SECTION SWIMMING POOLS

Similar documents
IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

SECTION DOMESTIC WATER PIPING

SECTION SHOWER AND BATH ENCLOSURES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

Swimming Pools, Hot Tubs and Spas

1 Exam Prep NSF/ANSI Tabs and Highlights

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.

SECTION BUTTERFLY VALVES

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (.

Swimming Pool IAQUALINK WEB CONNECT

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

City of DuBois PERMIT APPLICATION P. O. Box 408, 16 West Scribner Ave - DuBois, PA Phone: Fax:

VILLAGE OF ISLAND PARK LOCAL LAW NO. 12 OF THE YEAR A local law Private Swimming Pools

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

Piped Air SCBA Refilling System Standard

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

Section GATE VALVES

Component Certification Specification for Floatation or Sensory Deprivation Systems and Related Equipment (CCS-12804)

Spas Hotels/Resorts Apartments & Condominiums Campgrounds Health Clubs Medical Clinics Waterparks

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE

Summary of Substantive Changes between the 1999 and the 2014 editions of ANSI/APSP/ICC 3 Permanently Installed Residential Spas

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Florida Department of Health Guideline for Routine Inspection Checklist

SECTION PRESSURE TESTING OF PIPING

Swimming Pool Requirements

Check with local zoning official for property line distance requirements.

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

SWIMMING POOL, SPAS, HOT TUB REQUIREMENTS AND GUIDELINES (Updated 3/2018)

RESIDENTIAL SWIMMING POOL REQUIREMENTS

CITY OF CORNER BROOK SWIMMING POOL REGULATIONS

Swimming Pool Requirements Packet

New England Municipal Building Officials Preventing Drowning and Suction Entrapment through Code Compliance

Pool / Hot Tub Permit

SITE WATER UTILITY DISTRIBUTION PIPING

SECTION CLIMBING WALLS. PART 1 GENERAL 1.1 SUMMARY A. This section includes the following:

Summary of Substantive Changes between the 2003 and the 2014 editions of ANSI/APSP/ICC 1 American National Standard for Public Swimming Pools

SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

Gas Injection Systems

Private Swimming Pool Permit Application

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

GENERAL AND STRUCTURAL DESIGN; EQUIPMENT STANDARDS. (i) Constructed of materials which are considered to be nontoxic to humans and the environment;

Saskatchewan Health S A WHIRLPOOL DESIGN/OPERATIONAL T C H E W STANDARDS. Updated 02/00

$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

Accu-Tab Systems 2000 P Series by Axiall Corporation

PART 1 GENERAL..2 Components of the gas chlorination system include, but are not limited to the following:

Acid- Rite ph Adjustment System 2500 by Axiall, a Westlake Company

Swimming Pool Requirements

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT

Section GAS CHLORINATION SYSTEM

SPECIFICATIONS - DETAILED PROVISIONS Section Butterfly Valves C O N T E N T S

Florida Senate SB 1694 By Senator Haridopolos

Vertical and Horizontal Bladder Tanks

Moai Bike Rack Heavy Duty Submittal Sheet. Materials: 2.0 Schedule 40 Pipe (2.375 OD) Finishes: Capacity: Mount Options: Setbacks: 2 Bikes

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

SWIMMING POOL REQUIREMENTS

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014

Made in U.S.A. Narrow-U Bike Rack Heavy Duty Submittal Sheet. Materials: Finishes: Mount Options: Setbacks:

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

AWWA C504 COMPLIANT VALVES FROM 3 THRU 108

HYDROSTATIC LEAK TEST PROCEDURE

REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING

Copies of your pool operator certificate as well the operating permit must be posted at the pool. The operator s certificate is your certificate that

POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS

TECHNICAL DATA. Trimpac 251a. Spetember 16, 2013

Chapter 10 SWIMMING POOLS

HIGH PERFORMANCE POOL & SPA PUMPS

PUBLIC SPA CHECKLIST. Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

CARTRIDGE FILTERS. Models: CF50, CF75, CF100, CF150,

Instructions for Installation, Use and Maintenance FSI Safety Tank Shower Systems

1. Section Summary for loose climbing equipment provided by Owner. 2. Section "Cast in Place Concrete"

TECHNICAL DATA. Trimpac 244a. September 16, 2013

VERSION 1 SUMP PUMP PIT UNIT KAWAMOTO PUMP ASIA CO.,LTD.

1 & 3 Meter Tower CAT 1M 203R RIGHT MOUNT CAT 3M 203R CAT 1M 203L LEFT MOUNT CAT 3M 203L CAT 1M 203D DUAL MOUNT CAT 3M 203D

Eaton Filtration, LLC

After filling the pool with clean water in the summer, two basic factors can take place due to the exposure of water to the sun and the air.

SWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS

Swimming Pool Plans and Specification Report

MDX² INSTALLATION MANUAL (RETROFIT FIBERGLASS, VINYL & CONCRETE POOLS WITH MDX)

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS

1 Exam Prep State Pool Contractor Feedback Questions and Answers

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

Office Use Only Fee Paid

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

Accu-Tab Systems 1000 Series by Axiall Corporation

Whitehall Township Swimming Pool, Spa and Hot Tub Code Guide

Welcome to the PMG Educational Program. Sponsored by:

CLEANING, INSPECTION, AND TESTING OF SEWERS

5. Clearances- Fingerprinting and Training Requirements. 7. Record Keeping and Reporting Responsibilities

TOWNSHIP OF DOURO-DUMMER BY-LAW NO

TOWN of CHEEKTOWAGA Permit Application for Swimming Pools, Hot Tubs, or Personal Spas

Transcription:

SECTION 13 1100 SWIMMING POOLS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pool shell. 2. Pool mechanical system. 3. Pool heating system. 4. Interior pool finish. 5. Final testing and demonstration to Owner. B. Related Sections: 1. Division 01: Administrative, procedural, and temporary work requirements. 2. Section [03 3000 - Cast-in-Place Concrete:] [ - ]: Concrete [floor] [and] [deck]. 3. Section [ - ]: Water supply. 4. Section [ - ]: Drainage system. 5. Section [ - ]: Power supply. 1.2 REFERENCES A. American National Standards Institute (ANSI): 1. A108/A118/A136.1 - American National Standard for Installation of Ceramic Tile. 2. Z124.7 - Prefabricated Plastic Spa Shells. B. American National Standards Institute/National Spa and Pool Institute (ANSI/NSPI) ANSI/NSPI 1 - American National Standard for Public Swimming Pools. C. American National Standards Institute/American Society of Mechanical Engineers (ANSI/ASME) A112.19.8 - Suction Fittings for Use in Swimming Pools, Wading Pools, Spas, and Hot Tubs, Includes Addenda A. D. American Welding Society (AWS) D1.6 - Structural Welding Code - Stainless Steel. E. ASTM International (ASTM): 1. D1784 - Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds. 2. D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120. 3. D2564 - Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems. 4. D2855 - Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings. F. Federation International de Natation (FINA). G. International Association of Plumbing and Mechanical Officials (IAPMO). H. National Fire Protection Association (NFPA) 70 - National Electric Code. I. National Collegiate Athletic Association (NCAA). J. National Federation of State High School Associations (NFSHSA). Bradford Products LLC 13 1100-1 Swimming Pools

K. National Sanitary Foundation/American National Standards Institute (NSF/ANSI) Standard 50 - Circulation System Components and Related Materials for Swimming Pools, Spas/Hot Tubs. L. United States Swimming (USA Swimming). 1.3 SYSTEM DESCRIPTION A. Pool Walls: Stainless steel with PVC-P sheet finish. B. Gutters: Stainless steel. C. Surge Tank: [Stainless steel.] [Cast-in-place concrete per Section [03 3000.] [.]] D. Pool Floor: Cast-in-place concrete per Section [03 3000] [ ], conforming to industry standards for pool construction. 1.4 SUBMITTALS A. Submittals for Review: 1. Shop Drawings: a. Show pool layout, dimensions, wall and floor panel layout, and stiffeners. b. Include diagrammatic layout for equipment, piping, and surge tank. c. Show termination and finish details for interface with adjacent construction. d. Bear seal and signature of Registered Professional Engineer, licensed in State in which Project is located. 2. Product Data: Manufacturer s descriptive data for: a. Piping. b. Filters. c. Pumps and strainers. d. Heaters. e. Chemical controller, feeder, and storage tank. f. Valves. g. Gauges, thermometers, and flow meters. h. Inlets and gratings. 3. Samples: 12 x 12 inch pool membrane samples [in specified color.] [showing available colors.] 4. Performance Criteria: For products specified by performance criteria only, document conformance with design calculations or past performance records with list of previous installations and contact information. B. Quality Control Submittals: 1. Certificates of Compliance: Submit certification that pool system complies with requirements of applicable codes, ordinances, rules, and regulations, ANSI Z124.7, ANSI/NSPI 1, and ANSI/ASME A112.19.8. C. Closeout Submittals: 1. Operation and Maintenance Data: Include data for pool, pool equipment, and pool membrane, and warranty information. 2. Project Record Documents. 3. Owner s Certificate of Instruction. 1.5 QUALITY ASSURANCE A. Pool Shell and Equipment Manufacturer Qualifications: 1. Minimum [5] [ ] years experience in work of this Section, or successful completion of minimum [5] [ ] projects of similar scope and complexity within past [5] [ ] years. 2. Manufacture all stainless steel components in-house. 3. Provide factory-trained personnel on-site before and during pool installation. B. Pool Shell and Equipment Installer Qualifications: Swimming Pools 13 1100-2 Bradford Products LLC

1. Minimum [5] [ ] years experience in work of this Section, or successful completion of minimum [5] [ ] projects of similar scope and complexity within past [5] [ ] years. 2. Trained by manufacturer of pool system or manufacturer s representative. C. Pool Membrane Manufacturer Qualifications: Minimum [25] [ ] years experience in production of reinforced PVC-P membranes. D. Pool Membrane Installer Qualifications: 1. Technicians: Certified by membrane manufacturer to minimum of Level 1 certification. 2. Superintendent: Minimum [5] [ ] years experience in installation of PVC-P pool linings or successful completion of minimum [5] [ ] previous projects. E. Regulatory Requirements: Perform work in accordance with applicable codes, ordinances, rules, and regulations. F. Pool Equipment System: 1. Tested to NSF/ANSI 50. 2. [Bear NSF Approval Rating.] 3. Tested to ANSI/NSPI 1; certified by IAPMO. G. Pool Membrane and Accessories: Furnished by single provider. H. Pool Targets and Markings: In accordance with [FINA] [NCAA] [NFSHSA] [and] [USA Swimming] requirements. I. Pre-Installation Conference: 1. Convene at site [2] [ ] weeks prior to beginning work of this Section. 2. Attendance: Architect, Contractor, pool installer, [pool manufacturer s representative,] and related trades who s work affects pool installation. 3. Review and discuss: Scheduling, delivery, installation, protection, and related work. 1.6 DELIVERY, STORAGE AND HANDLING A. Store pool system components off ground and protect with weatherproof covering. B. Protect piping and accessories from exposure to ultraviolet and from contact with chemicals that could cause damage or deterioration. 1.7 WARRANTIES A. Furnish pool system manufacturer s 25 year warranty providing coverage for: 1. Workmanship, materials, and performance of pool wall and gutters. 2. Structural stainless steel bracing system, stainless steel gutter, stainless steel skimmer, and stainless steel wall panel systems against structural failure. B. Furnish pool membrane manufacturer s 10 year warranty against water leakage through membrane. PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Contract Documents are based on products by Bradford Products LLC. B. Substitutions: [Under provisions of Division 01.] [Not permitted.] 2.2 MATERIALS - POOL STRUCTURE A. Stainless Steel: ASTM A240, Type 304L, except Type 316L where in contact with water. Bradford Products LLC 13 1100-3 Swimming Pools 05/12/09

B. Fasteners: Stainless steel. 2.3 MATERIALS - POOL MEMBRANE A. Pool Membrane: 1. Type: Reinforced PVC-P. 2. Source: DLW Delifol by Desso DLW. 3. Thickness: Minimum 60 mils for sides and floor; minimum 80 mils for slip-resistant areas. 4. Surface finish for slip-resistant areas: Pyramidical embossed; dimpled or random pattern embossed not acceptable. 5. Color: [.] [To be selected from manufacturer s full color range.] B. Separation Layer: Sanitized, precompressed, resistant to bacteria and free from materials that could damage membrane. C. Compound Sheeting Profiles: Hot-dip or stainless steel sheet with PVC-P membrane coating on one side, or PVC strip. D. PVC Solution: Same color as pool membrane. E. Adhesive: Type recommended by membrane manufacturer; dated within 6 months of installation date. F. Silicone: Single component, same color as pool membrane. G. Sanitizing Agent: Not harmful to environment or PVC-P membrane, and highly resistant to bacteria and fungus. H. Rivets: Stainless steel. 2.4 ACCESSORIES A. Tile: 1. Type: [Frostproof ceramic.] [Frostproof porcelain.] [Glass.] [.] 2. Source: [ ] by [ ]. 3. Size: [ x ] inches by [ ] inch thick. 4. Color: [ ]. B. Tile Setting Materials: 1. ANSI A118.3, epoxy type, as manufactured by Laticrete International, Inc. 2. Grout: Sanded type, [ ] color [to be selected]. 2.5 EQUIPMENT A. Filtration and Sanitation System: 1. Provide complete filtration system with all components. 2. Include pumps, filters, flow meters, gages, valves, and controls as required. 3. Provide surge tank sized to pool capacity. B. Pumps and Motors: 1. Type and capacity as dictated by pool design to meet required flow rate. 2. Filtration pumps: Sized to pool capacity. 3. Motors: a. Totally enclosed, fan-cooled (TEFC) or open drip-proof (ODP), with hygroscopic insulation, service factor 1.15, insulation Class F, sized to operate at full load and speed, designed for continuous operation. b. Motor starter with current interrupter overload. c. Combination motor starters: Hand-off auto switch and positive overload heater coil; as manufactured by Furnas, Square D, or Westinghouse. Swimming Pools 13 1100-4 Bradford Products LLC

d. Electrical enclosures: NEMA 12 type, suitable for surface mounting. C. Heater: [Electric] [Gas] [Heat exchanger] type, sized to suit pool capacity. D. Valves and Piping: 1. Piping: Polyvinyl chloride (PVC) composition; ASTM D1784 or ASTM D1785, Schedule 40 or 80. 2. Cement: ASTM D2564. 3. Provide check and ball valves as required; by same manufacturer when practical. 4. Valve connections: Suitable for connection of adjoining pipe; of pipe size values. Provide lever or ball valves up to 4 inch diameter. 5. Hangers and supports: Sized to project conditions. E. Pool Fittings: 1. Compatible with pool system components. 2. Sized to code requirements; ensure proper hydraulic balance. 3. Stainless steel skimmer: NSF approved. 4. Gutters: 12 gage Type 316L stainless steel with continuously welded joints, with drop-out boxes and fittings sized to pool size. 5. Main drains and weep boxes: Type 316L stainless steel, sized to pool size. 2.6 FABRICATION A. Fabricate interior of pool using manufacturer s standard processes and quality control. B. Perform welding using AWS certified welders in accordance with AWS D1.6. C. Utilize Type 316L stainless steel filler metal at welded joints to produce uniform raised weld. Do not grind raised welds. D. Wall Panels: 1. Precision fabricated for welded installation or for established bolted panel design. 2. Cut perforations for skimmers, lights, and fittings into panels using CNC laser technology. 3. Support panel-to-panel joints using prefabricated support brace manufactured from 12 gage stainless steel. 4. Prevent dissimilar metals from direct contact with stainless steel components. 5. Support bolted panels on stainless steel base support. 6. Bolted panel design: Utilize 14 gage stainless steel base frame. 7. Bolted construction: Utilize 14 gage stainless steel K-bracing. 8. Through-wall fittings: Plastic type. E. Floor Construction: Cast-in-place concrete. F. Stainless steel wall stiffeners designed for maximum structural rigidity. PART 3 - EXECUTION 3.1 INSTALLATION - POOL SHELL AND EQUIPMENT A. Install equipment and system in accordance with manufacturer s instructions and approved Shop Drawings. B. Perform welding using AWS certified welders in accordance with AWS D1.6. C. Set equipment on secure foundations. D. Make piping joints in accordance with ASTM D2855. E. Support overhead piping and at connections to valves, pumps, and equipment to industry standards. Bradford Products LLC 13 1100-5 Swimming Pools 05/12/09

F. Install electrical components in accordance with NFPA 70. G. Install tile in accordance with ANSI A108.6, thin set with epoxy adhesive. 3.2 INSTALLATION - POOL MEMBRANE A. Inspect pool walls and floors; remove burrs, peaks, and projections that could damage pool membrane from walls and floors. B. Treat entire pool surface with sanitizing agent. C. Install compound sheeting and termination strips using rivets spaced as directed by manufacturer. D. Place separation layer on full adhesive bed. Butt joints to maximum 1/8 inch gaps; overlapped seams not acceptable. E. Install pool membrane system in accordance with manufacturer s instructions and approved Shop Drawings. F. Place sheets on walls horizontally without visible seams. G. Place sheets on floor lengthwise to pool. Lap pool floor sheet over wall sheet. H. Cover stairs and entry ramps with pool membrane; use slip-resistant material for non-slip areas. Use dark, contrasting color for steps. I. Lap membrane minimum 2 inches and hot air weld. After cooling, check seams using round-edge probe. Reweld defective seams. J. Clean seams using denatured alcohol and seal with PVC solution. K. Seal top edge of membrane at gutter using silicone paste. L. Weld targets and markings in place. M. Not Acceptable: 1. Visible patches. 2. Fully adhering membrane sheet to separation layer. 3.3 FIELD QUALITY CONTROL A. Piping Testing: 1. After installation and before covering piping, test to minimum 20 PSI pressure for 12 hours. 2. If necessary, repair leaks and retest. Do not cover piping until proven watertight. 3. Furnish test results prior to covering piping. B. Flushing: Flush completed piping with clean water prior to making final connections. C. Water Treatment: 1. Submit chemical analysis of source water supply showing: a. Total alkalinity in PPM. b. Calcium hardness in PPM. c. Chlorine in PPM. d. ph. 2. Treat and balance pool water just prior to Substantial Completion. a. Establish total alkalinity of 80 to 150 PPM and calcium hardness of 175 to 250 PPM. b. Balance pool water to local health code requirements. Swimming Pools 13 1100-6 Bradford Products LLC

3.4 ADJUSTING A. Adjust pool system for proper operation through all cycles. 3.5 CLEANING A. Clean pool, equipment, and related surfaces. 3.6 DEMONSTRATION A. Demonstrate proper operation and maintenance of pool system to Owner. END OF SECTION Bradford Products LLC 13 1100-7 Swimming Pools 05/12/09