Tank Continuous Liquid Level Detector

Similar documents
TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

Sensor for Air Bubble Detection at Liquid Filled Tubes. SONOCHECK Type ABD06.xx. Operating Manual

High-performance submersible pressure transmitter For level measurement Model LH-10

What hull material types will the system work on? Do I still need an antifoul paint?

LVU2800 Series. Ultrasonic Level Transmitter

Procedure Troubleshooting the Interconnect Cables

42045 Heavy Duty ADA Base Model Kit: 85/105 PSI (ADA Compressor Only) Heavy Duty ADA Base Model Kit: 110/145 PSI (ADA Compressor Only)

frequently asked questions

Copyright 2004 by the Thomas G. Faria Corporation, Uncasville CT No part of this publication may by reproduced in any form, in an electronic

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Water Level Indicator Project

RAM Operation Manual

400C & 450C DUAL PERFORMANCE VALUE PACKS

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Transmitter CS 21 Operation Manual

ECE 477 Digital Systems Senior Design Project Rev 9/12. User Manual

SCIENTIFIC DATA SYSTEMS, INC. Depth Tension Line Speed Panel. DTLS Manual

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

9408 Series Dissolved Oxygen Systems. Dissolved oxygen systems designed for reliable operation with minimal operating costs

Bubble Tube Installations

ABB MEASUREMENT & ANALYTICS DATA SHEET series Dissolved oxygen systems

INSTALLING THE ECHO SOUNDER TRANSDUCER CHANGING THE OPERATING CONFIGURATION

PROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road

444C DUAL PERFORMANCE VALUE PACK

300C/ 800C/ 990C Plus Series

Stand-Alone Bubble Detection System

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

OC Panel High Limit Aquastat Kit, Manual Reset p/n

660 Multipoint Electronic Level Switch

IEP SENSOR BRACKET CHECKOUT AND VERIFICATION. This is a non-hazardous test.

unconventional-airsoft.com

Ultrasonic level transmitter and indicator

AUTO PUMP STATUS CENTER

Model PSI Compressor with 3-Gallon Air Tank 12VDC

HZ-300 HAZER MACHINE USER MANUAL. Congratulations on the purchase of your new ANTARI HZ-300 Haze Machine.

LS-UT Ultrasonic Level Transmitter

PART 5 - OPTIONS CONTENTS 5.1 SYSTEM EXPANSION 5-3

RAM 4021-DPX Operation Manual

Sweeper Dual Control. Automatic Sweeper Switching System SW SERIES SWEEPERS SW-4815 SW-4820 SW-4825 MAGUIRE PRODUCTS INC.

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

Cover Page for Lab Report Group Portion. Head Losses in Pipes

WELCOME TO THE REVOLUTION

Level MEASUREMENT 1/2016

MODEL WEIGH MODULE

Level transmitters and indicators Series LU Ultrasonic level transmitter and indicator for liquids and solids

USING HAZOP TO IDENTIFY AND MINIMISE HUMAN ERRORS IN OPERATING PROCESS PLANT

Panoptix PS51-TH FrontVü/LiveVü Thruhull

6890 GC Not Ready Messages (A16010)

High-performance submersible pressure transmitter For level measurement Model LH-10

Pre-Paint>Fuselage>Empennage>Fit vertical tail fin. Objectives of this task: Materials and equipment required: Fit the spar extender

ACCURATE PRESSURE MEASUREMENT FOR STEAM TURBINE PERFORMANCE TESTING

DeltaSpan Pressure Transmitters LD10 Series Owner s Manual

Instrumentation & Data Acquisition Systems

Aquavar SOLO 2 Frequently Asked Questions

Exercise 8. Closed-Loop Pressure Control, Proportional-Plus-Integral Mode EXERCISE OBJECTIVE

420C AIR COMPRESSOR KIT PART NO C AIR COMPRESSOR KIT PART NO

E2K-L. Liquid Level Sensor That Is Unaffected by the Color of the Pipe or Liquid. Liquid Level Sensor. Ordering Information

Alimak Lift Control, ALC II User s Manual

ACV-10 Automatic Control Valve

Scoreboard Operator s Instructions MPC Control

The benefits of the extended diagnostics feature. Compact, well-proven, and flexible

Misaligned Folds Paper Feed Problems Double Feeds Won t Feed FLYER Won t Run iii

250C-IG COMPRESSOR KIT 12V PART NO C-IG COMPRESSOR KIT 24V PART NO

Race Screen: Figure 2: Race Screen. Figure 3: Race Screen with Top Bulb Lock

1 Characteristics: 2 Installation: INSTALLATIONguide. inteo SOLIRIS IB

GM Series Dual-Block Multi-Function Gas Control Valves

FOOD INTAKE MONITOR. Hardware and Software User s Manual DOC-047 Rev 3.0. Copyright 2009 All Rights Reserved

Transmitter CS 21 Operation Manual

Autodesk Moldflow Communicator Process settings

Easy to operate even for biginners. Set up the number of test. Possible to select from 1 to times

PositionMaster EDP300 Extended Diagnostics. Compact, well-proven, and flexible

Gas density monitor With integrated transmitter Model GDM-100-TI

200 PSI FAST-FILL AIR SOURCE KIT

200 PSI HIGH-FLOW AIR SOURCE KIT

UsER manual for Watersens ph -REDOX

How to specify a product. Process Sensors and Mechanical Instruments

DIY - PC - Interface for Suunto Cobra/Vyper/Mosquito

FX134, FX1234, FX3030 Problem and Solutions

NIV EAU MATIC ST User Manual Made in Canada

Fiber Cable Puller with Tuf-Lugger lite

UBEC 1AT. AUTO TANK Fill System Installation, Operation, & Setup Instructions

Model 130M Pneumatic Controller

Size Selection & Installation of QSZH-125

200 PSI COMPRESSORS - MODEL NUMBERS

HEATEC TEC-NOTE Publication No Revised

Powermax machine-side reference guide For mechanized applications with Powermax1000, Powermax1250 and Powermax1650

CONDUCTIVITY POINT/S LEVEL SWITCH JAYCEEAQUA 4000 SERIES

Magnetic Tape Installation Straight guide tape, embedded magnetic bar, curve segments HG A

IMPORTANT SAFETY INSTRUCTIONS

100C Air Compressor Kit

Owners Manual Release Date: Thursday, December 29, 2011

ELIMINATOR COMPETITION DRAG RACE Program Manual Firm Ver 4.11

INSTALLATION MANUAL. Residential and Small Commercial Applications. Sensors just make sense

CCT-7320/ROC-2313 Reverse Osmosis Controller

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

USER MANUAL. Intelligent Diagnostic Controller IDC24-A IDC24-AF IDC24-AFL IDC24-F IDP24-A * IDP24-AF * IDP24-AFL * IDP24-F * 1/73

OXY 3690 MP. Measuring transducer for air oxygen

955730_1 4/17/18. FlowSense Operator s Guide For Gen2 20/20 SeedSense Displays

Transcription:

Tank ontinuous Liquid Level Detector Installation Manual FILE:. Written By: Joseph Bachor Date: 11/6/14 DD WIRE OLORS ND OUTLINE DRWING B LRIFITIONS JB 3/30/15 EN 5269 EN 255 hecked By: JOE B. pproved By: JOE M. Date: 11/6/14 Date: 11/6/14 Edgewood, NY 11717 (631) 242-5425 Page 1 of 13 INITIL RELESE 11/7/14 Revision Information EN 5198 GE ODE 8V139 contained hereon, nor reproduction in whole or in part may be made without the express written permission of: INTROTEK INTERNTIONL c

Tank ontinuous Liquid Level Detector Installation Manual Introduction INTROTEK's ontinuous Liquid Level Detector (LM) utilizes a unique pulsed ultrasonic non-invasive design that enables bottom up continuous liquid level detection in a variety of fixed vessels and tanks. The installation process includes identifying a location on the bottom of the tank or vessel in which it will be monitoring in addition to a setup process that is described herein. It is essential that certain guidelines are followed in order to ensure that an optimal configuration is obtained. Note: The sensor head is designed for IPX 4 splash resistance. Submersion or outdoor use may result in degradation. The processor is IP 0 and any contact with water or liquid may result in damage. Page 2 of 13 DTE INTROTEK INTERNTIONL

Required Reference Document 1. LM-0000-OUTLINE Included omponents and Hardware 1. Sensor Head 2. Processor 3. onnecting able 4. Epoxy Packet and Material Safety Data Sheet 5. oupling Gel Packet and Material Safety Data Sheet 6. Installation Manual Setting up the Sensor The following steps will be required for setting up and configuring the sensor. STEP 1: iming Process STEP 2: onfiguration Process STEP 3: Bonding the Sensor to the Tank STEP 4: Saving Setting and Finalization Other ddition Tools Needed: D Voltmeter Shim or fixture arrangement to hold the sensor in place while the epoxy cures. Page 3 of 13 DTE INTROTEK INTERNTIONL

Wire Diagram Mounting Find a mounting location on the bottom of the Tank / Vessel to be measured. The location must satisfy the following criteria: Page 4 of 13 DTE INTROTEK INTERNTIONL

a. The tank or vessel Must Be Level and the transducer will need to be parallel to the top surface of the liquid to be measured. Bad Good b. Find a location that has a clear line of sight to the top surface of the liquid. Ensure there are No Obstructions such as mixers, agitator and plumbing. Bad Good Page 5 of 13 DTE INTROTEK INTERNTIONL

c. Locate a position on the bottom of the tank that is flat, level and Parallel to the surface of the liquid. Bad Good d. Transducer mounting Surface Must Be Smooth and Unpainted. Painted or coating surfaces will need to be prepared by sanding (or sand blasting). Final sanding using fine grit to obtain a smooth contact point for mounting. Page 6 of 13 DTE INTROTEK INTERNTIONL

Other dditional Requirements: Tanks can not have double wall Tanks can not have liners Tanks can not have obstructions interfering with transmission path Tanks can not have sediment or rust Tanks can not have excessive turbulence Tank can not have flexure due the weight of the liquid or other mechanical influence Tank Preparation: Locate a position on the bottom of the tank where the sensor will be mounted. In addition to the illustrated criteria described above, the mounting surface must be clean and free of dirt and debris. If the mounting surface is not smooth sanding and polishing may be required. This can be accomplished using a wire wheel or 200 grit emery paper. This will help facilitate sensor coupling to the tank and provide maximum signal strength. Prior to setup adjust the liquid level to be as near as possible to the normal full tank Height (see Table 1 for the permissible height range for each dip switch setting). Failure to dust the height will cause repetitive failure to auto set. iming Process. Step 1 The aiming process is a location finding process to obtain adequate signal strength. D volt meter for monitoring the output during this process will be required. Reference wiring diagram Remove power by disconnecting the power cable if connected. a) Set Dip switches 1, 2 and 3 to the anticipated maximum liquid height level in the tank. Round up to the closest liquid height level; i.e. select 24 for a height level of 20. Ref. Table 1. Page 7 of 13 DTE INTROTEK INTERNTIONL

The wrong dip switch setting will cause an error and result in an incomplete setup. DIP settings Max Liquid Height Level To be Detected 1 2 3 4 (inches) Up-Up-Up-Up 12 Up-Up-Down-Up 24 Up-Down-Up-Up 36 Up- Down - Down -Up 48 Down -Up-Up-Up 60 Down -Up- Down -Up 72 Down - Down -Up-Up 84 Down - Down - Down -Up 96 Table 1: Dip Switch Settings Page 8 of 13 DTE INTROTEK INTERNTIONL

*If the DIP switch setting is changed the processor will need to be powered down and repowered up for height setting to update. b ) The aiming process is initiated by setting dip switch #4 (right most switch) to the down position. Reference Below pply Power Supply (connect the power cable) pply ultrasonic gel liberally to the sensor head sensing surface. Press the sensor to a central location on the bottom of the tank. Slide the sensor head around making small positional changes to find the best location for the maximum possible output voltage. Observe the signal strength as indicated by the volt meter reading. ttempt to achieve a 1 volt reading or better. LED olor Red Yellow Green Voltage No Signal Partial Signal Good Signal 0 to 5 volts - The higher the voltage the better signal. It is not necessary to have the max 5 volt output and/or a green LED. Only the maximum output voltage obtainable is what s important.. The sensor must be kept tightly coupled exactly at this location. This can be accomplished by chocking and or shimming the sensor head against the bottom of the tank for the remaining steps. It might be easier to achieve and maintain the highest signal position by moving the chocked/shimmed assembly to find the best signal. The Sensor Power must remain On while continuing on to the next step. Page 9 of 13 DTE INTROTEK INTERNTIONL

onfiguration Process: Step 2 This step is necessary and will set the processor to an adaptive mode so that it can configure settings unique to your application. This can take from 30 seconds to 5 minutes to complete. This Step 2 is initiated by restoring dip switch #4 (right most switch) to the up position. Do not move sensor head during this function. The processor will now be automatically advancing through the process. The Table below identifies the progress and will provide status indications. The signal strength initially is not matched to the vessel and the configuration process is an iterative process in that a closer match of signal gain is approached with each auto-set attempt. Note: Yellow= In-Progress Output (V) Process LED status 0.5 Begin uto Setup RED 1 djusting gain YELLOW 1.5 Gain djust Incomplete RED 2 djusting G delay YELLOW 2.5 G Delay Incomplete RED 4 Incorrect liquid level RED 5 ompleted Successfully GREEN Table 2 The auto-setup has begun when the led briefly turns red and the voltage briefly is 0.5 volts. s the process continues the led will be yellow until the auto-setup successfully completes s indicated by a green led and a voltage of 5 volts OR a problem has been detected as indicated by a red led and the corresponding voltage level problem indicator as listed in Table 2. Page 10 of 13 DTE INTROTEK INTERNTIONL

(If a green light cannot be obtained at the end of the process heck voltage output for the problem indication in the chart and repeat starting at Setting up the sensor STEP 1: iming Process) Note: If successful results cannot be obtained factory default setting can be restored by toggling switch #4 down then up while still powered. (This can only be accomplished after a utoset has ended with either the Red or Green status Led On). Remove power by disconnecting the power cable Bonding Process: Step 3 The sensor will be permanently bonded to the tank in this step after configuration Process has been successfully completed. Note: Observe all cautions and protective equipment requirements as per MSDS # 07895#1. arefully mark or denote the precise location of the sensor on the bottom of the tank. Remove the sensor and clean the tank bottom and the sensor head to be completely free of coupling gel and residue. Premix the contents of the 2 part epoxy. pply a thick layer of epoxy to the sensor head as evenly as possible without any air bubbles. Press the sensor head to the location denoted on the bottom of the tank. pply enough force to ensure that all the air has been displaced between the sensor and the tank. It will be necessary to fixture or shim the sensor to bottom of the tank to ensure the sensor remains firmly in place while curing. 24 hours will be required for curing. Finalization Process: Step 4: This step is performed 24 hours after the sensor has been bonded to the tank. Observe that the epoxy has completely cured before proceeding. pply Power Supply (connect the power cable) Toggle Dip switch 4 to the down position. Observe the output voltage on the voltmeter displays a reasonable signal strength. Page 11 of 13 DTE INTROTEK INTERNTIONL

Toggle Dip switch 4 to the up position. The sensor will begin the finalization process and will advance through the automatic process similar to Step 2. The Table below identifies the progress and will provide status indications. Output (V) Process LED status 0.5 Begin uto Setup RED 1 djusting gain YELLOW 1.5 Gain djust Incomplete RED 2 djusting G delay YELLOW 2.5 G Delay Incomplete RED 4 Incorrect liquid level RED 5 ompleted Successfully GREEN opy of Table 2 Save the configuration setting by Disconnect and Reconnect the Power able to the sensor. fter successfully installing the sensor the LED will illuminate green. The output voltage will correspond to the liquid level in the tank. The sensor will require a minimum liquid level in the tank to operate. This is referred to as the Dead Zone. The Dead Zone can vary based on the tank material and thickness and is typically 4 inches. Therefore the sensor will require about 4 of liquid before it begins to operate. This is reflected in the output voltage equation on the last page. The output voltage can be calculated as follows: Page 12 of 13 DTE INTROTEK INTERNTIONL

wl = water level dz = Dead Zone= 4 Dead zone is typically 4 inches though depending on the tank material and thickness it may be less. ss = Height Level Dip Switch Setting During normal operation the LED indications are as follows: Green = Good Signal Yellow = Weak Signal or liquid turbulence Red = No Signal Page 13 of 13 DTE INTROTEK INTERNTIONL