Rigging guide for the Swift Solo Volume 1 (mostly boat rigging)

Similar documents
Follow these easy steps to properly assemble your new Zim 420

TUNE YOUR SAILS SPEED

Club 420 Class Rigging Manual

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

ASSEMBLY MANUAL HOBIE CATSY

Tuning Guide January 2012

2012-June-12 SECOND DRAFT Hobie Getaway Spinnaker Installation Instructions

Pico rigging manual 2007.doc Page 1 of 28

Far East Boat Optimist Rigging Instructions

CII Rigging suggestions

Raider 16/Sport - Spinnaker Rigging. Rigging Spinnaker

A Basic Guide to Europe Dinghy Rigging

Ref :MMHC14SR_GB Emetteur :MF Date :Dec 2014 Revision : 1 Page 1/18. ASSEMBLY MANUAL : HOBIE CAT 14 Std & Race HOBIE CAT 14 STD & RACE

2. Note that the ropes from the rigging board are secured in the cam cleats of the jib fairleads.

Bladerider X8 Assembly Help Notes

J/22 Dave Perry. Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat

Table of content Introduction 5 1. Part 1. Assembly Tools needed for Assembly Glossary Hulls Mounting the beams 7

J/70 Building Specification

420 Rigging Guide.

FDR CHRYSLER 16' CATAMARAN (MUSKETEER) The initial rigging of a sailboat is not difficult, but if the boat is strange

Topaz OMEGA Rigging Instructions

Vanguard Sailboats 300 Highpoint Avenue Portsmouth, RI For the dealer nearest you call SAIL

Safety Afloat. Before you go sailing:

Weta Basic Rigging Guide

Wysiwig - Wayfarer Rigging Guide

INSTRUCTION NO

12.9 Gennaker. February Setting up and sailing with the 12.9 Gennaker

Dolly wheels in slot #8 for Boat #10.

F-27 RIGGING GUIDE EXTRACTED FROM ORIGINAL F-27 SAILING MANUAL

Highlander Specifications

HOW TO RIG A CORMORANT

OWNER S MANUAL. for Inters and Nacra F-18

Set-up and Tuning Notes: 17 September 2012

RIGGING: RS- Vision. 1. A properly derigged boat appears as below. Please note that the tiller extension is NOT bent.

International J/24 Class Rules Changes As approved by ISAF Effective 1 st April 2013

OPPI Rigging Guide 3/2008

Tuning C420 Sails By Brian Doyle and Dave Kirkpatrick

1 Tuning Platform Reseating Beam Pads Rudder alignment Noisy Foils Rig Tension...

STANDARD SPECIFICATIONS

Tube-on-tube to wire luff conversion by Rey Garza

TUNE YOUR SAILS SPEED. Optimist Tuning Guide. Photo Wavelength

Most sail with 5 or 6 in the boat. Here are the names I will use for the various positons (from the back forward):

ASSEMBLY MANUAL. Last up-date : January 2005 HOBIE MAX RACE

Hobie Island Spinnaker Instructions


Highlander Specifications (DRAFT UNAPPROVED)

RIGGING INSTRUCTIONS Let's assume that you have your boat on a trailer when you take delivery from your dealer.

Highlander Specifications

Melges 24 Sailing Guide

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide

COASTAL IN-BOOM FURLING SYSTEM. Installation Manual

T 10 Tacking Ver

CONTENTS. SB 3 Rigging Instructions

Bowsprit Hinge on "Bumble Chugger" By Robin Whittle, Shrimper 124 (Bumble Chugger) (Winter 2003)

OWNER S MANUAL OWNER'S MANUAL TABLE OF CONTENT. 1. Introduction. 2. EC Documentation a) Certificate of homologation b) Declaration of conformity

QuikVang. The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL D-30 MODEL D-40

Appendix 1: How To Install the Northeaster Dory Sailing Component Kit Upgrade

Viper 640 Tuning Guide

MUSTO PERFORMANCE SKIFF

3. Sail Kit. Table of Contents: Portland Pudgy Safety Dinghy: 3. Sail Kit

aero naut Order No. 3009/00

Sonar Tuning Guide. Jud Smith Tomas Hornos Send order forms to:

HOBIE CAT 16 Easy, Classic, Club & Race

TUNE YOUR SAILS SPEED. Viper 640 Tuning Guide. Rev. R03b

North Sails Seattle Thunderbird Tuning Guide

KNOTS. A very short guide to knotting terminology used on these pages.

OPERATIONAL CHECK LIST

LOOP KNOTS: A loop knot, like a hitch, fastens a rope to another object. A loop knot may be tied in the hand and then placed over the object, while a

MUSTO PERFORMANCE SKIFF

The M242 is a relatively easy boat to sail and the fleet has taken steps to make the boats as even as possible.

QuikVang. The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL A-8 MODEL A-12

HIGHLANDER TUNING GUIDE

M32 CATAMARAN ASSEMBLY MANUAL

Installing a Track-Mounted Whisker Pole

Seldén offer a full range of spinnaker equipment for keelboats. It consists of five aluminium pole sections, three carbon fibre sections, low weight

SHIELDS PARTS PRICE SHEET

Set Up for Epsilon, Z Spar, Needlespar & Goldspar Masts

INTERNATIONAL. 29er CLASS RULES. The 29er Class was designed in 1997 by Julian Bethwaite and was adopted as an ISAF International Class in 2001.

Rigging Manual V Unpacking and Preparation. Useful knots to know V15. Fogh Marine

COMMON MEASUREMENT PROBLEMS & SOLUTIONS JUNE 2011

TUNE YOUR SAILS FOR OUTRIGHT SPEED. Starling Tuning Guide Solutions for today s sailors

LITTLE TRI construction

Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.

SPARE PARTS WORKBOOK

Thistle Tuning Guide

TUNE YOUR SAILS SPEED

CONSTRUCTION OF A GUNBOAT A CLASS YACHT by Brian Dill

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

TOPAZ R2 Race+ TOPAZ R2 Race X Rigging Instructions

Place a rope coil here

Rhodes 19 Tuning Guide

HOBIE TEDDY ASSEMBLY MANUAL

CATBOX. A Puddle Duck Racer. By Jim Michalak

The Mirror, Rigging and Improving Performance. Series One, Basic Improvements

Wind Light Moderate Heavy Speed 0-8 mph 9-17 mph 18 + mph

ODOM CLASS SPECIFICATIONS

Rigging Manual. 1 Parts of the Hull. 2 Parts of the Sail. 3 Sunfish Mast Kit. 4 Bailer Installation. 5 Ratchet Block Installation

THE TRAMP Sailing Manual

An Australian Classic by spectre.com

Thank you for choosing a North Sails P Class Sail

Transcription:

Rigging guide for the Swift Solo Volume 1 (mostly boat rigging) Thanks to Greg Ryan for the drawing 5/28/2004 1

Index Page 3 Preface and Safety 4 Quick line measurements you ll need 5 Spinnaker pole launcher and halyard system 6 Pole launching portion of the Spin halyard 7 Spin halyard 8 Spin halyard 9 Spin halyard shock cord 10 Spinnaker pole tag line 11 Main/jib sheeting system 12 Sheeting 13 Mainsheet bridle 14 Tying the skiff knot 15 Splicing the single and doubletailed eye splice 16 Mainsheet transom bridle 17 Making up the mainsheet 18 Jib sheet 19 Jib sheet layout 20 Jib relativity control 21 Vang control 22 More Vang control 23 Making the vang 24 Vang lever 25 Vang pivot base 26 Vang pivot base 27 The vang swivel sleeves 28 Vang Arm 29 More on the vang arm 30 Cunningham 31 Adjustable jib tack 5/28/2004 2

Preface and Safety This manual is intended to help you get your Swift Solo systems running smoothly and to save you some money if you want to rig your own mast and boom. The parts and methods shown are only recommendations and not class requirements. Expect the highly innovative minds of our class to improve both the parts and the procedures for making them over the next several years. You are getting close to the day when building will end and sailing will begin at least until next winter. This is a good time to talk about safety. Several Do s and Don ts Do: Always wear a wetsuit (or drysuit) and a life jacket. The wetsuit will provide some body protection as well as protection from hypothermia. Sail only when someone else is in the vicinity that can help you if you become disabled. Maintain the water integrity of your air chamber. Keep your main and jib halyards where they are easily accessed in the event that you need to lower the sails. Have a plan in your mind for using the spinnaker sheets as a tow line. Be prepared to accept this boat as a challenge. It will take several days on the water to cross the threshold from fear to fun. If you stick with it, you will cross that line quickly. Read the how to instructions on the website (to be published by March of 2004) Don t Go sailing is heavy winds until you ve worked your way up the wind scale by sailing regularly in lighter air. If you are determined to push your personal limit, have a rescue boat go out with you and wear a helmet. Go sailing without checking all fittings and shackles to determine that they have remained tight. Sail this boat if you have a serious heart condition. You will be pushed over your anaerobic threshold many times during the learning process as you work up the wind range. 5/28/2004 3

Quick line measurements you ll need ( raw means cut the piece that long to start with splices will ultimately make it shorter) Spinnaker sheets 38 feet Mainsheet (Maffioli) 14 feet, lightning rope raw = 31 feet (mark and fork at 23 feet and 8 feet) Main halyard raw 21 2 long eye and splice takes 9 Main halyard tail raw 20 Jib halyard raw 15 6 Jib halyard tail raw 13 Trapeze wires raw 14 Spinnaker halyard raw 65 with 40 of cover Cap shrouds raw 265 Primaries raw 176 Lowers raw 60 Transom bridle raw 5/28/2004 4

Spinnaker pole launcher and halyard system Halyard cleat Halyard leaves the mast butt Floating double block Cheek block The spinnaker pole on the Swift is launched automatically when the halyard is pulled to hoist the spinnaker. The pole is retrieved by the tack tag line which pulls the pole inward with the tack of the kite as it is pulled back into the spinnaker sock Ignore this we don t use it anymore 5/28/2004 5

Pole launching portion of the Spin halyard Notice shock cord! We ll cover that in a minute Double block Deadeye Starting at the dead eye just aft of the launcher on the starboard side the line goes through the special floating double block and then turns forward to the cheek block shown in the picture below. It then goes to the inboard end of the pole as shown in the picture on the right. Replace this with a simple hole in the side of the pole As an alternate method, you can simply drill a small hole about a half inch from the end and run the line thru and tie off with an figure eight knot (to keep it from pulling through) Here you see the cheek block where the lines turns aft to the aft end of the pole (above right) 5/28/2004 6

Spin halyard Back to mast To halyard cleat The spinnaker halyard leaves the front of the mast and goes forward to the floating double block (picture to the right) The halyard then goes aft to the cleat and the hoisting block (below left) Forward to floating block After the halyard leaves the hoisting block it goes to the transom floating block (picture on the next page). The relative location of this cleat and the hoisting block must be precise Notice the shock cord headed aft to the The relative position of the halyard cleat transom cheek block and the sheave is critical. This system and then to the cleats and un-cleats automatically when transom floating block you hoist and douse the kite. 5/28/2004 7

Spin halyard Transom cheek block Transom floating block From the floating block the halyard goes forward to the retrieving block (below). Notice the shock cord Here you see the retrieving block and the halyard entering the spinnaker sock. The halyard goes through the spinnaker sock and attaches to the spinnaker retrieval patches. 5/28/2004 8

Spin halyard shock cord The blue shock cord is tied to the bolt in the mast step (forward of the mast). It then goes through the becket on the big double floating block and goes aft. Here you see the shock cord passing the halyard cleat and continuing aft. Here you see the transom fixed cheek block where the shock cord turns forward and ties to the floating block. 5/28/2004 9

Spinnaker pole tag line This line ties to the tack of the spinnaker and goes through the center of the pole aft to the bolt at the mast base. That s all there is to it This is the same line that is highlighted below Forward end of spinnaker pole Forward to go inside of pole 5/28/2004 10

Main/jib sheeting system You have one of these cleats on each side of the boom as shown below. This is where it starts. The main/jib sheet (we ll call it the main sheet) is hanging from the cam cleat on the other side. You can see the mainsheet going forward where it will enter the boom below This is what this cleat and block look like from below. You will find construction instructions later in this manual Here you see the mainsheet entering the boom through the thru deck block. After entering the boom the sheet splits in two. One of the 1/8 th inch sheets goes to the end of the boom, through a swivel base block and to the mainsheet bridle where it is tied off. 5/28/2004 11

Sheeting This eye spice is made by inserting each end inside the core for a short distance The mainsheet where it exits the swivel base block and ties to the bridle. Notice the stainless ring that acts to keep the slack side of the bridle out of the water Here you see the cheek block on the outer end of the boom for the jib sheet. The jib sheet turns back forward to the front of the boom After leaving this swivel base block the jib sheet goes to another swivel base block on the deck at the foot of the mast (this is an old style aluminum boom) 5/28/2004 12

Mainsheet bridle When you splice the bridle terminal keep the tail long and leave it outside. You now have an adjustable bridle that is easy to deal with. This is a good thing on most of you eye terminals A very simple and effective knot that you should use in place of a bowline most of the time is the skiff knot. Simply tie an overhand knot if the end of the line, then tie another overhand knot cinched up to the first knot. This is an easy knot to untie and uses a minimum of distance. Here you see the first overhand knot. See next page for instructions. 5/28/2004 13

Tying the skiff knot Step 1 Step 2 Step 3 Step 4 Step 5 This is a knot that you ll learn to trust and use most of the time in place of a bowline. It is also the best way to terminate shock cord 5/28/2004 14

Splicing the single and double Step 1 insert wand tailed eye splice No skiff sailor should be without this splicing wand (you can get it from Fisheries Supply. It is for 3/16 to 3/8 rope but it works great for 1/8 Lightening rope or PBO Single tailed eye splice (typical) Step 2 insert end into loop Step 3 tuck end into wand and pull loop tight Step 4 pull line through Step 5 at this point you can either leave the end out and leave it adjustable Or you can pull it inside for a clean eye splice 1. Find the middle of your line and insert the wand for ½ Double tailed eye splice (used on the transom bridle and righting lines) 2. Pull the tail thru 3. Insert the wand for ½ in the other line 4. Pull the other tail through and the two splices tight 5/28/2004 You can now pull on either tail without the splice slipping 15

Mainsheet transom bridle Cut a piece of lightning rope 11 feet long and put a double tailed eye splice in the middle. From the top of the eye splice measure down each leg 40, and 46 inches and make marks. Insert the wand in the highest mark and exit at the 46 inch mark. Pull the tail through and put knots in the end to keep the from pulling through. Single adjustable eye splices allow you to adjust the bridle length. When sailing the lower leg should never be tight except in very light air (or when pinching someone off your weather quarter after the start). Double tailed eye splice 5/28/2004 16

Making up the mainsheet Start by burning the end of the Mafioli to keep it from fraying. Insert the wand about 2 and pull 8 feet of the 31 feet of lightning rope through. Make 4 loose wraps and pull the end back through from the opposite side of the Mafioli. Work the loops up tight while pulling both ends. Use heat shrink tubing to cover the splice. A 14inch strap with a loop in one end is used to attach the mainsheet and vang to your harness. The Velco closure allows it to come free with any significant amount of pull. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 5/28/2004 17

Jib sheet Hiding behind the jib track is the jib swivel base block that is attached to the deck. Here the sheet (blue) heads for the floating blocks just off of the launcher throat. On the right hand side you can see the final block of the system just before it attaches to the jib clewboard. bow Becket block and final sheet to traveler Jib sheet coming from the base of the mast Are you still with me?. Throw the ball you idiot!! 5/28/2004 18

Jib sheet layout 5/28/2004 19

Jib relativity control Here you see the four primary blocks of the relativity control. The two forward block have the aft screws missing because they will be screwed into the spinnaker sock to help lock it in place. These two lines are spliced together just aft of the edge of the picture. They continue aft to the double tailed eye splice and block shown in the picture on the right. The red relativity control lines leave this block and go to bevel base on the side of the CB trunk where they turn (more blocks) and head to the clam cleats on each side. 5/28/2004 20

Vang control Vang pin Vang lever Vang arm Vang pivot base The yellow line at the top of the vang lever is tied to the eye strap on the mast that holds the turning block. After going through the block at the end of the lever, it goes back through the turning block and to a block on the mast step pin at the base of the mast. 5/28/2004 21

Vang control In this case the line is blue (you can see where it s cover starts just aft). This block is shackled to the mast base pin. This line simply goes aft to the vang pedestal swivel base and cleat and out to the velcro strap that attaches the mainsheet and the vang to your harness. The cleat on this swivel base was extended away (doubling the distance) from the eye with a piece of carbon fiber/s-glass plate. This works much better than the standard unit. 5/28/2004 22

Making the vang Above is the high tech, lightweight vang arm and lever that you can make. We use the solid vang system because we must keep the boom from rotating in order for our sheeting system to work (the cleats in the same place). Below is the vang pivot base that the other bolt in the vang arm fastens to on the mast. Pivot pin 5/28/2004 23

Vang lever This lever should be made of 12 layers of s-glass with a layer of uni carbon on each side covered with another layer of s-glass. The shape of the lever keeps it fro hanging up while passing through the vang arms. This hole is for the lever top block This hole if for the bolt that fastens the lever to the vang arm unit This hole is for the bolt the fastens the lever to the swivel arms 5/28/2004 24

Vang pivot base Use a piece of 1/4 plywood about 10 inches wide to form the swivel base over. After sanding a nice radius on the top edge, cover it with a 20 wide piece of mylar and staple along the bottom edge. Drape eight 16 inch wide pieces of s-glass followed by a layer of carbon and another layer of s-glass. Cover it with peel ply and mylar and clamp a piece of plywood on each side while being careful to keep the material tight on the top radius Plywood covered with mylar This is the vang pivot base. 5/28/2004 25

Vang pivot base After the layup has cured, remove it from the plywood and cut it to the shape shown below. Bond the pivot sleeve inside of the front radius. Later, you will need to drill this sleeve to oversize it a bit for a 3/16 pin bond a stainless 3/16 ID sleeve inside the cheeks against the radiused front. This is a 3/16 pin 5/28/2004 26

The vang swivel sleeves These sleeves are made by using a piece of 2 1/4 aluminum as a mandrel. Wrap it with a 60 long piece of s-glass about 4 wide and after three wraps inset a 5 piece of 3/16 stainless tube parallel to the mandrel. Use some silica filler on both side of the tube and continue wrapping. Prior to the last couple of wraps, insert 2 2 wide pieces of carbon uni about 12 long and finish wrapping the s-glass with at least one layer over the carbon. Remove the piece and cut 1 1/5 out of the back (adjacent and parallel to the tube). Cut into two finished pieces 1 ¼ wide. Plexus and rivets work well for bonding to the mast 5/28/2004 27

Vang Arm On the bottom is the mandrel for making the vang arm (top). Made of 1 thick wood it is coated with epoxy and epoxy with graphite powder and wet sanded smooth. It is 39 inches long and tapers from 2 ¼ to 3/8. It has a ¼ radius on the top corners. On top is the actual part. It is 36 long with hole centers at 34 3/8. It is made by cutting pieces of cloth that are 39 inches long, 5 wide on one end and 3 on the other. Lay a piece of clear plastic on you flat clean table and begin the lay-up with a layer of s-glass followed by a layer of hybrid with the carbon the long way followed by six layers of s-glass, followed by another layer of hybrid (run the same way) followed by another layer of s-glass. Place another piece of clear plastic over the 10 wet layers, center the mandrel on the layup, brace the mandrel with pressure off of the ceiling with some properly cut 1x4 s. Next, pull the plastic up on the sides of the mandrel and place some 1 thick pieces of wood on each side to hold the plastic and wet layup against the sides of the mandrel. While holding the plastic tight, clamp the two 5/28/2004 pieces of wood across the mandrel and leave until the parts has cured. 28

More on the vang arm I like to have two holes on the lower end to allow for some adjustment This cut out is for the boom and for mainsheet below it to pass through This slot is cut approx 5/16 wide for the vang lever and the larger hole on the end is to allow the block (sheave) on the end of the lever to pass through 5/28/2004 29 See vang control page for more details

Cunningham These cheeks are an integral part of the cunningham system on the Swift since they distribute the load from the over a broad area. You can see the lines attached on the bottom that pull down on the cheeks. This entire system is designed to bend the mast without adding much leech tension (for de-powering) bow The cunningham control lines go aft from the base of the sail to a floating bullet block and then through the bevel base cheek blocks out to both sides You can see the cunningham in this picture. It is led to both sides 5/28/2004 30

Adjustable jib tack This cheek block is bolted through the forestay fitting to an eye strap on the other side. The tack line comes up through this block, through the eye on the bottom of the jib, and back down to the eye strap where it ties off. The other end goes aft (under the sock) where it ties to a floating bullet block, splits and goes through blocks at the base of the mast before heading outward to the clam cleats This jib tack line, when used in conjunction with the halyard, allows you to change both the luff and the leech 5/28/2004 tension of the jib 31