September Sept ember 18,

Similar documents
MUNICIPAL SOLID WASTE MANAGEMENT IN PIMPRI- CHINCHWAD CITY, INDIA-AN OVERVIEW

Data collection for improvement of waste management

Full Report Available October 10th at

MSW Objective 1.1: Level of Service Standards To maintain the IMSWMS MSW collection system to meet or exceed established LOS standards.

Presentation on Municipal Solid Waste (MSW) Interstate Flow in the Northeast in 2014 November 13, 2017

Research in the waste area

APPENDIX P U.S. EPA WARM MODEL OUTPUT

Highland Park Glengarry Court. Landscape design and Fencing rules

Municipal waste management in Cyprus

Utility Rates and Fees

International Conference on Solid Waste Management for South Asia

CCR Fugitive Dust Control Plan

Transport, Health, Environment & Equity in Indian cities

GENESIS FACILITY, EASTERN CREEK COMPLAINTS REGISTER (updated monthly) Genesis Complaints Register Page 1

Redondo Beach Boat Launch Ramp Facility

Utility Rates and Fees

Utility Rates and Fees

D.B. Wilson Station CCR Landfill

Justin L. Williams Land Protection and Revitalization Division Director

PGA (Processed Glass Aggregate)

Sustainable Solutions for Municipal Solid Waste Management in Thailand

GEO Certified Independent Verification Report

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

Life Cycle Assessment of MSW kerbside separate collection system applied to small communities

TRAFF IC CALMING POLICY

2009 Master Plan & Reexamination Report Verona, New Jersey

Alta Planning + Design

Hospital Link Project Project Update November 2017

Transportation Master Plan Advisory Task Force

WTERT (China) PROGRESS REPORT. ( )

Hospital Link Project Project Update September 2017

Case Study 3. Case Study 3: Cebu Island, Philippines MPA Network 10

ASIA PACIFIC RAIL 2006

PREDICTING MUNICIPAL SOLID WASTE GENERATION IN ANDORRA WITH SYSTEM DYNAMICS MODELLING. M. Pons, C. Pérez, J.J. de Felipe, E. Jover

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

CCR Fugitive Dust Control Plan

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

The Limassol SUMP Planning for a better future. Apostolos Bizakis Limassol, May 16, th Cyprus Sustainable Mobility and ITS conference

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Eastern PA Trail Summit October 1, 2018

City of Ottawa s Complete Streets Approach to Transportation Projects

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Bathing Water Profile - Carne (2017)

Active Transportation Infrastructure Investment A Business Case

Effect of Moisture Content of Wet Fly Ash on Basic Properties of Mortar and Concrete

REYKJAVÍK - NEW MOBILITY OPTIONS

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

The McDonald Golf Family

Part 9 Specific Land Uses - Foreshore & Waterway Development

Business Plan Presentation

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

TABLE OF CONTENTS LEGAL NOTICE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

TABLE OF CONTENTS LEGAL NOTICE

EYC Foundation Sponsorship 2015 Leukemia Cup Regatta and Rock the Dock Party Recap

TABLE OF CONTENTS LEGAL NOTICE

Evaluation and Demonstration of Safety of Decommissioning of

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

MEMORANDUM. Existing Operations. City of Clearwater. Michael Herrman. Date: January 26, Seminole Boat Launch Overview. M&N Job No.

Big Rivers Electric Corporation - D.B. Wilson Generating Station. Fugitive Dust Control Plan for Coal Combustion Residuals

Reams Road RCA Study. Board of County Commissioners Public Hearing

Cross Street Corridor Non-Motorized Enhancement Project Project Description

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Interstate Flow of Municipal Solid Waste Among the NEWMOA States in June 9, 2004

RI Regulatory Setbacks & Buffers: Coastal Management Issues

CLIMATE ACTION PLAN PROGRESS UPDATE. Climate Action Program APRIL, 2018

Building sidewalks on local streets to reduce accessibility barriers

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

Ennore Coal Port Project: Port Basin and Entrance Channel

STAFF REPORT ACTION REQUIRED. Public Works and Infrastructure Committee. General Manager, Transportation Services

Urban Transport Service Level Benchmarking in Urban Transport for Indian Cities

Environmental Management Strategy

Improving Road Safety for North Eastern State Roads of India A Case Study

Business Park District Summary of Allowable Uses

Rio Mills Rd/Berkmar Dr Extended Connection

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

~BEY~IRLY HILLS ~ AGENDA REPORT

The definition of system size This makes it possible to subsequently define the appropriate number of bicycles to be used in the system.

CHAPTER 7.0 IMPLEMENTATION

Wellington Public Transport Spine Study

Tonight is for you. Learn everything you can. Share all your ideas.

PLA Recovery & Recycling - a pilot project at University of Wisconsin - Stevens Point. Paul Fowler Biopolymers Symposium October 17 th, 2012

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

The Safe System Approach

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

Urban Street Design and Development

Centerwise, Courtwise Jurisdiction of Metropoitan Magistrate's Courts in Mumbai as on 01/03/2018

Auckland Council: Electric bicycle CBD trial

5 DECEMBER Cycling In London. Andrew Summers, Transport for London Strategy and Policy Manager Active Travel and Health.

CPC Parking Lot Riverside Drive. Transportation Rationale

Transcription:

September 18, 2013

Objective of SWM Plan for Mumbai Technologically Suitable and Commercially Sustainable solution for managing MSW in Greater Mumbai for planning period of 25 years (2005-2030)

Status of SWM in 2005 Generation at Source Collection and Disposal Transportation Residences House to house collection Dumping of waste at Streets and Roads Street sweeping 3 Landfill sites Commercials Community bins (Deonar, Mulund and Gorai) Beaches Fleet of municipal & private Hotels and restaurants vehicles Slum colonies 3 Refuse Transfer Stations Construction activities (Mahalaxmi, Kurla and Versova)

Administrative Zones in Mumbai Greater Mumbai Municipal Area ( 437 Sq. Km.) comprises of 24 administrative wards The wards are aggregated td into 3 regions City region Zone 1 (Wards A, B, C, D, E) Zone 2 (Wards F(N),F(S),G(N),G(S)) Western suburbs Zone 3 (Wards H(E),(H(W),K(E),K(W)) (H(W) K(W)) Zone 4 (Wards P(N),P(S),R(N),R(C),R(S)) Eastern suburbs Zone 5 (Wards L, M(E),M(W)) Zone 6 (Wards N, S, T) Existing Dumps New Site Transfer Stations

Disposal of MSW MSW is disposed at three landfill sites by open dumping Name of Site Operational Since Total Area (ha) Height of Waste (m)* Future life** (years) Gorai 1972 20 10.2 2 Mulund 1968 25 7.5 2 Deonar 1927 132 80 8.0 8 A land admeasuring 141.7 ha. at Kanjur Village was g j g handed over to MCGM by GoI through GoM.

Aerial View of Deonar Disposal Site

Slums adjacent to Deonar Disposal Site

Aerial View of Gorai Disposal Site

Mangroves Adjoining Gorai Site

Waste Dumping at Gorai Site

Waste Dumping at Gorai Site

Waste Spilled Over the Mangroves

Aerial View of Mulund Disposal Site

Residential colonies adjacent to Mulund Disposal Site

Context Treatment and Disposal were areas of major deficiencies in SWM of Mumbai A comprehensive solution addressing long term (25 years) need for management of MSW and C&D waste was required A detailed study Commenced in July 2005 for development of integrated treatment and disposal plan for Mumbai

Aggregate Composition (By Major Material Category Reaching Dumping Grounds) 60 50 40 Percen nt by Weight 30 20 10 0 Wet Organic Materials Dry Organic Materials Plastic Paper Other Recyclables Inerts Deonar Gorai Mulund

Critical MSW Characteristics Content of high biodegradable waste (>50%), recyclable materials (18.6%), inerts (12.5%) High Moisture about 50% in dry period, up to 65% in monsoon Low calorific value (below 1000 K Cal/Kg)

Technologies considered Aerobic composting Refuse derived fuel Bio methanation Mass Burn (Incineration) i Gasification/Pyrolysis Landfill as Bio rector Plasma Pyrolysis Vitrification (PPV)

Reliability Filter Proven Technology for Large Scale Application Proven Internationally requires Caution before adopting for Mumbai No Proven Track Record Waste Suitability Filter Technology Evaluation Criteria Suitability for Mumbai Waste Can be made suitable by using Auxiliary Fuel Unsuitable for Mumbai Waste Environmentally Accepted Filter Environmentally and Socially Accepted Environmental Suspect/Does not Meet MSW Rules 2000

Shortlisted Technologies Composting Bio methanation Refuse Derived Fuel for special waste Bioreactor landfill

ProjectedPopulation Population and MSW Generation Year Population MSW MSW reaching (Million) Generated Dumping Grounds (TPD) (TPD)* 2005 12.63 7,426 6000 2015 14.42 9,358 7500 2025 16.21 11,525 9200 2030 17.10 12,674 10,100 * Uncollected waste and reduction due to recycling estimated @ 20%

Strategy for Waste Management Site Waste Total Closure Available Allocation Area Needs for future (tons) (ha) (ha) (ha) Waste Processing/ DisposalTechnology Mulund 500 25 11 9 Partial Closure (PC) Bio-methanation + Sa. Landfill Deonar 2000 132 52 80 (PC + Composting + Sa. Landfill Kanjur 4000 141 nil 120 Composting + Sa. Landfill Gorai - 19.6 17.6 2 Full Scientific Closure Total 6500 317.6 79 211 -

Site Management Plan for Gorai Sheet Piling & site infrastructure Provide sheet pile barrier on the creek ward side to stop tidal intrusion into the waste Develop ancillary infrastructure of boundary walls, roads and lighting Relocation of Waste and slope moderation Shift the waste at site into about 360 m by 360 area Ri Raise the landfill to structurally recommended dd level l of 20 m Moderate side slopes to 1:3 Provide leachate collection and transportation system

Site Management Plan for Gorai Cover for final closure Close the landfill by encapsulating it in impermeable cover Landscape D l h i l d d d d i Develop the site as landscaped open area and a demonstration unit for segregation and in house/premises processing of MSW

Site Management Plan for Gorai Existing Contours Creek-side face Creek-side face Creek-side face A A

Site Management Plan for Gorai Cross section section view at section AA

Sheet pile arrangement and finished levels Creek-side face Creek-side face Creek-side face Legend: Sheet Pile Alignment Boundary Wall (4m high) on Landside Finished Top

Gorai Landfill Post Closure

Management Plan for Mulund Site N LEGEND: Proposed Access Road Existing Road Green Belt Site for Biomethanation Plant Area to be Partially Closed MSW to be Relocated Finished Top Future Expansion & Emergency Operation

Management Plan for Deonar Site N LEGEND: Access Road Site for Future Use Area for Composting Landfill Area Area to be partially closed MSW to be Relocated Leachate Treatment Area Leachate Collection Area Alignment of Bund With Side Drain Finished Top

Projected MSW Reaching Kanjur Village Site Year MSW MSW (TPD) (TPD) 2005 6100 3500 2010 7100 4500 2015 8100 5500 2020 8900 6300 2025 9800 7200 2030 10500 7900

WATER TANK WATER TANK MANGROVES AREA 2.2m BH-8 2m BH-9 5.2m BH-10 BH-11 BH-12 BH-13 BH-14 G-L 9.3m 6.3m 7.6m 7.5m 0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 Section H-H Soft Basalt (Rock) / Grey Concretions Light Brownish / Blackish Grey clayey silt BH-28 BH-29 BH-30 BMC1 BMC2 BH-21 BH-22 BH-23 BH-24 BH-25 BH-26 BH-27 BH-15 BH-16 BH-17 BH-18 BH-19 BH-20 BH-8 BH-9 BH-10 BH-11 BH-12 BH-13 BH-14 H H BH-1 BH-2 BH-3 BH-4 BH-5 BH-6 BMC8 BMC7 BH-7

BMC2 WATER TANK BMC1 WATER TANK BMC8 BMC7 MANGROVES AREA Management Plan for Kanjur Land Fill Area MSW Processing Area BH-28 BH-29 BH-30 BH-21 BH-22 BH-23 BH-25 BH-24 BH-26 BH-27 BH-15 BH-16 BH-17 BH-18 BH-19 BH-20 BH-8 BH-9 BH-10 BH-11 BH-12 BH-13 BH-14 BH-1 BH-5 BH-6 BH-2 BH-3 BH-4 BH-7

Management Plan for Kanjur

Lessons Holistic solution for a practical time horizon in necessary for effective SWM through PPP Availability of sufficient land area for implementing technologically appropriate solution is important t Environmental and social issues need to be resolved adequately and upfront The qualification criteria must weed out inexperienced bidders Branding by an internationally recognized player could be very useful to instill confidence