Parts

Horizontal Fuselage. Top Vertical Fuselage 1. Lay out the Top Vertical Fuse Front(1), Top Vertical Fuse Back(2), and Vertical Stabilizer(3).

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

Constitution Instructions

ANGEL 2000 glider ARF ASSEMBLY MANUAL. Specifications: MS: 129

Detail. Added Details for the Boiler and Smoke Box

Release :

Hip Block Installation Instructions:

On the Wing... By Bill & Bunny Kuhlman,

ANATOMY OF FUSELAGE REPAIRS

Trogear Bowsprit Through Hull Installation Manual

Appendix 1: How To Install the Northeaster Dory Sailing Component Kit Upgrade

BUILDING INSTRUCTION Glider TASER unplugged. Taser unplugged Building instruction September

Dornier Do R 4 Super-Wal

SPECIAL THANKS TO THE FOLLOWING PEOPLE FOR THEIR HELP IN THIS PROJECT!

Star 45 Short Kit Build by Bob Szczepanski

Deluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.

Little Dog Dual Deploy

L-23 Super Blanik Rigging (assembly/disassembly) Guide Maj Carl Kerns

BUILDING INSTRUCTIONS

Fin Shape Science Experiment Kit

OWNER S MANUAL ALWAYS WEAR A GOVERNMENT APPROVED FLOATATION DEVICE WHEN FISHING. Know the limits of your ability and the limits of your equipment.

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

Appendix A Supplement: Selected Epoxy Techniques

Vacuum Bagging Wings Instruction Manual Purdue University

8-GUN CORVETTE ASSEMBLY INSTRUCTIONS

SEADUCER BOATS GAS SPORT HYDRO

Final Assembly Instructions Bikes with 16 Wheel Size

Pitts Model 12 Wing Leading edge Installation

Blazer Marine, Whiplash Sport 40

V-Tail Flamingo. Included in Kit * Pre- cut balsa parts * Ballast weights * Diagram sheet * Sandpaper sheet

Tugster. Tug Boat. Competition or Sport Tug Kit. A Zippkits R/C Boat. Building Instructions

Max Bee. Part II: Building Max Bee Stunt News 8. lighter: the building of Max. all published.

FlyingFoam Nurf. General Assembly Instructions

Panoptix PS51-TH FrontVü/LiveVü Thruhull

1/10 th Scale 1956 Ted Jones Classic Hydroplane

Contents. Stainless Steel Side Block. 1.1 Separating the Side Block. Stainless Steel Side Block Reassembly of. Assembly from the Helmet Shell

Installation Guide, MPower Echelon Console

18. Tailplane torque-tube

Trixie 7. Study Plans. for a 7' 2" x 4' 6" Tender. Andrew Walters. For Rowing, Sail and Short Shaft Outboard Motors

-Round Down- Description & Overview. VEX Classroom Competition Round Down

PT 11 trouble-shooting and maintenance.

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

Yes! It s the very first one with me holding it! Top picture is the incredible Greg Dakin flying another prototype (Photo from Kevin Newton)

SCOUT DECK ANCHOR 3 1/4" BONDING SCREW

Sideshift SS230 Installation on a 2006 Bayliner 265SB

MICRO - DLG. This kit should only take 30 minutes to compile, very simple and quick.

Service Bulletin 70. Subject: Vertical fin cracks. Applicability: All Sportsman aircraft

Carving a Custom Seat

How to Make a Unique Industrial-Looking PVC Lamp

Your kit contains the following items. Additional Items You May Need. Pre- cut parts Propeller rigging and rubber Sandpaper Covering sheet

Bladerider X8 Assembly Help Notes

Agilent 1290 Infinity Pump Head Maintenance

PREPARATION & APPLICATION OF S1125 ADHESIVES

SLR Missile Thunderboat

INSTALLING YOUR CLC RUDDER

POP UP ANCHOR. Part Number Spectrum Lane ~ Missoula MT ~

L.Ph. Bolander & Sons 1355 Evans Ave. 800/

Rocket Report By: Riley LeMont. Jefferson Starship. January 22, Name Nomiddlename Lastname

RBI Solar One-Piece Ground Mount Solution GM-GS

Super Sport. Building Instructions Z I P P M A N U FA C T U R I N G. A Zippkits RC Boat. 46 inch Gas Mono Hull

The author's TD Coupe, used as a towplane, and the Airhopper. The gas model is equipped with an automatic towline release.

1 of 6 16/8/18, 6:07 pm

photo PFBC file photo

BOW DRAW WEIGHT ADJUSTED WEIGHT CHART

Soling Building Tips II

ST Shimano Total Integration. Technical Service Instructions. General Safety Information SI-6CT0B

CARL GOLDBERG PRODUCTS, LTD. P.O. Box 818 Oakwood GA Phone # Fax #

aero naut Order No. 3009/00

Last Revised 3/17/15 RMRC Mako

In each step, the needed parts are shown the number right below. Locate all parts for the step.

CONSTRUCTOPEDIA NXT Kit 9797

Log Balance Beam. Product: (4 ), (6 )

Transcription:

2010 Landing Skeg Installation Version 1.1 Kennedy Composites 4/22/2010

Kennedy Composites What is a Landing Skeg: A landing Skeg is a plastic cleat installed into the bottom-side at the frontend of a sailplane fuselage to provide the ability to stop a sailplane from sliding along the ground upon landing. Installed Landing Skeg What the Landing Skeg Installation Kit includes: Skeg mounting bracket. Removable Skeg cleat Mounting bracket installation tool Installation instructions (This document) skeg mounting bracket installation tool Contents of Landing Skeg Kit Tools and materials required for installation: Dremel style tool with cutting wheel bit - to cut slot in the bottom of the fuselage for the skeg 15-minute 2-part epoxy - for gluing the skeg mount inside the fuselage Colloidal Silica or Micro-Ballons - epoxy thickening agent Popsicle stick or scrap piece of wood - for positioning the skeg mount inside the fuselage Landing Skeg Installation Instructions Page 2 of 6 DFriant

Installation Procedure Overview: The skeg mounting bracket is installed inside the front of the fuselage. A slot is cut in the outside of the fuselage to allow the skeg to be inserted into the mounting bracket. 1. In order to determine the exact location of where to cut the slot in the fuselage, temporarily position the mounting bracket inside the front of the fuselage and mark the location of the slot on the outside of the fuselage. a. To position the mounting bracket inside the fuselage temporarily glue the white tubing, included in the skeg kit, to the hole in the skeg body with CA as shown in figure 1. Figure 1: Tubing glued to the end of the mounting bracket b. Hold the end of the white tube and insert the mounting bracket inside the front of the fuselage. 2. Mark the location of the where to cut the slot on the outside of the fuselage, paying careful attention to where the slot is located on the mounting bracket. 3. Using your Dremel tool with cutting wheel carefully cut the slot in the fuselage as shown in figure 2. Test fit the mounting bracket in the front of the fuselage. Adjust the size of the slot if required. a. The slot in the fuselage measures approximately 3mm wide by 25mm long and is positioned in the fuselage as shown. (Location of slot shown is approximate). 3mm x 25mm (approx) Figure 2: Slot cut in the fuselage Landing Skeg Installation Instructions Page 3 of 6 DFriant

4. The skeg mounting bracket is ready to be epoxied inside the front of the fuselage. a. Sand the inside of the fuselage where the mounting bracket will contact the fuselage in order to achieve the best bond possible with the epoxy. b. In order to ensure a solid bond with the epoxy between the fuselage and the mounting bracket, wipe the area that has been sanded with a solvent such as denatured alcohol to remove all dust. 5. Once the area has been sanded and wiped clean, mix ¼ ounce of 15-minute 2-part epoxy to cement the mounting bracket to the inside of the fuselage. Mix Cabosil thickener or micro-balloons with the epoxy to create a putty like consistency. You must coat all areas of the mounting bracket with epoxy putty that will come in contact with the inside of the fuselage. a. Keep in mind that you have only a few minutes to mix the epoxy with microballoons, apply the epoxy, and position the mounting bracket inside the fuselage before the epoxy hardens. This is why 15-minute epoxy is recommended. 6. Apply the epoxy putty to the mounting bracket as shown in figure 3. Ensure that all surfaces of the mounting bracket that will contact the fuselage have plenty of putty applied. Figure 3: Epoxy putty applied to the mounting bracket 7. Immediately insert the mounting bracket into the fuselage by guiding it into position with the white plastic tubing that is still attached to the mounting bracket as shown in figure 4. Figure 4: Mounting bracket being positioned inside the fuselage Landing Skeg Installation Instructions Page 4 of 6 DFriant

8. While holding onto the white plastic tubing to keep the mounting bracket in place, turn the fuselage over and position the mounting bracket to align with the slot cut in the fuselage. Use the popsicle stick to move and position the mounting bracket as needed. See figure 5. Figure 5: Adjusting the mounting bracket through the slot cut in the fuselage 9. Once the mounting bracket is in place and aligned with the slot in the fuselage add more putty to ensure a secure bond between the mounting bracket and the fuselage as shown in figure 6. Figure 6: Mounting bracket cemented in place in the fuselage. 10. Once the epoxy has hardened and the mounting bracket is secured in place, remove the white tubing. 11. If needed, adjust the size of the slot cut in the fuselage to align with the slot in the mounting bracket. 12. Test fit the skeg by snapping it into position in the mounting bracket through the outside of the fuselage. 13. The skeg can be removed by pressing a metal wire, or equivalent, into the hole in the end of the mounting bracket inside the fuselage. Landing Skeg Installation Instructions Page 5 of 6 DFriant

14. When the skeg has been installed correctly your fuselage will look like figure 7. Figure 7: Installed Landing Skeg If you have further questions or would like to purchase more products please contact us at: Kennedy Composites Phone: 972-602-3144 Email: websales@kennedycomposites.com Credits: Copyright Barry Kennedy Photos: Vladimir Gavrilko Design / Layout / Instructions: Dave Friant Kennedy Composites 1935 Highvalley Trail Grand Prarie, TX 75052 Ph: 972-602-3144 Landing Skeg Installation Instructions Page 6 of 6 DFriant