Sound Transit Permit Parking Program

Similar documents
SOUND TRANSIT AT A GLANCE

CENTRAL AND EAST CORRIDORS

Transportation 2040 Update: Travel Trends. Transportation Policy Board June 9, 2016

Bellevue Chamber of Commerce, Transportation & Public Affairs Committee meeting. July 12, 2016

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE

2010 Regional Bicycle and Pedestrian Count Report

Interim Transit Ridership Forecast Results Technical Memorandum

Aurora Corridor to E Line

Sound Move. Appendix C:, J?enefits, system use and transportation impacts of Sound Move. Launching a Rapid Transit System for the Puget Sound Region

Sound Transit Financing and 3-County Road & Transit Funding

PROJECT OVERVIEW. Auburn Station Access Improvements Project

SOUNDCAST CALIBRATION AND SENSITIVITY TEST RESULTS (DRAFT) TABLE OF CONTENTS. Puget Sound Regional Council. Suzanne Childress.

Sounder Stations Access Study

Transit Development Plan and 2009 Annual Report

Transportation Master Plan Advisory Task Force

BEAR CREEK PARK AND RIDE

Transportation, Parking & Roads

DRAFT SYSTEM PLAN MAP KEY BRT STATION EXISTING FACILITY. Burien TC

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

PASSENGER SURVEY RESULTS

A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study

Pocatello Regional Transit Master Transit Plan Draft Recommendations

DIRECTION REGARDING WEHO PEDALS BIKE SHARE PROGRAM AND DOCKLESS BIKE SHARE PILOT MAYOR PRO TEMPORE JOHN D' AMICO COUNCILMEMBER LAUREN MEISTER

City of Davenport CitiBus Public Transportation Study. April 2015

Pilot Programs Qualified Veteran Free Fixed Route & HOV/HOT Lane Usage

Cheryl Thole CUTR/NBRTI, Senior Research Associate Tampa, Florida

Dear City Council Members,

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services

Arterial Transitway Corridors Study

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Arterial Transitway Corridors Study. Ave

1999 On-Board Sacramento Regional Transit District Survey

Transit Operations in the I-95 Express Lanes

Title VI Fare Change Equity Analysis

Progress Report Capital Programs Support

Transportation-Demand Management Community Presentation

Washington DC Section of ITE Project Briefing

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Bicycle Master Plan Goals, Strategies, and Policies

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

Service Proposal for the City of Ashland, Oregon

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

The Who and What: Bus Rapid Transit Riders and Systems in the U.S.

How familiar are you with BRT?

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

Tolling Study. July 23, 2009

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Sustainable Transportation Plan Draft 4/24/2012

DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY

I-635 LBJ EAST PROJECT

TRANSPORTATION MANAGEMENT PLAN MAY 2018 DRAFT

TORONTO TRANSIT COMMISSION REPORT NO.

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

Key objectives of the survey were to gain a better understanding of:

Commuter Credits Pilot Project

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Calgary Transit Route 302 Southeast BRT Year One Review June

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

MTP BICYCLE ELEMENT UPDATE. November 2017

February 4, Community Meeting August 2, :30 6:10 Presentation

Downtown Tampa Parking User Survey

PEDESTRIAN ACTION PLAN

City of Vestavia Hills Traffic Calming Policy for Residential Streets

Project Introduction January 2017

Working with School Bus Operators to Provide Community Transportation

TRANSIT & NON-MOTORIZED PLAN DRAFT FINAL REPORT Butte County Association of Governments

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

Priced Managed Lanes in America. October 2013

4 Ridership Growth Study

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Overview of Pulse BRT and transit network redesign

Strategies to keep people and goods moving in and through Seattle

Chapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.

Swift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit

Next Steps Staff report to Council on October 2, 2018 to present the Whistler 2018 Transportation Action Plan Final Draft

CPC Parking Lot Riverside Drive. Transportation Rationale

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

Transit Ridership - Why the Decline and How to Increase. Hosted by the. Virginia Transit Association

101 Corridor Managed Lanes

Appendix I Transportation 2040 Alternatives Analysis Congestion Management Process Report

O-D Study Transit Staff Workshop January 23, 2014

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Active Transportation on the Rise

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

VI. Market Factors and Deamnd Analysis

Caltrain Bicycle Parking Management Plan

Central Jersey Transportation Forum. March 2007

Capital Metro Monthly Ridership Report September 2017 (Fiscal Year-end 2017)

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

York Region Population and Employment Growth

Public Consultation Centre

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

Transcription:

Sound Transit Permit Parking Program Purpose The purposes of the proposed permit parking program are to increase the number of transit customers accommodated per parking space provided, to improve the efficiency of Sound Transit facilities and services, and to improve customer satisfaction. Background According to a customer survey conducted in 2011-2012 on Sound Transit services, about 36 percent of Sound Transit customers drive and park a vehicle to access transit when starting at home. 1 This percentage varies greatly by mode; Sounder customers have the highest parking dependence, Link customers have the lowest, and ST Express customers fall in between. Sound Transit offers limited parking facilities to provide access to Sound Transit bus and train services for customers whose only reasonable access mode is driving and parking a vehicle. Currently, this is provided free on a first-come, first-served basis to the users of this amenity. However, not all transit customers need parking to access transit, nor can all who desire parking access it when they want it, causing circling in search of a space, frustration, and either parking in a less desirable location, driving all the way to the destination, or foregoing a trip that ostensibly had some utility. In any case, lack of parking can be seen as a deterrent to transit ridership for those riders with no other options to access transit. Understanding the challenges faced by many riders and potential riders, the Sound Transit Board directed staff to test parking management strategies in a parking management pilot project. The pilot project included a test of High Occupancy Vehicle (HOV) and Single Occupancy Vehicle (SOV) permits at select high-use Sound Transit park-and-ride locations for six months in 2014. The pilot project demonstrated permits effectiveness at increasing efficiency and improving customer satisfaction with using Sound Transit park-and-rides, and thus is being developed into a permanent program proposal for the Sound Transit Board s consideration. Proposed long-term parking management vision At high demand locations, parking would be managed such that the maximum number of transit riders achievable would be accommodated per parking stall. This would be provided through a mix of permits for regular riders and day-use permits and/or transit customer validation for occasional riders. Parking management would be regionally integrated among all public owners of park-and-ride lots so that any facility could be included in the program at the owner s discretion, and the riding public would have a single interface through which to access program information for all park-and-ride lots in the central Puget Sound region. 1 2011-2012 Sound Transit Origin-Destination Survey 1

Proposed site selection criteria A park-and-ride facility is proposed for inclusion in the permit program if Sound Transit has the authority to implement parking restrictions and to make the necessary facility changes (e.g., signage, pavement markings, equipment installation), and meets at least one of the following criteria: 97% or greater utilization for the most recent three consecutive months according to monthly occupancy counts from CFAS Division of ST Operations Constructed by ST as part of a Link light rail station The proposed first priority for implementing the permit program would be at new Link light rail station lots, prior to opening. After new lots, the proposed priority for implementing a permit program at an individual facility would be based on the severity of over-subscription, starting with lots that fill the earliest in the weekday morning peak period. Under these proposed criteria, the following lots would qualify for permits: Angle Lake Station King 1,050 Link, bus ST Auburn Station King 633 Sounder, bus ST Federal Way TC King 1,190 Bus ST Issaquah TC King 819 Bus ST Kent Station King 996 Sounder, bus ST Mercer Island P&R King 447 Bus ST Overlake TC King 222 Bus ST Puyallup Station Pierce 364 Sounder, bus ST Sumner Station Pierce 302 Sounder, bus ST Tukwila International Blvd Station King 600 Link, bus ST The following facilities meet the proposed qualifying criteria but are either leased or shared, and therefore it needs to be determined whether or not permit parking could be implemented based on lease/operating agreements: Federal Way Center Plaza Leased Lot King 56 Link, bus Leased Lynnwood TC Snohomish 1,398 Bus Shared Northgate Interim Parking Lot King 156 Bus Leased Puyallup Eagles Pierce 68 Sounder, bus Leased Puyallup Red Lot (Fairgounds) Pierce 219 Bus Leased South Everett Freeway Station Snohomish 397 Bus Shared Sumner "Red Apple" Lot Pierce 48 Sounder, bus Leased 2

The following facilities would not qualify for permit program implementation under the proposed criteria at this time: Bonney Lake Park-and-Ride Pierce 359 Bus ST DuPont Station Pierce 109 Bus ST Eastmont Park-and-Ride Snohomish 389 Bus Shared Edmonds Station - Leased Lot Snohomish 84 Sounder, bus Leased Edmonds Station - ST Lot Snohomish 156 Sounder, bus ST Everett Station Snohomish 1,107 Sounder, bus Shared Lakewood Station Pierce 541 Sounder, bus ST Mukilteo Station Snohomish 63 Sounder, bus ST South Hill P&R Pierce 354 Bus ST South Tacoma Station Pierce 220 Sounder ST Tacoma Dome Station Pierce 2,337 Sounder, Link, bus Shared TIBS Seatac Center Leased Parking King 62 Link, bus Leased Tukwila Sounder Station King 390 Sounder, bus ST Proposed program phasing After a site has been selected and approved for implementation, the proposed parking management program would be implemented in phases: 1) 2+ HOV permit parking 2) SOV permit parking 3) Day-use permit/transit customer validation At this time, a day-use permit product is not available; once an approach to providing day-use permits/transit customer validation is determined, parking management could be expanded to entire facilities. In the interim, some parking spaces at each facility would remain free and available on a firstcome, first served basis. The first phase of the program (2+ HOV permit parking) would be implemented at select facilities in 2016. The second phase (SOV permit parking) would be implemented after a period sufficient to allow for customer acceptance and uptake of the HOV program. SOV permits would be priced such that a clear incentive exists to participate in the HOV program. The third phase (day-use permits) is currently under evaluation. Ideally, a single payment interface that could be used for transit and parking would be developed to improve ease of use and convenience for the customer. 3

Proposed program design elements Proposed program details could be adjusted to accommodate needs that may arise during or after implementation. Any changes to permit fees would need to be approved by the Sound Transit Board of Directors. Phase 1: HOV permit program Free or low monthly fee Two or more transit riders per permit No limit to number of HOV permits issued up to the number of permits needed (including oversell) to fill 50% of capacity of lot Permits would be oversold to maximize parking stall utilization; oversell rate could be adjusted based on observed utilization. Changes in permit fee would be determined by ST Board of Directors Phase 2: SOV permit program Pricing to be determined by ST Board of Directors, with potential low-income rate Permits would be oversold to maximize parking stall utilization; oversell rate could be adjusted based on observed utilization. Permits would be issued on space-available basis for no more than 50% of capacity of lot when combined with HOV permits, and maintaining some capacity for additional growth in HOV permit allocation Phase 3: Day use permit/transit customer validation To be further developed ORCA integration is desirable If a day use permit/transit customer validation program is implemented, up to 100% of spaces at a facility could be managed, i.e., no first-come, first-served spaces Monitoring and Enforcement Regular monitoring and enforcement of permitted spaces Spot check enforcement of HOV 2+ rider requirement Permit spaces generally reserved/enforced 6:00 9:30 a.m. Monday-Friday but could be adjusted on a facility-by-facility basis if needed If permitting and enforcement technology allows, multiple vehicles could be authorized per permit so long as only one vehicle at any given time is using the permit Application criteria/procedures Customers must provide ORCA number and permission to review up to one month of ride history to validate that they are a transit rider (any fixed-route ORCA activity in past month qualifies an applicant during initial application process) 4

ORCA numbers reviewed periodically after permits issued to ensure transit ridership of an average of three times per week, with flexibility for time away (vacations, etc.) HOV permit applicants must provide ORCA numbers and permission to access ride history for all applicants on the permit Proposed implementation plan If approved by the Sound Transit Board of Directors at its September 2015 meeting, the following implementation plan would be carried out. September, 2015: Title VI Fare Equity analysis on HOV & SOV permits completed October, 2015: Procurement of third-party parking management vendor initiated January, 2016: Contract with third-party vendor considered by Board of Directors; Notice to Proceed issued given Board approval Q1-Q2, 2016: Vendor preparation; marketing and outreach for HOV permit program; HOV permit applications open Opening of Angle Lake Station (Link light rail) estimated fall 2016: HOV permit program implemented Approximately three to six months after HOV program initiated: Board of Directors considers rates for SOV permits (If SOV permit rate approved) Approximately six to nine months after HOV program initiated: SOV permit program implemented Ongoing: Research and development of daily fees or transit customer validation Date TBD: Title VI Fare Equity Analysis on daily fees program (if fees will be charged) Date TBD: Board of Directors considers rates (if any) for daily use Date TBD: Daily fees/transit customer validation implemented 5