POPULATION COUNTS OF ADULT STEELHEAD AT LOS PADRES AND SAN CLEMENTE DAMS

Similar documents
TREND ANALYSIS FOR JUVENILE AND ADULT STEELHEAD

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

California Steelhead: Management, Monitoring and Recovery Efforts

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in 2010

California Steelhead: Management, Monitoring and Recovery Efforts

Executive Summary. Map 1. The Santa Clara River watershed with topography.

LIFE HISTORY DIVERSITY AND RESILIENCE

Eulachon: State of the Science and Science to Policy Forum

LOWER MOKELUMNE RIVER UPSTREAM FISH MIGRATION MONITORING Conducted at Woodbridge Irrigation District Dam August 2014 through July 2015.

2 Genetic Evaluation of O. mykiss from Alameda Creek Watershed

Personnel Benchmarking Author: Ed Rehkopf

Interlake Tunnel WRA Board Workshop. August 25, 2014

2007 LOWER TUOLUMNE RIVER ANNUAL REPORT

Environmental Protection of the Carmel River

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest

Summer Steelhead Surveys North Fork Trinity River Trinity County, California

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Upper Yuba River Watershed Chinook Salmon and Steelhead Habitat Assessment

Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist

2015 DRAFT SUMMARY REPORT Juvenile Steelhead Densities in the San Lorenzo, Soquel, Aptos and Corralitos Watersheds, Santa Cruz County, CA

Reintroduction of Pacific lamprey in the Umatilla River in Northeast Oregon

Monitoring of Downstream Fish Passage at Cougar Dam in the South Fork McKenzie River, Oregon February 8, By Greg A.

Upper Columbia Redband Trout: Conservation for the Future

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Historical Distribution and Current Status of Steelhead/Rainbow Trout (Oncorhynchus mykiss) in Streams of the San Francisco Estuary, California

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

The effects of mainstem flow, water velocity and spill on salmon and steelhead populations of the Columbia River

Steelhead/rainbow trout resources of San Luis Obispo County

Current Status and Future. Hudson River American shad stock. New York State Dept. of Environmental Conservation

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Searsville Dam Removal

Follow this and additional works at:

Annual Meeting June 17, Research Stewardship Education

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Spring Chinook Salmon in the Chehalis River. Mara S. Zimmerman Chehalis Basin ASRP Science Symposium September 19, 2018

Study 9.5 Fish Distribution and Abundance in the Upper Susitna River

The. Plain Facts. What s happening on the Deschutes River

Juvenile Steelhead and Stream Habitat Conditions Steelhead and Coho Salmon Life History Prepared by: DW ALLEY & Associates, Fishery Consultant

EVALUATION OF SEA LION PREDATION IN THE BONNEVILLE DAM TAILRACE

Presented to Idaho Washington Aquifer Collaborative February 11, Spokane River Project License

Up Your Creek! The electronic newsletter of the Alameda Creek Alliance

2011 SUMMARY REPORT Juvenile Steelhead Densities in the San Lorenzo, Soquel, Aptos and Corralitos Watersheds, Santa Cruz County, CA

Proportion of adult steelhead passing Lower Granite Dam during nighttime noncounting

Prospect No. 3 Hydroelectric Project FERC Project No. P Fish Passage Facilities Study Report: Biological Evaluation

CUSHMAN RESERVOIRS. Skokomish Watershed Monitoring Conference - Public Meeting Florian Leischner 9/17/2015

Southern Oregon Coastal Cutthroat Trout

Coquitlam/Buntzen Project Water Use Plan

Prepared For the. Santa Cruz County Environmental Health Department Government Center, 701 Ocean Street, Room 312, Santa Cruz, CA 95060

A report for Project ADS M.L. Keefer and C.A. Peery Idaho Cooperative Fish and Wildlife Research Unit University of Idaho, Moscow, ID

Water budgets of the two Olentangy River experimental wetlands in 2001

Appendix G Whitewater Recreation Flow Study Plan

Annex C Temporary Fish Passage Plan

Backgrounder and Frequently Asked Questions

Notice of Proposed Rulemaking. Title 58. Recreation Part II. Fish and Boat Commission Chapter 65 Special Fishing Regulations.

Okanagan Sockeye Reintroduction

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Downstream Migrant Trapping in Russian River Mainstem, Tributaries, and Estuary

Abel Tasman Birdsong Trust Trapping Report March 2017

P.O. Box 65 Hancock, Michigan USA fax

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

SONAR ESTIMATION OF ADULT STEELHEAD: VARIOUS METHODS TO ACCOUNT FOR KELTS IN DETERMINING TOTAL ESCAPEMENT

Niall Gauld Durham University

Study Update Fish Distribution and Species Composition

Session D5: Using a Waterfall System as a Natural Laboratory to Inform the Design of Fish Passes in the Mekong

Historical Distribution and Current Status of Steelhead/Rainbow Trout (Oncorhynchus mykiss) in Streams of the San Francisco Estuary, California

Fisheries Aide Intern with the Monterey Peninsula Water Management District. Kenneth Norberg. California State University Monterey Bay

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

Dave Clugston U.S. Army, Corps of Engineers, Portland District. Tami Clabough, Eric Johnson, Dan Joosten, and Chris Peery

The California Department of Fish & Game (D.F.G.) files indicate Big. Sulphur Creek has historically been a problem area as far as fish are

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT

CHAPTER 2 - THE COQUILLE FISHERY

COLUMBIA LAKE DAM REMOVAL PROJECT

Subject: Developed fish ladder alternatives for Pastori Avenue at San Anselmo Creek

***Please Note*** April 3, Dear advisory committee members:

Job 1. Title: Estimate abundance of juvenile trout and salmon.

Dave Clugston U.S. Army, Corps of Engineers, Portland District. Tami Clabough, Eric Johnson, Dan Joosten, and Chris Peery

Platte River State Fish Hatchery Summary of 2012 Production and Operational Activities

FISH PASSAGE CENTER 847 NE 19 th Avenue, #250, Portland, OR Phone: (503) Fax: (503) us at

Albeni Falls Dam Downstream Water Temperature Study Interim Results

Within Phase I, researchers have identified four tasks that they think are essential for designing the most informative study.

LOWER YUBA RIVER ACCORD MONITORING ANNUAL ROTARY SCREW TRAPPING REPORT AND EVALUATION PLAN OCTOBER 1, 2008 AUGUST 31, 2009

UPSTREAM FISH PASSAGE 2015 ANNUAL REPORT

BULL TROUT OPERATIONAL PLAN

Confederated Tribes of the Warm Springs Reservation Cyndi Baker Jen Graham

Feasibility and Planning Study

Feather River Fish Hatchery spring run Chinook salmon Program: moving toward conservation. Ryon Kurth, Jason Kindopp, Anna Kastner, and A.J.

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Evaluation of Submerged Orifice Gate Usage by Adult Chinook Salmon and Steelhead at John Day Dam During 2003

Upper Columbia Salmon Restoration: Breakout session: Columbia River Treaty Review Conference Castlegar, BC March 22 nd, 2013

Ocean - estuary coupling. how does FW/estuary history affect ocean traits? (Hatchery rearing strategies)


TECHNICAL MEMORANDUM

Juvenile chum migration patterns in the lower Columbia River and estuary

Timing Estimation of Juvenile Salmonid Migration at Lower Granite Dam

Up Your Creek! The electronic newsletter of the Alameda Creek Alliance

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen

Transcription:

5.5.1.3 POPULATION COUNTS OF ADULT STEELHEAD AT LOS PADRES AND SAN CLEMENTE DAMS Old Carmel Dam Upstream migrating adult steelhead must pass into and through the Carmel Lagoon and move approximately 18.3 miles to reach the first of three dams on the Carmel River. Old Carmel Dam, built in 1881-1883 was originally fitted with a fish ladder to provide fish passage. No records exist of fish passing this dam, which served as a water supply for the Pacific Improvement Company holdings in Carmel and Monterey until 192. San Clemente Dam On reaching San Clemente Dam, adult upstream migrants must climb a 65½-foot high ladder and pass through the existing San Clemente Reservoir. San Clemente Dam, built in 192 by the Del Monte Properties Company (DMPC), originally served as the primary storage and diversion facility for water supplied to the Monterey Peninsula area by DMPC and its successor California-American Water Company. The original plans for San Clemente Dam show the ladder much as it exists today, except that the original design included a series of screened water outlets on the three uppermost bays. A few modifications to the fish ladder have been made over the years, including extension of the lowermost bay to counteract the down-cutting of coarse sediment and water surface below the dam, the addition of submerged orifices at the top of the ladder to help control flow through the ladder, and the addition of an automatic fish counter in 1992 to record the total number of steelhead passing the dam. The first systematic counts of adult steelhead in the Carmel River are reported to have begun in 1962 at San Clemente Dam by personnel from California-American Water Company s predecessor California Telephone and Telegraph Company. Prior to that time, isolated counts of migrating fish were made, but no records exist, except for a report of the first attempted count by the California Department of Fish and Game personnel in 1954. As reported, a trap was operated during the period from February 23 to March 12 with a total count of 162 fish. Additional isolated counts of fish may have been made at San Clemente Dam, but several searches of Cal- Am archives and CDFG records have failed to turn up any additional information. Cal-Am made daily counts at SCD for the 1962 to 1973 period by turning off the ladder flow twice each day and tallying up fish visible in the ladder. Counts made in this fashion are a good annual index of the abundance of fish that historically migrated past San Clemente Dam, but do not represent a true measure of the total number of steelhead passing the dam. In 1974 and 1975 the California Department of Fish and Game Cal-Am installed an automated counter that recorded the total number of migrants. No counts were made during the 1976-1989 period, except for a special 1984 study commissioned by the MPWMD, which included counting fish passing the dam, as well as numbers of fish caught in the river downstream of San Clemente Dam. Beginning in 199, the MPWMD reinitiated the visual counts at San Clemente Dam, and in 1992 constructed an automated counter, which has been in continuous operation since that time. Typically, the counter is installed in November of each migration season, prior arrival of adults from the ocean, and operates through the following May 31 of each migration season. Monthly Counts A summary of monthly and annual counts at San Clemente Dam is provided in the Table 5.5.1.3-A and Figure 5.5.1.3-A, respectively. Section 5.5.1.3 Page 1 of 5 Carmel River Watershed Assessment, 24

Daily Counts Detailed daily counts from the MPWMD fish counter are provided in Appendix 5.5.1.3, in tabular and graphical form. The data includes daily flow estimates at the MPWMD Sleepy Hollow Weir gaging station below the dam, or at the San Clemente Dam spillway. Los Padres Dam Los Padres Dam, built in 1949, is 148 feet high and originally held 3,3 AF. Since that time, approximately ½ of the original capacity has been lost to sedimentation with the current capacity at 1, 569 AF. When it was built, the dam had no fish passage facilities, except for a trap located at the base of the dam. Data from the early trapping program, prior to 1982 are sketchy, at best, with records available for isolated years. A summary of the annual counts is provided in Table 5.5.1.3-A and Figure 5.5.1.3-B. The original trapping station below Los Padres Dam was replaced in 1981, and the replacement was operated for the next 18 years, until 2, when a new trap was constructed along the left bank of the plunge pool below the dam. Since 2, Cal-Am has operated both traps below the dam. Daily trapping records at Los Padres Dam are provided in Appendix 5.5.1.3 with 1995-1999 counts in Adobe Portable Document Format (*.pdf), and the last five years (2-24) in EXCEL spreadsheet format (*.xls). Section 5.5.1.3 Page 2 of 5 Carmel River Watershed Assessment, 24

Table 5.5.1.3-A Historical counts of adult steelhead migrating past San Clemente Dam and of steelhead trapped and passed over Los Padres Dam, 1949-4 NOV DEC MONTHLY COUNTS AT SAN CLEMENTE DAM 4 JAN FEB MAR APR MAY TOTAL Method 1 LOS PADRES (Annual) 1949 no data available 147 195 " 124 1951 " 154 1952 " 86 1953 " 1954 " 162 3 1955 " 1956 " 1957 " 1958 " 1959 " 196 " 1961 " 1962 " 568 VC 558 1963 " 255 VC 8 1964 113 118 327 21 759 VC 1965 23 814 152 181 1,35 VC 257 1966 76 319 451 69 915 VC 1967 546 275 493 1,314 VC 1968 153 93 246 VC 1969 25 818 313 1,336 VC 197 26 51 15 362 VC 1971 244 168 265 92 769 VC 6 1972 77 17 94 VC 1973 39 444 188 1,22 VC 2 1974 16 69 39 224 47 395 AC 3 1975 285 1,2 1,287 AC 9 1976 VC 2 1977 VC 1978 1979 198 1981 1982 no data available 138 1983 no data available 171 1984 1 3 24 289 63 38 AC 51 1985 no data available 27 1986 no data available 42 1987 no data available 1988 1989 199 1991 1 1 VC 1992 3 12 15 VC 5 1993 132 73 65 13 283 VC 26 1994 37 49 5 91 AC 4 1995 39 191 76 4 31 AC 3 1996 8 46 17 188 78 11 438 AC 93 1997 5 61 118 154 34 86 11 775 AC 227 1998 1 44 111 568 129 8 861 AC 122 1999 2 13 126 218 46 45 AC 12 2 34 176 198 59 5 472 AC 24 21 2 39 231 433 95 4 84 AC 347 22 2 21 24 232 298 6 5 642 AC 284 23 8 17 9 141 194 3 3 483 AC 15 24 14 197 163 12 2 388 AC 111 Averages: 1962-75 13 19 151 199 32 4 55 33 96 1997-4 3 279 263 195 14 78 13 19 1949-9 15 47 171 32 65 5 64 7 81 1 Counting Method: VC, visual count; AC, automatic counter. 2 Total counts in 1976, 1977, 1988, 1989 and 199 assumed to be zero for sea-run fish, as no outflow from the lagoon occurred during these years, however a small number of resident-type fish may have migrated upstream past San Clemente Dam. 3 In 1954, count at San Clemente Dam reported for 3-week long period, Feb 23 to March 12, 1954 4 Based on Snider (1983), Dettman (1986), Alley (1994), and California Department of Fish and Game, California-American Water Company, and Monterey Peninsula Water Management District files. The 1962-73 and 1991-93 counts at San Clemente Dam are the sum of daily counts of fish made by shutting off the flow in the ladder. The 1974, 1975, 1984, and 1994-4 data are complete counts registered on an automatic counter as the fish climbed the ladder. 5 The counts at Los Padres Dam for the 1995-24 period exclude small, resident type steelhead, which migrated upstream after maturing in freshwater. Section 5.5.1.3 Page 3 of 5 Carmel River Watershed Assessment, 24

Figure 5.5.1.3-A Historical Counts of Adult Steelhead at San Clemente Dam 1954-24 1,5 759 915 246 94 362 769 31 438 775 91 135 1314 1336 12 1,2 STEELHEAD COUNT 9 6 3 568 255 122 395 38 283 861 84 642 45 472 483 388 162 1 1948 1953 1958 1963 1968 1973 1978 1983 1988 1993 1998 23 15 NOV DEC JAN FEB MAR APR MAY Miscellaneous Section 5.5.1.3 Page 4 of 5 Carmel River Watershed Assessment, 24

Figure 5.5.1.3-B Historical Counts of Adult Steelhead at Los Padres Dam 1949-24 6 558 STEELHEAD COUNT 4 2 147 124 154 86 257 138 171 93 227 122 12 24 347 284 15 111 51 27 42 8 6 2 3 9 1948 1953 1958 1963 1968 1973 1978 1983 1988 1993 1998 23 5 26 4 3 Section 5.5.1.3 Page 5 of 5 Carmel River Watershed Assessment, 24