Working in Cold Conditions Standard

Similar documents
PERSONAL PROTECTIVE EQUIPMENT

Safety Management System. Initial Revision Date: Version Revision No. 02 GENERAL SAFETY HEALTH PROVISION

Two Main Risks Associated with Foundry Work

HEAT ILLNESS PREVENTION PROGRAM. Cal/OSHA Web Reference:

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Guide to Cold Stress at Work

Advice On Risk Control Measures For Working In Hazy Conditions

Cold Weather Safety Program

ENVIRONMENTAL HEALTH AND SAFETY PERSONAL PROTECTIVE EQUIPMENT HAZARD ASSESSMENT AND CERTIFICATION GUIDELINES

SECTION 51 NFPA 70E POLICY. Health & Safety Policy and Procedures Manual

Management Plan for Electrical Safety ISD #535

Provided by. Personal Protective Equipment. Workers Health & Safety Division HS96-101C (07-04)

THERMAL COMFORT GUIDELINES

75 Years of Health and Safety Guidance

Does this topic relate to the work the crew is doing? If not, choose another topic.

Confined Space. Program Responsibilities

Printed copies of this document may not be current. Refer to SafetyNet (Domino.Doc) for the official, controlled version.

Safety Services Guidance. Hand Arm Vibration

HIGH-VISIBILITY APPAREL

Canadian Standards Association (CSA) Z Guideline on Selection, Care and Use of Protective Footwear

OFFICE OF STATE HUMAN RESOURCES

City of Turlock Heat Illness Prevention Procedures for Outdoor Work In accordance with Title 8 CCR Section 3395

COSHH Hazardous Substances Health & Safety Management Standard Issue 2 (September, 2010)

Standards of Practice Personal Protective Equipment

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

HAZARD RECOGNITION EVALUATION and CONTROL

NECA Personal Protective Equipment (PPE) Selector

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT FOR CHEMICAL EXPOSURES

General Requirements for Personal Protective Equipment

Objective: To set a Personal Protective Equipment (PPE) standard at all WFP manufacturing sites.

Manual Handling Procedure

HEALTH AND SAFETY MANUAL

RESPIRABLE CRYSTALLINE SILICA PROGRAM July 2018

PPE PERSONAL PROTECTIVE EQUIPMENT PROGRAM

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

a. identify hazardous conditions and potential accidents; b. provide information with which effective control measures can be established;

HAZARD RECOGNITION EVALUATION & CONTROL. Procedure No. HR-405-PR-2 Division Human Resources. Supersedes n/a Board Policy Ref.

PINNACLE OWNING SAFETY: Zero Fires Zero Loss Incidents 100% Employee Engagement

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

Personal Protective Equipment

BSO Plus ANNUAL SAFETY REFRESHER 2018

Doc #: 1000-AD Revision: - PERSONAL PROTECTIVE EQUIPMENT (PPE) SOP. Author(s): T. Lavoie/ M. Saucedo/ J. Dunlop/ Mtn.

Environmental Health & Safety Policy Manual

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents

Hazard Assessment & Control. Faculty of Veterinary Medicine

Control of Allergies to Laboratory Animals

Hand Safety. 1 Copyright 2014 by PEC Safety Management, Inc. PPT-SM-HNDSFTY 2014

Control of Vibration at Work

BP OIL -- TOLEDO REFINERY

WILTSHIRE POLICE FORCE PROCEDURE

Lockout/Tagout Safety Policy

Tioga ISD Athletic Department Heat Policy

Electrical. Version 1.0

Hand Arm Vibration Guidance. Kevin Burrows

Scissor Lift Safety Policy Training Course (GS600) Material

Lockout/Tagout - Energy Control Program

OSHA must prove. Confined Space Entry. Do you have an effective safety and health program? Some period of time later

GEORGIA DEPARTMENT OF CORRECTIONS Standard Operating Procedures IVN Authority: Effective Date: Page 1 of WETHERINGTON/HODGE 4/01/02 8

United Gas Derivatives Company UGDC. Guidance for the Selection and Use of Personal Protective Equipment (PPE) Procedure

EXPOSURE TO THE COLD. November 6, 2013

Heat Stress Prevention Written Program Laredo ISD Safety/Risk/Emergency Management Department

PERSONAL PROTECTIVE EQUIPMENT

Escondido Union High School District. Hazard Communication Plan

The Johns Hopkins University/The Johns Hopkins Hospital Health, Safety and Environment Manual Safety Policies:

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

Confined Space Program

Personal Protective Equipment Program

Staying Warm in the Winter

Personal Protective Equipment

Safe work method statements

University of Vermont Department of Physical Plant Personal Protective Equipment Program

Working Alone Safety Program

Recognition, Evaluation, and Control of Hazards

Managers and supervisors. 28/06/2016 Version number: v0


NUS Safety & Health Guidelines Procedure No: OSHE/SOP/GL/08

OSHA s Proposed Silica Rule Randy Nicholls Northwestern Energy

OKALOOSA COUNTY EMERGENCY MEDICAL SERVICES STANDARD OPERATING PROCEDURE Rehabilitation Sector Operations Policy:

Eye and Face Protection

Wildland Fire School. Heat Illness Prevention Program

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)

PERSONAL PROTECTIVE EQUIPMENT GUIDANCE

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide)

Personal Protective Equipment

ESSENTIAL SAFETY RESOURCES

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

Golden Rule #8: Equipment Safeguarding

A. Evaluation of the written program

Open toed shoes, sandals, or shoes made of loosely woven material should not be worn in the laboratory.

HEAT ILLNESS PREVENTION PLAN (HIPP) FOR. PAR Electrical Contractors Inc.

Department of Electrical Engineering & Computer Science. Electrical Safety. for Staff and Students in EECS Instructional Laboratories

How severely could the risk hurt someone? Low/Insignificant First aid

Laboratory Chemical Hygiene Plan

US Pipelines & Logistics Contractor Toolkit

Guidelines on Working in Cold Conditions Re-endorsed by Annual Conference 2017

1.1 Employees are required to wear mandatory and area / task specific PPE.

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC

Personal Protective Equipment Policy

BSO Plus ANNUAL SAFETY REFRESHER 2015

Transcription:

1.0 PURPOSE This standard supports the Occupational & Industrial Hygiene Policy and specifies the requirements for the SaskPower Working in Cold Conditions Plan. 2.0 DEFINITIONS 2.1 chill Refers to the combined chilling effects of wind and temperatures on humans. 3.0 METHOD / PRACTICE All will be performed within the OH & S Cold Condition Guidelines and in compliance with Saskatchewan Occupational Health & Safety legislation. (Exhibit A Work Warm Up Chart chill) A Working in Cold Conditions plan begins with the identification and assessment of cold exposure hazards in the place and providing appropriate controls. 3.1 Identifying Cold Exposure Hazards All tasks, assignments and circumstances where cold exposure hazards exist shall be identified via documented hazard identification and risk assessment. 3.2 Cold Exposure Control methods Where practicable cold exposure hazards shall be removed. Where cold exposure hazards cannot be removed controls shall be used to reduce exposure. o Engineering Controls are the preferred controls where practicable and include: Equipment Design such as covering metal handles/bars with thermal insulating material or designing machines and tools so that they can be operated without having to remove mittens or gloves. Heating Systems o Administrative Controls include: Using additional employees for the job. Ensuring that all employees and supervisors understand the signs and symptoms of cold exposure. Rotating employees into tasks and areas which expose them less to cold conditions. Pace the to avoid sweating. Acclimatization allow employees enough time to get acclimatized to cold and protective clothing before assuming a full load. Warm Up Breaks increasing the frequency and duration of warm up rest according to OH & S Cold Condition guidelines o PPE shall be used where engineering and administration controls do not effectively reduce the cold exposure hazard: Appropriate winter wear shall be worn where hazard identification and risk assessment identify the requirement. Winter wear shall be flame resistance and/or high visibility where hazard identification and risk assessment identify the requirement. It is preferable to establish layers of protection by combining the three control types.

3.3 Training Ru s shall provide information on the Working in Cold Conditions plan that includes: Hazards, signs and symptoms of cold exposure. Selection, use and maintenance of PPE and winter wear. Personal controls for ing in cold conditions. The use of tables and guidelines that determine requirements in cold conditions. Emergency supplies and equipment when required.. 4.0 REFERENCE The Saskatchewan Occupational Health and Safety Regulations, 1996. o Part III General Duties Section 12 General Duties of Employers. o Part VI General Health Requirements Section 70 - Thermal Conditions Section 70 o Saskatchewan Health & Safety Publication Cold Conditions Guidelines o Environment Canada Chill Calculation Chart SaskPower (located on SafetyNet) o Safety Rulebook o SaskPower PPE Policy o Job Hazard Assessment Policy o Hazard and Risk Assessment Standard o SaskPower Warm Up Chart - chill Relevant 3 rd party standards

SaskPower Work Warm Up Chart chill This chart contains the windchill values that correlate with the OH & S on page 2. Sunny sky Sunny sky Sunny sky 16 km/h (10 mph) 24 km/h (1 mph) 32 km/h (20 mph) Chill of Chill of Chill zero zero zero 37 to 39 41 to 43 44 to 47 48 to 0 7 2 39 to 42 3 43 to 4 4 47 to 49 3 41 to 43 4 4 to 47 minut es minut es of 4 1 and should stop 1 and should stop 49 and should stop

Printed on 10/13/09 at 1:32 PM SaskPower Work Warm Up Chart OH & S Guidelines The Work Warm-Up Schedule shows the warm-up needed for in cold conditions. It assumes that normal practice provides for in warm locations every two hours. Warm-up should begin when the temperature reaches -26 0 C (-1 0 F) with winds of 16km/h (10mph) or greater. In winter, Environment Canada reports Chill Factors and/or Equivalent Temperatures. If only this information is available, warm-up should begin when the wind chill reaches 170 watts per square metre (Equivalent Temperature of 32 ). All non-emergency should stop by the time the wind chill reaches 220 (Equivalent Temperature of 1 ) Work Warm-up Schedule for Outdoor Activities This information applies to any four-hour. Warm-up are assumed to provide 10 in a warm environment. These guidelines apply to ers wearing dry clothing. Sunny sky Air temperature No noticeable wind 8 km/h ( mph) 16 km/h (10 mph) 24 km/h (1 mph) 32 km/h (20 mph) zero * o F zero * of of of of of 26 to 28 1 to 19 normal 1 normal 1 7 2 4 29 to 31 20 to 24 normal 1 7 2 32 to 34 3 to 37 38 to 39 to 42 43 and 2 to 29 to 34 3 to 39 to 44 4 and 7 2 should stop should stop should stop should stop should stop * all temperatures are approximate Apply the schedule one step lower for with limited physical activity. For example, at -3 (- o F) with no noticeable wind, a er with a job requiring little physical movement should have a maximum of with four in a four-hour. Refer to "Domino.doc - Document Profile" for Document Management Criteria 4 of

Printed on 10/13/09 at 1:32 PM SaskPower Refer to "Domino.doc - Document Profile" for Document Management Criteria of