CS10 # Network Safety Performance Objectives (2016)

Similar documents
ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Intermediate Angle, 0-25, Drilling detail. Angle 26-50, Baulk Plates, Pole Details. Termination Poles, ABC Details

APPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH

This Procedure details the procedures to be followed in order to achieve Safety from the System when:

Definitions found in several locations:

Power Unit 075. Maintain Substation Circuit Breakers

Operating Instructions

METHODOLOGY RISK TABLES TABLE 1 - QUALITATIVE MEASURES OF CONSEQUENCE OR IMPACT TABLE 2 - QUALITATIVE MEASURES OF LIKELIHOOD

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

Development and Evolution of an Asset Management Organization

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

TOWER INSPECTION REPORT

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

You Just Experienced an Electrical Failure, What Should You Do Next? By Don Genutis Hampton Tedder Technical Services

Installation, operating and maintenance Instructions for Seemag bypass level indicator

FIRE PREVENTION METHOD FOR 275KV OIL-FILLED CABLE IN TEPCO

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

TVPPA Lineman Apprenticeship Program

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

KMU SUBSTATION WORKSHOP

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company

COOPER POWER SERIES. 600 A, 15, 25, and 35 kv Class Cleer Grounding Elbow Installation Instructions. Loadbreak Apparatus Connectors MN650056EN

ES18 Security Theory/Regulations Answer Schedule

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

POWR-BLOKS Distribution/Splicer Blocks and Covers

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN

SEMME2135 Assisting in modifying and adding electrical circuits in yachts and boats

Canadian Electrical Code, Part I Full Impact Assessment

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

COOPER POWER SERIES. 200 A 15/25 kv class elbow installation instructions. Deadbreak Apparatus Connectors MN650042EN

COOPER POWER SERIES. 200 A 15/25 kv class deadbreak straight connector installation instructions. Deadbreak Apparatus Connectors MN650043EN

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Chapter 5: Comparison of Inspection and Testing Results

Original Date of Issue: 04/09

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

HV Spiker Kit - CSTE. 30 th April 2014

Infrared Thermography Inspection Guidelines. Date Issued:

Guidelines to the standard IEC60601

Resiliency of Power Systems Earthquake, Wind, Ice, Fire

APPENDIX D HYDRO-VAC

S Surge Arresters

Lessons from (Transmission Line) Failures

Applications and Considerations Section 11

Ground Fault Circuit Interrupter(GFCI) Policy

METROSIL CURRENT TRANSFORMER PROTECTION UNIT (CTPU) ENCLOSURES IEC COMPLIANT

Lightning and surge protection for yachts

Safety Powder Spray Systems

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

CITB Construction site safety update

Norrsken Family Booklet

Inspection Recommendations

Document Owner: Name: Phil Langlois Position: Lead Electrical Engineer

Safe Schools: A Health and Safety Check

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

COOPER POWER SERIES. UltraSIL Polymer-Housed Distribution-Class MOV Surge Arrester Installation Instructions. Surge Arresters MN235006EN

Fencing. Fencing - a look back in time

COOPER POWER SERIES. DS250 deadbreak straight connector installation instructions interface A. Connectors MN650027EN

IFE Level 3 Diploma in Fire Safety and Fire Science. Unit 6 Fire Service Operations and Incident Command

PORTABLE LIGHTNING MAST PROTECTION PLP SERIES INSTRUCTION MANUAL

SG33KTL-M Quick Installation Guide. 1 Unpacking and Inspection

Erection, maintenance and disposal Inverted installation. Zinc oxide silicone-housed surge arresters PEXLIM R-X, Q-X and P-X

Socket P2RF-05-S P2RF-08-S Clip & Release Lever Nameplate R99-11

Product Safety and the use of EMC techniques to evaluate the 30 Amp Ground continuity test

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course

CONDUCTIVITY POINT/S LEVEL SWITCH JAYCEEAQUA 4000 SERIES

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

2013 STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

750 Cable Cutter INSTRUCTION MANUAL

Preview to the 2018 NFPA 70E, the Standard for Electrical Safety in the Workplace

Operating Instructions

MEWP - Boom Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Electrical Safety. Hazard Awareness

COOPER POWER. SERIES VariSTAR type AZE station class surge arresters installation and maintenance instructions. Surge Arresters MN235022EN 0.

INSTALLATION, OPERATING AND MAINTENANCE MANUAL Submersible Ballast Pump MANUFACTURED BY

Pools and powerlines. Things to know when planning or designing swimming pools for ACT backyards.

GAS PIPELINE SAFETY GUIDE.

$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.

sdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzx

Optimized Maintenance Planning for Transmission Power Systems.

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

Working with Grantors

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

RELIABILITY OF ENERGY SYSTEMS

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Part 3: Safety Rules for the Installation and Maintenance of Underground Electric Supply and Communication Lines

It is essential that the maintenance staff is qualified for electrical works and follows safety procedures.

Gas Network Craftsperson

COOPER POWER SERIES. VariSTAR Storm Trapper high energy MOV arrester installation instructions. Surge Arresters MN235017EN

Nordel GRID DISTURBANCE AND FAULT STATISTICS

VI.D AIR DISCONNECT SWITCHES

Typical Strength of Glued Connection. Typical Strength of Screwed Connection

SDX Submersible Depth Transmitter User Manual

ANNUAL METEOROLOGICAL MONITORING TOWER INSPECTIONS - MAINTAINING SAFETY AND EXPOSURE TO WIND

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Transcription:

CS10 #4384287 Network Safety Performance Objectives (2016)

Context & Purpose The Horizon Power Network Safety Objectives (2016) (Objective Statement) has been prepared for each of network safety performance incidents detailed in Regulation 30 and in accordance with the requirements set out in Regulation 31 of the Electricity (Network Safety) Regulations 2015. Regulation 31 requires Horizon Power to prepare a statement that sets out the objectives in relation to the maximum number of incidents that will occur for the current financial year and the next three financial years. This Objective Statement covers 3 financial years from 2016/17 to 2018/2019. Objective Establishment Horizon Power has applied a trend based methodology for this Objective Statement. The methodology relies on the historical performance of the network. In setting objectives, Horizon Power considers performance forecasts alongside a range of additional factors such a s: external benchmarking, input from Regulators, market conditions and customer expectations. Objective Statement This Objective Statement provides the objectives that Horizon Power will strive to achieve in the maintenance and operation of its network. CS10 #4384287 Page 2 of 5

Network Objectives 1 Historical Works Planned Works 2016/17 2017/18 2018/19 30(1)(a) Total Electric Shock Twisty Replacement Streetlight Program 8 8 8 Person No Injury Streetlight Copper Wire System Hardening 8 8 8 Person Injury Replacement Earthing Works Person Death WireAlert (Esperance only) Copper Conductor Replacement Livestock Death Double Insulated Streetlight Earth Circuit Breaker Replacement 30(1)(b) Total Property Damage (Not Fire) 7 30(1)(c) Total Property Damage (Fire) 7 Distribution Network Objectives 1 Historical Works Planned Works 2016/17 2017/18 2018/19 30(1)(d) Total Pole Fire Insulator Washing & Coating Insulator Washing & Coating 9 9 9 Pole Insulator Replacement Pole Insulator Replacement 30(1)(e) Total Conductor Clashing 5 Cross Arm Replacement Esperance Network Rural Upgrade Cross Arm Replacement Network Hardening (Kimberley) 6 6 6 30(1)(f) Total Unassisted Pole Failure 9 9 9 Wood 4 4 4 Steel 4 Enhanced Pole Inspection 5 5 5 Other 30(1)(g) Total Unassisted Conductor Failure Conductor Replacement Conductor Replacement 7 7 7 Conductor Sample Testing Conductor Sample Testing 30(1)(h) Total Unassisted Stay Failure 6 Managed with Poles Stay Rod Replacement 2 2 2 30(1)(i) Total Unassisted Cable Failure Cable Replacement Cable Replacement 4 4 4 31(3) Total Unassisted Pole Failure Rate 1.6 1.6 1.6 Wood x 10,000 p.a. 2.2 2.2 2.2 Steel 4 x 10,000 p.a. 1.3 1.3 1.3 CS10 #4384287 Page 3 of 5

Transmission Network Objectives 2 Historical Works Planned Works 2016/17 2017/18 2018/19 30(1)(d) Total Pole Fire Pole Replacement Pole Replacement 30(1)(e) Total Conductor Clashing 5 EPIL Reliability Study 30(1)(f) Total Unassisted Pole Failure Wood Steel Other Tripod Review 30(1)(g) Total Unassisted Conductor Failure EPIL Reliability Study EPIL Reliability Study 30(1)(h) Total Unassisted Stay Failure 6 EPIL Reliability Study EPIL Reliability Study 30(1)(i) Total Unassisted Cable Failure EPIL Reliability Study EPIL Reliability Study 31(3) Total Unassisted Pole Failure Rate Wood x 10,000 p.a. Steel x 10,000 p.a. Notes 1. The Underground Power Project is in progress this will impact all Network and Distribution Network Objectives 2. The Transmission Unserviceable Asset Replacement program is in progress this will impact all Transmission Objectives 3. A 3 year rolling average in conjunction with consideration of weather events, historical works and planned works has been used to determine the objective for each measure 4. Unassisted steel pole failures and failure rates include all steel poles 5. Unassisted conductor clashing objectives are based on reported incidents this does not capture all clashing incidents occurring on the network 6. Unassisted stay failure objectives are based on reported incidents this does not capture all stay failure incidents occurring on the network 7. Objectives for property damage due to fire, supply, impact and arcing are set at zero based on previous history of insurance claims above $5,000 CS10 #4384287 Page 4 of 5

Network Safety Performance Incident Definitions 30(1)(a) Electric Shock A discharge of electricity from the network that causes the electric shock, injury or death of a person or the death of livestock. Includes pets within the definition of livestock. 30(1)(b) Property Damage (Not Fire) An incident caused by the network, other than a fire, that causes damage to property other than to the network. Includes supply, impact and arcing damage. Value of damage must exceed $5,000. 30(1)(c) Property Damage (Fire) A fire caused by the network that causes damage to property other than to the network. Includes smoke and heat damage. Value of damage must exceed $5,000. 30(1)(d) Pole Fire A fire, on a wood pole that is a part of the network, that originated on the pole. Includes burnt cross arms. 30(1)(e) Conductor Clashing The contacting of 2 or more conductors of the network, of different phases, caused by temperature variations or wind. Includes clashing due to pole lean and phase to earth clashing. Excludes assisted failures [see 28(c)]. 30(1)(f) Unassisted Pole Failure An unassisted failure of a pole that is a part of the network. Includes suspended failures and foundation failure [i.e. excessive pole lean]. 30(1)(g) Unassisted Conductor Failure An unassisted failure of an overhead conductor that is a part of the network. Includes service wires, joints and terminations and excludes taps and conductor accessory failures [e.g. ties, clamps]. 30(1)(h) Unassisted Stay Failure An unassisted failure of a stay wire that is a part of the network. Includes slack stays and failure of anchors and attachment points that compromise line design integrity in a way that impacts public safety. 30(1)(i) Unassisted Cable Failure An unassisted failure of an underground cable that is a part of the network. Includes failure of joints, terminations and lugs in a way that impacts public safety. 31(3) Unassisted Pole Failure Rate The failure rate per 10,000 poles per annum based on the 30(1)(f) and pole volumes. 28(c) Unassisted Failure Unassisted failure, of a pole, overhead conductor, stay wire or underground cable, means the pole breaking or collapsing, the conductor or wire breaking or the cable failing, otherwise than because of (a) a force exceeding the failure limit or design wind load specified in the applicable standard; or (b) a lightning strike, earthquake, fire or flood; or (c) malicious damage; or (d) excavation other than by a person for whom the network operator is responsible; or (e) any other similar occurrence beyond the control of the network operator. A failure is unassisted if it is due incorrect network design construction or vegetation growth into the vegetation clearance zone. CS10 #4384287 Page 5 of 5