Over the Edge. Forecasting beyond the Boundaries of the Regional Model

Similar documents
Nevada County Population Projections 2013 to 2032 Based On The Last Estimate Year of 2012

Mobility and Congestion

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

CHAPTER 4: IDENTIFICATION OF ROAD SYSTEM DEFICIENCIES: TRANSPORTATION PLANNING MODEL

City of Homewood Transportation Plan

Chapter 4 Traffic Analysis

APPENDIX W OFF-MODEL ADJUSTMENTS

Assessing the Traffic and Energy Impacts of Connected and Automated Vehicles (CAVs)

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

Chapter 5 FUNCTIONAL CLASSIFICATION

Understanding changing travel demand in Greater Manchester

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Forecasting. Forecasting In Practice

MULTIMODAL NEEDS ASSESSMENT

DEVELOPMENT OF A SET OF TRIP GENERATION MODELS FOR TRAVEL DEMAND ESTIMATION IN THE COLOMBO METROPOLITAN REGION

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Defining Purpose and Need

STUDY ADVISORY COMMITTEE. October 8, 2015

Chapter 2 Current and Future Conditions

EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS

1999 On-Board Sacramento Regional Transit District Survey

Regional Transportation Needs Within Southeastern Wisconsin

Fixed Guideway Transit Outcomes on Rents, Jobs, and People and Housing

Airport Forecasting Prof. Richard de Neufville

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Webinar: The Association Between Light Rail Transit, Streetcars and Bus Rapid Transit on Jobs, People and Rents

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Memorandum. Drive alone

2010 Pedestrian and Bicyclist Special Districts Study Update

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Indiana Electricity Projections: The 2018 Forecast Update

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Policy Number: Effective: 07/11/14 Responsible Division: Planning Date: 07/11/2014 FUNCTIONAL CLASSIFICATION AMENDMENT POLICY

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

APPENDIX E BIKEWAY PRIORITIZATION METHODOLOGY

Appendix 3.2 D. Ridership Errata Sheet

Pedestrian Demand Modeling: Evaluating Pedestrian Risk Exposures

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP

Growth Trends in Hampton Roads

Nevada County Population Projections 2015 to 2034

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

3.0 Future Conditions

Calculation of Trail Usage from Counter Data

Transportation Trends, Conditions and Issues. Regional Transportation Plan 2030

Performance Measure Summary - San Jose CA. Performance Measures and Definition of Terms

Performance Measure Summary - Chicago IL-IN. Performance Measures and Definition of Terms

PERFORMANCE ANALYSIS of The Draft 2015 CLRP

Appendix T 1: Additional Supporting Data

Performance Measure Summary - Denver-Aurora CO. Performance Measures and Definition of Terms

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Have You Ever Heard the Phrase

METRO Light Rail: Changing Transit Markets in the Phoenix Metropolitan Area

UNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]

Managed Lanes: The Fitch Approach. Saavan Gatfield, Senior Director

1. A Report to the Attorney General of the State of Alaska I TO THE EXXON VALDEZ OIL SPILL. December 18, 1992 OF RECREATIONAL FISHING LOSSES RELATED

Presentation Summary Why Use GIS for Ped Planning? What Tools are Most Useful? How Can They be Applied? Pedestrian GIS Tools What are they good for?

An Assessment of Potential Greenhouse Gas Emissions Reductions from Proposed On Street Bikeways

Calgary Transit Route 302 Southeast BRT Year One Review June

Active Travel and Exposure to Air Pollution: Implications for Transportation and Land Use Planning

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

Review of Glenamuck Local Area Plan. Traffic Modelling Report

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

RIDERSHIP PREDICTION

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

#!! "$% ##! &! # '#! % $ #!

Trade Growth - Fundamental Driver of Port Operations and Development Strategies

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

Allocations vs Announcements

Rochester Area Bike Sharing Program Study

Decision on North Waterloo Routing

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Des Moines Area MPO Safety Performance Targets and Methodology

Owl Canyon Corridor Project Overview and Summary

Non-motorized Transportation Planning Resource Book Mayor s Task Force on Walking and Bicycling City of Lansing, Michigan Spring 2007 pg.

ALABAMA HUNTING SURVEY

SMART 1 Public Meeting #1. February 24, 2016

EXAMINING THE EFFECT OF HEAVY VEHICLES DURING CONGESTION USING PASSENGER CAR EQUIVALENTS

South King County High-Capacity Transit Corridor Study

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Proposed Action, Purpose and Need Technical Memorandum

Tokyo: Simulating Hyperpath-Based Vehicle Navigations and its Impact on Travel Time Reliability

US 69 RELIEF ROUTE STUDY

IMPACTS OF TRAFFIC RESTRICTIONS AND INFRASTRUCTURE IMPROVEMENTS ON DOWNTOWN PEAK HOUR CONGESTION: A SYNCHRO ANALYSIS FOR BELLEVUE, WASHINGTON

APPENDIX C. Systems Performance Report C-1

Arterial Management Plan for US Route 250 and State Route 623

Arterial Performance Evaluation on an Adaptive Traffic Signal Control System

Estimating benefits of travel demand management measures

Maurer 1. Feasibility Study for a Bicycle Sharing Program in Sacramento, California

2010 TRAVEL TIME REPORT

WHO road safety data collection experience Dr Kacem Iaych SafeFITS Round Table Geneva 30 June 2017

FINAL Albertville Business Park AUAR Update Traffic Study

Traffic Analysis Report No-Build Conditions (2040)

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

The World and U.S. Economy and San Pedro Bay Container Trade Outlook Forecast Review

Measuring Transportation: Traffic, Mobility and Accessibility

Transcription:

Over the Edge Forecasting beyond the Boundaries of the Regional Model 2017 ITE Western District Annual Meeting Made Possible Using Data Courtesy of NDOT

Topics Covered The difficulties with forecasting at or beyond a model s boundaries Example: Garnet Interchange Conclusions & Suggested Approaches Questions & Answers The Garnet Interchange Today 2

The Problems with Life on the Edge Models tend to be most accurate in the regional center (most detailed networks, most traffic counts, smallest TAZs, etc.) But most development occurs towards the urban fringe. Mis-match between the forecasting needs and the forecasting tool Problem not unique to Las Vegas; happens everywhere Population Growth in RTC Model, 2013-to-2035 3

The Problems with Life on the Edge The problems are even worse when going beyond the boundaries of the modeled area: Developers land bank large areas without detailed plans Timeline dependent on market conditions; hard to predict Through traffic is a high percentage of total traffic, but it is dependent on global factors you may not know much about But work must go forward, even in the face of uncertainty 4

Example: Garnet Interchange Located at the edge of the RTC model region (20 miles from downtown) Being considered for a major upgrade in support of development at Apex Industrial Park Traffic forecasts needed as input for civil design Garnet Interchange Apex Industrial Park 5

Garnet Interchange: Traffic Flows Through Traffic Outlying Communities Apex Traffic All handled somewhat abstractly in the regional model Central Nevada Coyote Springs Garnet Interchange Moapa Apex Industrial Park Mesquite Utah 6

The Great Recession, a Game-Changer The Great Recession was deeper and much, much longer than any previous post- WWII recessions Structural changes are taking place in the U.S. economy. Some of these changes are permanent. Things will not go back to normal ; there is a new normal This will have long-lasting effects on development. Growth assumptions made before the recession must be reexamined and revised Change in U.S. Employment during Post WWII Recessions 7

Forecasting Through Traffic on I-15 Pre-recession forecasts predicted rapid growth Instead, traffic declined by 20% The post-recession trendline may also be misleading since it includes a major one-off event Shows the need to base the forecast on changes in the underlying demand (GRP) Comparison of Trend Forecasts (Pre-Recession Study versus Recent Counts) 50,000 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 Recent Traffic Counts Current Fitted Formula 2008 Fitted Formula Pre-Recession Traffic Counts 8

Technique #1: Use Growth of Underlying Demand Forecasting Through Traffic on I-15 Regression analysis found that 87% of the variation in I-15 traffic could be explained by changes in Las Vegas GRP Derived a fitted curve formula to match the data 9

Forecasting Through Traffic on I-15 Used the forecasts for future GRP from Population Forecasts: Long-Term Projections for Clark County, Nevada 2015-2050 to forecast the traffic going forward 40,000 Through Traffic on I-15 North of Garnet IC Pre-Recession Forecast Through Traffic (Forecast) Through Traffic (Actual) 35,000 30,000 25,000 20,000 Lower than pre-recession forecasts, but consistent with recent trends 15,000 10,000 5,000 0 10

1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 Persons Technique #2: Trip-Gen Rate * Population Forecasting Traffic from Outlying Communities Checked various variable to see how closely they track actual traffic between towns & Las Vegas; None worked well Computed the population growth 100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 Population of Mesquite Pre-Recession High Range Pre-Recession Low Range Mesquite Actual Mesquite Forecast (Current) 10,000 rate based on long-term average 0 Computed the actual per-capita trip-gen rate for trips to/from Las Vegas (from ramp counts). Multiplied this by future population to estimate future trips 11

2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 Population of Coyote Springs Forecasting Traffic from Coyote Springs Land banking for possible new town sometime in the future 120,000 100,000 Local jobs, % retirees, etc. are unknowable 80,000 60,000 CS Master Traffic Study, 2002 Pre-Recession Study, 2010 Lacking better data, but distance & market similar to Mesquite, so assumed same rate of trip-making to Las Vegas as Mesquite 40,000 20,000 0 Current Study Multiplied Mesquite trip-gen rate by population forecast for Coyote Springs to arrive at forecast. Forecast assumed a delayed build-out for Coyote Springs 12

Technique #3: Site Details Apex Industrial Park Location within site determines the traffic using Garnet Interchange Type of jobs, density within each site, sequence of development, etc. are unknown Faraday Future developing a factory and bringing in utilities Utilities installed to serve one site could spur developments on neighboring sites that could connect up Traffic does pass through Garnet Interchange Traffic does not pass through Garnet Interchange Garnet Interchange 13

Forecasting Traffic for Apex Industrial Park Forecasts from Population Forecasts: Long-Term Projections for Clark County, Nevada 2015-2050 suggest anemic growth in transportation and warehousing jobs and actual reductions in manufacturing and utilities jobs over the study period Suggests that Apex is unlikely to build out during the study period (at least not with manufacturing jobs) Market trends suggest that warehousing may be a good fit for this site If significant employment develops, then some retail is likely to follow 14

Forecasting Traffic for Apex Industrial Park Assumed that Faraday Future would create 4,500 industrial jobs as planned Assumed that blue triangle would take advantage of utilities to build warehousing (719 jobs) and retail (100 jobs) Trip-generation rates taken from ITE Concentrating development off US-93 is the worse case for Garnet Interchange design purposes Site of Faraday Future Garnet Interchange 15

Daily Vehicles on I-15 North of Garnet IC Putting it All Together Traffic at Garnet IC After the growth of each component of traffic component had been forecast individually, they were added together to produce the forecasts used for design purposes Forecasts were considerably lower than a pre-recession study, but seem more reasonable in light of current traffic and growth expectations 100,000 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 0 Actual Pre-Recession Forecast Forecasts Assumed effect of internalization Traffic on I-15 North of Garnet Interchange 16

Conclusions & Suggested Approaches When forecasting for developments at or near the edge, you are forced to rely on data sources other than the regional model. Depending on the situation and available data, more than one technique may be needed Large disruptive events (e.g. Great Recession) break previous patterns and force a re-evaluation of previous assumptions. May need to let go of earlier assumptions. To the extent possible, base your forecasts on changes in the underlying demand (GRP & population) rather than on plans. Remember: Approved plans show what is permissible, but the markets determine what will actually happen. 17

Questions & Answers Don Hubbard, TE, AICP Senior Technical Principal in Transportation Planning/Modeling WSP, Sacramento (916) 567-2555 Don.Hubbard@wsp.com 18