NBIC Committee Action Block

Similar documents
PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

Committee on NFPA 85

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

MSC Guidelines for Pressure Vessels

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

RiskTopics. Lockout/Tagout October 2017

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

RUPTURE HAZARD OF PRESSURE VESSELS

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Procedure: Pressure equipment safety

Steam System Best Practices 14 Best Practices for Guide Lines for Boiler Plant Log Books

AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF. SEMS HAZARD ANALYSIS TRAINING September 29, 2011

Compressed Gases Safety Program

NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA

BSR GPTC Z TR GM References and Reporting Page 1 of 8

Transport of gas tanks for motor vehicles

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

PRESSURE RELIEF DEVICES. Table of Contents

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

NATIONAL BOARD SUBCOMMITTEE ON PRESSURE RELIEF DEVICES. Meeting of January 21, 2015 Orlando, FL

Liquefied gas cargo tanks and process pressure vessels

GAS SAFETY Information Bulletin

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

Australian/New Zealand Standard

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Relief Device Investigation Testing Lessons Learned

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

Subpart E. Pressure Testing

Gettysburg College. Energy Control Program

Confined Space Policy

5.0 INSPECTING, FILLING AND LABELING SMALL CYLINDERS

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

MSC Guidelines for Independent Fuel Tanks

Notice for Pressure Special Equipment Manufacture Licensing

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP 7218 (NINETEENTH REVISION)

LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Pressure Systems Safety Regulation

SAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.

This written Compressed Gas Plan is kept at the corporate office and in the written Safety & Health Program.

Public Comment No. 2-NFPA [ Section No ]

MSC Guidelines for Gas Carrier Barge Cargo Authority Procedure Number: C1-41 Revision Date: January 27, 2012

Committee Input No. 59-NFPA [ Section No. 5.9 ]

PART Q CONTROL OF HAZARDOUS ENERGY (LOCKOUT-TAGOUT)

49 CFR 195 Regulatory Overview

DUQUESNE UNIVERSITY LOCKOUT/TAGOUT PROGRAM

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)

Inspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement

230-LOCKOUT/TAGOUT PROGRAM

MSC Guidelines for Compressed Air Systems

API-510 PRESSURE VESSEL INSPECTOR

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

PIP PNE00012 Piping Examination and Leak Test Guide

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TENTH REVISION)

Piped Air SCBA Refilling System Standard

CONTROL OF HAZARDOUS ENERGY IN THE WORKPLACE

BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION

LO/TO LOCKOUT/TAGOUT PROGRAM

Transport of gas tanks for motor vehicles

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

Management Plan for Compressed Gas

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

Pressure Equipment Directive (PED) Directive 97/23/EC. Pressure Equipment (PED) --- Baltic Pressure Equipment Workshop Riga, November 2003

COMMITTEE DRAFT. API 520 Part I 10 th Edition Ballot Item 2.1. This ballot covers the following item:

FV Flash Vessel Installation and Maintenance Instructions

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (FOURTH REVISION)

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

SOP #: Pressure Vessels

Management Plan for Electrical Safety ISD #535

AUTHORITY AND PURPOSE

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Compressed Gases and Cryogens

High-Pressure Boiler Inspection Procedures: A Complete Checklist

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

FUNDAMENTALS OF PRESSURE RELIEF VALVES IN NATURAL GAS INSTALLATION - OPERATION - MAINTENANCE. Gary S. Beckett

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

COMMERCIAL ITEM DESCRIPTION NITROGEN, TECHNICAL

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

SAFETY FEATURES OF PORTABLE CRYOGENIC LIQUID CONTAINERS FOR INDUSTRIAL AND MEDICAL GASES

Significant Change to Dairy Heat Treatment Equipment and Systems

ISO INTERNATIONAL STANDARD. Gas cylinders Safe handling. Bouteilles à gaz Sécurité de manutention. Second edition

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015

Event Time Event Name Meeting Room Sunday, January Monday, January

ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah

THE UNIVERSITY OF NORTH CAROLINA

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

ST/SG/AC.10/C.3/2016/8. Secretariat. United Nations. Transport of gas tanks for motor vehicles. Introduction

ROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (EIGHTEENTH REVISION)

An Urgent Bulletin from CSA Group

Continental Industries TRANSITION FITTINGS or FAX Visit

SERIES SAFETY VALVE

Transcription:

NBIC Committee Action Block Subject File Number Change of Service NB 08 0321 (Inspec) NB 08 0320 (Install) NB 08 0322 (R & A) Prop. on Pg. Proposal Explanation Part 2: Add a new Supplement 9, Requirements for Change of Service, and add a new paragraph 1.6 that includes a reference to Supplement 9 Part 1: Add a new paragraph 1.5 that makes reference to Part 2, Supplement 9 Part 3: Add a new paragraph 3.2.7 that makes reference to Part 2, Supplement 9. Various segments of business and industry that utilize boilers and pressure vessels face issues where the functional aspects or purpose of the equipment have changed. Sometimes due to economics existing vessels are subject to new environments, usage, or different commodities. There are several standards in place that may have specific rules for specific change conditions to vessels. And some may even prohibit the operation of vessels with certain commodities. For example, NFPA 58 prohibits the use of anhydrous ammonia in vessels that have been manufactured for propane, or 49 CFR prohibits using DOT railway cars in stationary service after they have served their usefulness. These may be severe or extreme cases. But there are many other situations that could cause peril that are not so obvious. And further, there is no single document that would provide advice to users of the risks associated with changing the service environment without making a thorough review or evaluation of the effects on the equipment. So, this addition to the NBIC is intended to provide that needed guidance to boiler and pressure vessel users. This supplement includes general advice, some of the criteria to be evaluated, and a few examples of what would be considered a change of service condition. June 14, 2013: The proposal was letter balloted for comment purposes only to all Subcommittees. There were 3 technical comments submitted. The comments and responses are as follows: Comment Great document, I would support it. Only one comment. Maybe I missed something in the details, but it seems there should be a clear requirement for cleaning and/or decontamination of the vessel as appropriate for any change in lading fluids. Richardson,John Response Thanks for the comment. I ll add the comment to S9.3.3.

S9.1, second paragraph Either delete the phrase "when applicable" or move it to the next sentence. S9.3.6.e correct typo changing "of" to "or". Sekely,Jim I reviewed the proposed change of service supplement and agree with the intent and proposed location. I have attached suggested editorial revisions for your consideration. Galanes PE,George S9.1. To avoid any controversy in the field of when it would be applicable or not, I ll just delete the phrase. S9.3.6.e. Good catch. I ll make the change. Agreed to all changes. Thanks for the suggestions. S9.3.2.c add or both effects combined. S9.3.6.e correct typo. of to or. S9.4, 2 nd sentence. Add of the PRI. All changes have been made and are incorporated into revision 7 of the proposal. This final proposal was presented and reviewed by all subcommittees at the July 2013 NBIC meeting. There were additional clarifications recommended by the SC on Inspection (PART 2). Those recommendations have been incorporated into this proposal, revision 8. Project Manager Robert Wielgoszinski Task Group Negatives TG Meeting Date

Part 2 Revision New Supplement 9 Change of Service Rev 8 July 17, 2013 RVW Supplement 9 Requirements for Change of Service S9.1 Scope: This Supplement provides requirements and guidelines to be followed when a change of service or service type is made to a pressure retaining item. Whenever there is a change of service, the local jurisdiction where the pressure retaining item is to be operated shall be notified for acceptance. Any specific jurisdictional requirements shall be met. S9.2 Classification of Service Changes S9.2.1 Service Contents A change in service contents is considered to be any modification to the commodity or contents that the pressure retaining item was originally intended to contain when the pressure retaining item was constructed. For example, a change: a) From LP gas service to Air receiver service. b) From lethal to non lethal service. S9.2.2 Service Type or Change of Usage A change in service type is considered to be a change of how the pressure retaining item is being used. For example, a change: a) From above ground service to underground service for LP gas tanks. b) From mobile or transport use to stationary use S9.3 Factors to Consider Before a change of service is to be made, the owner or user shall consider and evaluate the effects of the new operating conditions or environment on the existing condition and suitability for service of the pressure retaining item. Various factors will have an impact on the reliability of the pressure retaining

Change of Service Rev 8 July 17, 2013 RVW item in its new service environment. Changes can be successfully adopted providing there is an understanding of the effect on the pressure retaining item. However, there are some cases where changes are detrimental to the existing pressure retaining item. The owner or user should seek technical guidance of experienced personnel in appropriate areas affected by the change of service (e.g. design, metallurgy, or operations of the pressure retaining item). The following is a listing of criteria that should be evaluated as appropriate. The criterion is not limited to that listed herein. Other factors may be considered as necessary; 1) Design Consideration: a) Thickness of existing vessel material b) Vessel or system flow rate or pressure c) Weight of vessel with new contents d) Existing or additional loads imposed on nozzles and highly stressed areas e) Change in pressure or temperature, and cycling f) Compliance to product or industry standards, such as ANSI K61, API 579, or NFPA 58 2) Material Consideration: a) Chemical and mechanical properties of existing material or any new material to be added or replaced to assure it has the required strength and toughness to withstand the pressure and temperature effects of the new environment. b) Effects of erosion or corrosion c) Time dependent effects on service life creep or fatigue, or both effects combined. 3) Environment a) Physical condition of the pressure retaining item b) Overpressure protection needs c) Regulatory environment Verification of compliance to new or existing jurisdictional rules or regulations. d) Vessel cleanliness When changing lading fluids or contents consideration should be given to cleaning or decontaminating the vessel as appropriate. 4) Operational History a) A review of current and past operational logs or records should be made to assure that no conditions existed where any further use would render the pressure retaining item hazardous or otherwise unsafe. b) Records to be obtained and reviewed would include Data Reports, Repair and Alteration Forms, Inspection reports, etc.

Change of Service Rev 8 July 17, 2013 RVW 5) Repairs and Alterations Made: a) A review of any repairs, alterations, reratings, or reconfigurations that have been performed on the pressure retaining item, so as to assure that they will not have a detrimental impact on the intended use. 6) Proposed rework a) Any physical work to be performed to restore the material to the existing or intended state or to meet any requirements for the new operating conditions. b) Repairs and alterations shall be performed in accordance with NBIC, Part 3. c) The effects of heat applied as a result of welding or heat treatment on the material or shaped parts. d) The method and extent of any physical or non destructive examination should be considered. e) Any physical testing or pressure testing to be performed to determine or verify leak tightness or structural integrity of the pressure retaining item. f) The pressure retaining item shall meet the Code requirements for the new environment at the time of change. 7) Documentation a) Review existing records that are required to satisfy customer, user, or legal requirements. b) Review the need for any marking, stamping, or labeling required for the intended service. c) Review the need for developing or revising an inspection plan to ensure safe operation. Refer to Part 2, Section 1.5.2.1 Inspection Plan. S9.4 Some Examples for Change of Service The following is a typical list of examples of what constitutes a change in service and some factors to consider. Note: This list is not all inclusive. There may be other service changes not mentioned. The listing of Factors to Consider is also not all inclusive. There may be other elements that can influence the safe and reliable operation of the pressure retaining item. The Owner shall check with the Jurisdiction where the pressure retaining item is to operate in the new environment, and review local building Codes, laws, and regulations for additional requirements or prohibitions against a change of service. Some examples of Change of Service conditions Change Some Factors to Consider LP gas to ammonia PWHT of vessel during construction

Change of Service Rev 8 July 17, 2013 RVW Some examples of Change of Service conditions Change Some Factors to Consider Wet fluorescent magnetic particle testing (WFMT) on all internal surfaces Internal access of vessel is necessary. May need to install manhole. NFPA 58 should be consulted Ammonia to LP gas NFPA 58, should be consulted. i.e. restriction on maximum volume Wet fluorescent magnetic particle testing (WFMT) on all internal surfaces Internal access of vessel is necessary. May need to install manhole. Also see, NBIC Part 2, 2.3.6.4 LP gas service: from above Requires alterations (additional nozzles). ground to underground Corrosion protection See NFPA 58 LP gas to air receiver Assurance of vessel cleanliness. i.e. removal of mercaptan. Appropriateness and number of inspection and drain openings. Boiler service: Steam to Hot Water Corrosion allowance Nozzles may require modification for water inlet and outlet Change of Pressure Relief Device Boiler Service: High Pressure to Low Pressure Sulfur dioxide service. Sweet to sour gas service. Controls required by the LP boiler Code Safety valve change Need for larger openings for steam outlets and safety relief valves Concern over hydrogen cracking Inert to Oxidizing or Reducing atmosphere Inspection for damage mechanisms that may be present from previous service life that is detrimental to the vessel in the new environment. Cleanliness of hydrocarbons Lethal service to non lethal Design conditions and suitability for service

Change of Service Rev 8 July 17, 2013 RVW Some examples of Change of Service conditions Change Some Factors to Consider DOT railcars or ICC transport tanks to stationary service Prohibited by DOT regulations for permanent service. Temporary stationary service permitted as per NFPA 58 Inspection for damage mechanisms that may be present from previous service life that is detrimental to the vessel in the new environment. S9.5 Documentation of Change of Service Any records, forms, or reports required documenting the change of service event that may be required by contract or the jurisdiction where the pressure retaining item operates shall be completed. Such documentation should be retained by the owner or user for future reference or use as needed.

Page 6 of 9

Page 7 of 9

Page 8 of 9

Page 9 of 9