Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Similar documents
Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

PLEASE BRING YOUR LUNCH

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

PLEASE BRING YOUR LUNCH

PLEASE BRING YOUR LUNCH

Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting March 8, 2012 Meeting at Merwin

Please be advised that the following participants were in attendance at the special conference call at 2:00pm yesterday:

Lewis River Upstream Transport Plan Interim Final. Prepared by Frank Shrier Principal Fish Biologist PacifiCorp Energy.

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting September 14, 2006 Ariel, WA

APPENDIX D: LEWIS RIVER HATCHERY REVIEW

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda

Lewis River Fish Passage Program 2014 Annual Report (30-day review Draft)

Yakima River Basin Coho Reintroduction Feasibility Study

Strategies for mitigating ecological effects of hatchery programs

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting November 8, 2007 Ariel, WA

Hatchery and Supplementation Program 2013 Annual Report

Yakima/Klickitat Fisheries Project

FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting February 8, 2007 Ariel, WA

Ned Currence, Nooksack Indian Tribe

Hatchery and Supplementation Program FINAL 2015 Report. Lewis River Hydroelectric Projects FERC Project Nos. 935, 2071, 2111, 2213

Downstream Fish Passage Reports from the Field

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

CUSHMAN RESERVOIRS. Skokomish Watershed Monitoring Conference - Public Meeting Florian Leischner 9/17/2015

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

Perspectives of a State Director Selective fisheries as a tool in fisheries management and salmon recovery

TABLE OF CONTENTS LIST OF TABLES

LEWIS RIVER FISH PLANNING DOCUMENT

index area in Pine Creek mainstem to establish redd-life

Reproductive success of hatchery chinook salmon in the Deschutes River, Washington

P U B L I C U T I L I T Y D I S T R I C T N O.

Hatchery and Supplementation Program DRAFT 2014 Report. Lewis River Hydroelectric Projects FERC Project Nos. 935, 2071, 2111, 2213

June 3, 2014 MEMORANDUM. Council Members. Stacy Horton, Policy Analyst, Washington. SUBJECT: Final 2012 Hatchery Fin Clip Report

Lake Merwin and Swift Creek Reservoir Tributaries. Bull Trout Limiting Factors Analysis

4.4 ASSESSMENT OF POTENTIAL ANADROMOUS FISH HABITAT UPSTREAM OF MERWIN DAM (AQU 4)

ASSOCIATION OF POWER BIOLOGISTS 2017 Meeting Agenda August 29 th 31 st, Centralia, Washington

Fall Chinook Work Group

FISH PROPAGATION 2010 ANNUAL REPORT

Meeting Summary Fisheries Management Technical Feedback Group Meeting Friday, November 2, 2012

UPSTREAM FISH PASSAGE 2015 ANNUAL REPORT

Project Award Presentation

Follow this and additional works at:

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Hatchery Scientific Review Group Review and Recommendations

Cushman Hydro Project Public Meeting. Cushman Fire Hall Dec. 6, 2018

Cowlitz River Fisheries and Hatchery Management Plan (FHMP)

Wenatchee Spring Chinook Relative Reproductive Success Study. Andrew Murdoch (WDFW) Michael Ford (NOAA) Michael Hughes (WDFW)

August 7, SUBJECT: Briefing on Surface Collectors in the Pacific Northwest: Operating Characteristics and Collection Success

Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist

2018 Annual Operating Plan

Mountain Snake Province

LOWER COWLITZ ADULT TRIBUTARY ABUNDANCE METHODS

Appendix D HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Washington Department Fish and Wildlife

Life History Diversity of Juvenile Steelhead Within the Skagit Basin Clayton Kinsel Shannon Vincent Joe Anderson 03/19/14

Okanagan Sockeye Reintroduction

Summary of HSRG Findings for Chum Populations in the Lower Columbia River and Gorge

State of Washington Dept. of Fish and Wildlife invites applications for the position of: Permanent Fisheries Biologist 4 *

Study Update Fish Distribution and Species Composition

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

***Please Note*** April 3, Dear advisory committee members:

THREATENED, ENDANGERED, AND SENSITIVE SPECIES 2010 ANNUAL REPORT

Kirt Hughes Washington Department of Fish and Wildlife Region 6 - Fish Program Manager

UNIT 4E. SALMON SUPPLEMENTAL INFORMATION

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

Hatchery Scientific Review Group Review and Recommendations

FISH PROPAGATION 2015 ANNUAL REPORT

Don Pedro Project Relicensing

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

OREGON AND WASHINGTON DEPARTMENTS OF FISH AND WILDLIFE JOINT STAFF REPORT - WINTER FACT SHEET NO.

CAPTURE AND TRANSPORT OF LOWER COLUMBIA RIVER FALL CHINOOK SALMON DURING THE YEAR OF CONDIT DAM REMOVAL.

Baker River Project License Implementation. Aquatics Resource Group Meeting Final Conference Call Notes. March 9, 2010 ~ 9:00-11:00 am

2013 WHITE SALMON CHINOOK SALMON VSP MONITORING. Jeremy Wilson Washington Department of Fish and Wildlife

TABLE OF CONTENTS LIST OF TABLES NONE LIST OF FIGURES NONE

Yale Reservoir Kokanee (Oncorhynchus nerka) Escapement Report 2016

FISH CONNECTIVITY IMPLEMENTATION PLAN

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

FISH PROPAGATION 2012 ANNUAL REPORT

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

SALMON FACTS. Chinook Salmon. Oncorhynchus tshawytscha

By K.L. Pratt. Prepared for PacifiCorp, in cooperation with Cowlitz PUD, USFWS, WDFW July 2003

Hatchery Scientific Review Group Review and Recommendations

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Susitna-Watana Hydroelectric Project (FERC No ) Salmon Escapement Study Study Plan Section 9.7

Upper Columbia Redband Trout: Conservation for the Future

Timing Estimation of Juvenile Salmonid Migration at Lower Granite Dam

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT

MEMORANDUM. Ron Boyce, ODFW Bob Heinith, CRITFC. Michele DeHart. DATE: November 30, Operations

Wild Steelhead Coalition Richard Burge Conservation VP September 11, 2006

Council CNL(15)26. Annual Progress Report on Actions Taken Under Implementation Plans for the Calendar Year EU Spain (Navarra)

APPENDIX B. Final reports on chinook salmon spawning surveys - Sultan River, Washington Report

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

The following language describing the performance standards was taken from the Reasonable and Prudent Alternative Table of Actions in the 2008 BIOP:

Hatcheries: Role in Restoration and Enhancement of Salmon Populations

Cowlitz Hydroelectric Project FERC No Cowlitz Fisheries Technical Committee Final FHMP Meeting Summary September 7, 2017 from 9:30 AM 2:00PM

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed

Biological Opinion. Magnuson-Stevens Fishery Conservation and Management Act Consultation

FINAL Caples Lake Fisheries Management Plan. Version 4.0

NEZ PERCE TRIBE Department of Fisheries Resources Management Administration Enforcement Harvest Production Research Resident Fish Watershed

Transcription:

Lewis River Hydroelectric Projects Settlement Agreement Aquatic Coordination Committee (ACC) Meeting Agenda Date & Time: Thursday, September 4, 27 9: a.m. : a.m. Place: CONFERENCE CALL ONLY Contacts: Frank Shrier: (53) 32-7423 Time Discussion Item 9: a.m. Welcome Review Agenda and ACC 8//7 Meeting Notes Comment & Accept Agenda and 8//7 Meeting Notes 9: a.m. Public Comment Opportunity 9:2 a.m. Acclimation Pond Decommission Plan Discussion DECISION NEEDED :2 a.m. Study/Work Product Updates o 23 Bull Trout Habitat Restoration Project ID Assessment Update o H&S Plan Update o Woodland Release Ponds Construction - Status o Merwin Upstream Passage Status o Swift Floating Surface Collector Status o In Lieu Fund - Status :45 a.m. Next Meeting s Agenda Public Comment Opportunity Note: all meeting notes and the meeting schedule can be located at: http://www.pacificorp.com/es/hydro/hl/lr.html# : a.m. Adjourn Join by Phone + (53) 83-5252 [Portland, Ore.] + (855) 499-5252 [Toll Free] Conference ID: 256249

ACC Participants Present (3) Frank Shrier, PacifiCorp Kim McCune, PacifiCorp Chris Karchesky, PacifiCorp Erik Lesko, PacifiCorp Tom Wadsworth, WDFW Dan Rawding, WDFW Steve Manlow, LCFRB Amelia Johnson, LCFRB Amanda Froberg, Cowlitz PUD Eli Asher, Cowlitz Indian Tribe Ruth Tracy, USDA Forest Service Bryce Michaelis, USDA Forest Service Greg Robertson, USDA Forest Service Guest () Marc McHenry, USDA Forest Service FINAL Meeting Notes Lewis River License Implementation Aquatic Coordination Committee (ACC) Meeting September 4, 27 Conference Call Only Calendar: September 4, 27 ACC Meeting Merwin Hydro Assignments from September 4, 27 McCune: Email an electronic copy of the Aquatic Fund Project Close Out Report to Bryce Michaelis. Shrier/McCune: Incorporate the requested ACC changes/edits into the Acclimation Pond Decommission Plan and email redline back to the ACC for another 7-day review period. Status Complete 9/4/7 Complete 9/9/7 Opening, Review of Agenda and Meeting Notes Frank Shrier (PacifiCorp) called the meeting to order at 9:5 a.m. and reviewed the agenda. No agenda additions were requested. Shrier also reviewed the August, 27 meeting notes. The meeting notes were approved at 9: a.m. without change. Public Comment None Acclimation Pond Decommission Plan Discussion Shrier provided a cursory review of the comments received from WDFW (Attachment A). The adult distribution referenced in WDFWs notes is already being done. Note that this reference is

WDFW comments is incorrect, Goals for the number of adult spring chinook transported upstream are set forth in the Settlement Agreement. Shrier noted that in Section 8.5.3 of the Lewis River Settlement Agreement it states: 8.5.3 Adult Salmonids. The Licensees shall begin providing for the supplementation of adult fish one year prior to completion of the Swift Downstream Facility. Throughout the terms of the New Licenses, the Licensees shall provide for the transport and release of supplementation stocks of adult spring Chinook, coho, and steelhead above Swift No. as directed by the ACC. Throughout the terms of the New Licenses, PacifiCorp shall provide for the transport and release of supplementation stocks of adult spring Chinook, coho, and steelhead into Yale Lake and Lake Merwin as directed by the ACC. The ACC shall determine the timing for initiating supplementation into Yale Lake and Lake Merwin. The ACC, subject to the approval of the Services, may recommend discontinuing or recommencing the supplementation of such supplementation stocks, provided that any such recommendations are biologically based and not contrary to the goals of the ESA. The Acclimation Pond Decommission Plan is intended as a general plan. In accordance with the August 3, 27 Proposal to the ACC on page 5. PacifiCorp will also develop and implement a study to evaluate the performance of the acclimation fish to determine the viability of a direct release program. PacifiCorp intends to procure a consultant to assist/develop a detailed study plan by March 28 to include but not limited to evaluation of other supplementation plans in the Pacific Northwest to see methods and results. An analysis will be incorporated into the evaluation. Dan Rawding (WDFW) would like the following bullets from their comments incorporated into the Plan and state the purpose of the acclimation fish. Evaluate duration of time juveniles rear in upper watershed prior to migrating downstream to Swift Reservoir. Evaluate distribution of juveniles after release into the upper watershed. Evaluate survival or juveniles from release to arrival at floating surface collector in Swift Reservoir. PacifiCorp will incorporate the requested changes and email back to the ACC for another 7-day review period. Study/Work Product Updates 23 Bull Trout Habitat Restoration Project ID Assessment Update Bryce Michaelis (USDA Forest Service) informed the ACC attendees that the subgroup last met September 3, 27 and most of the field work is complete. The final draft product is expected to the ACC by the November 9, 27 meeting. Michaelis will prepare an approximate 2 minute PowerPoint presentation for the ACC to include background information and provide a Q&A opportunity for the ACC. Kim McCune (PacifiCorp) mentioned that the FERC will require a close out report that will be filed April 28. McCune will email a close out report form to Michaelis for his use. 2

H&S Plan Update Erik Lesko (PacifiCorp) informed the ACC that the H&S Subgroup is working on spring Chinook rearing and release protocol at Lewis River Hatchery. They are also working on a proposal for estimating phos downstream of Merwin Dam, and a proposal for monitoring protocols for genetic risks to late winter steelhead. The Subgroup met last Thursday and will continue to meet the last Thursday of every month at least through March 28. Woodland Release Ponds/Construction Update The in-water work period continues for another two weeks. Expected construction completion is November 3, 27 and can begin using the pond after this date. In Lieu Fund Status PacifiCorp will be requesting a status from the Services regarding their next steps. The FERC granted the extension to the Services until February 23, 28 to file their determination for fish passage facilities at Yale and Merwin reservoirs. Other Monitoring & Evaluation Erik Lesko (PacifiCorp) informed the ACC attendees that the distribution of adult Spring chinook (over,) fish is better than coho or steelhead. 2-3 redds, downstream of Eagle Cliffs and in Clearwater Creek plus some of the reservoir tributaries. The Chinook are naturally distributing themselves in the upper basin. Merwin Fish Collection Facility and General Operations (Attachment B) During the month of August, a total 72 fish were captured at the Merwin Adult Fish Collection Facility. The vast majority of these fish were summer steelhead (653 92%). A total of 2,896 spring Chinook have been captured at the Merwin Trap through August 27. The Merwin Dam adult fish trap ran continuously through the month of August except from the 6 th through the 24 th to preform annual maintenance. During August 29 th through 3 st the trap s elevator system was disabled to replace hopper cabling. During this period the fish ladder and AWS system remained in operation. River flow below Merwin Dam fluctuated between,2 and 2,5 cfs throughout the month. The Merwin Dam Adult Fish Trap was turned off Saturday evening (September 9, 27) due to a broken cable on the fish hopper. All fish were safely removed from the ladder and repairs are ongoing. We expect that the trap will be back in service later this week. PacifiCorp will notify the ACC once repairs are complete and the trap is back in service. 3

Discharge, cubic feet per second Upstream Transport (Attachment B) No Blank Wire Tag (BWT) winter steelhead were transported upstream above Swift Dam in August 27; a total of 599 BWT winter steelhead transported as part of the 27 run year. 27 Late-Winter Steelhead (BWTs) (thru August 27) Male Female Total 327 272 599 PacifiCorp began transporting adult spring Chinook to the upper basin on May 8, 27. By the end of the August, a total of,3 fish had been transported and released at the head of Swift Reservoir. 27 Spring Chinook (thru August 27) Male Female Jacks Total 37 43 3*, * Contain approximately 25% females < 24 inch ( Jills ). PacifiCorp began transporting early coho salmon to the upper basin on August 25, 27. By the end of the August, a total of 6 fish had been transported and released at the head of Swift Reservoir. More than 75% of these fish (n=2) were NORs. 27 Coho Salmon (thru August 27) Stock Male Female Jacks Total Early (S-type) 6 6 Late (N-type) TOTAL 6 6 4

Swift Floating Surface Collector (Attachment B) The Swift Reservoir Floating Surface Collector (FSC) did not operate during the month of August. The vessel has been deballasted for summer maintenance and is scheduled to be returned to service by early-october. Agenda items for October 2, 27 September 4, 27 Meeting Notes Acclimation Pond Decommission Plan Discussion Study/Work Product Update Next Scheduled Meeting: October 2, 27 Merwin Hydro Control Center or Conference Call Ariel, WA 9: a.m. - 2: p.m. Adjourn 9:4am Meeting Handouts & Attachments: Meeting Notes from 8//7 Agenda from 9/4/7 Attachment A Acclimation Pond Plan comments from WDFW, September 3, 27 Attachment B Lewis River Fish Passage Report (August 27) 5

Lewis River Spring Chinook Reintroduction Program Adult and Juvenile Upper Basin Release Strategies and Evaluation WDFW Recommendations WDFW understands that there was originally an expectation that acclimation ponds be established in the upper Lewis basin to benefit reintroduction efforts of spring; however, it has been difficult to effectively maintain the facilities necessary to acclimate fish in the upper Lewis Basin. At the last several ACC meetings there have been discussions regarding alternatives to the acclimation ponds originally implemented. WDFW is supportive of moving in a different direction, but wants to make sure that the new path chosen is evaluated to determine the effectiveness of alternatives implements. It is also important that the spring chinook acclimation benefits juvenile productivity and geographic distribution of returning adults. To that end WDFW has recommendations on how best to proceed with both distribution of returning adults and acclimation of juvenile hatchery production used to support reintroduction of spring chinook into the Upper Lewis Basin. Adult Distribution It is important that adults returning to the upper watershed are well distributed throughout the watershed, which will allow spring chinook to utilize the most productive portions of the watershed. To accomplish this WDFW proposes that adults being transported to the upper watershed be released in a variety of locations throughout the watershed instead of the head of Swift Reservoir. Releases should be focused in those areas that have the highest potential to support successful spawning and juvenile rearing. A similar action has already been implemented for winter steelhead and has shown positive results in terms of increased geographic distribution of spawning adults. Goals for the number of adult spring chinook transported upstream are set forth in the Settlement Agreement. Juvenile Acclimation In 27 the use of acclimation ponds and large scale releases in a few select locations was discontinued. In its place a pilot study for releases of juvenile spring chinook was initiated that: ) released fish at a smaller size (fingerlings instead of smolts), 2) released fish earlier in the year (July and August rather than fall months), 3) released fish at an increased number of locations and 4) released smaller numbers of fish over a broader time frame. Initial results appear to be positive in terms of increased residence time of juvenile spring chinook in the upper watershed. WDFW is proposing that the pilot effort initiated in 27 be continued for several years into the future. This new acclimation strategy needs to be evaluated to determine if it is benefiting

juvenile productivity and residency plus homing of returning adults. This release strategy should be modified in the future based on results from the aforementioned evaluation efforts. Specific recommendations from WDFW regarding the evaluation efforts are as follows: Evaluate duration of time juveniles rear in upper watershed prior to migrating downstream to Swift Reservoir. Evaluate distribution of juveniles after release into the upper watershed. Evaluate survival or juveniles from release to arrival at floating surface collector in Swift Reservoir. The information collected as part of this evaluation would be used to compare this release strategy to other release or acclimation strategies. For instance, it has been suggested that juvenile spring chinook could be released directly into Swift Reservoir and if that was to occur the evaluation metrics described above could be used to evaluate the performance of these two different strategies. WDFW is proposing an overarching approach to evaluate juvenile release strategies into the upper watershed. This overarching approach could be used to evaluate a variety of strategies that could be considered in the future (e.g. reservoir releases, use of acclimation ponds). WDFW is not proposing specific methodology to collect data necessary to estimate evaluation metrics described above. Specific methodology implemented would be under the purview of the ACC. Patrick Frazier and Tom Wadsworth WDFW August, 27

Lewis River Fish Passage Report August 27 Merwin Fish Collection Facility and General Operations During the month of August, a total 72 fish were captured at the Merwin Adult Fish Collection Facility. The vast majority of these fish were summer steelhead (653 92%). A total of 2,896 spring Chinook have been captured at the Merwin Trap through August 27. The Merwin Dam adult fish trap ran continuously through the month of August except from the 6 th through the 24 th to preform annual maintenance. During August 29 th through 3 st the trap s elevator system was disabled to replace hopper cabling. During this period the fish ladder and AWS system remained in operation. River flow below Merwin Dam fluctuated between,2 and 2,5 cfs throughout the month. Discharge, cubic feet per second

Upstream Transport No Blank Wire Tag (BWT) winter steelhead were transported upstream above Swift Dam in August 27; a total of 599 BWT winter steelhead transported as part of the 27 run year. 27 Late-Winter Steelhead (BWTs) (thru August 27) Male Female Total 327 272 599 PacifiCorp began transporting adult spring Chinook to the upper basin on May 8, 27. By the end of the August, a total of,3 fish had been transported and released at the head of Swift Reservoir. 27 Spring Chinook (thru August 27) Male Female Jacks Total 37 43 3*, * Contain approximately 25% females < 24 inch ( Jills ). PacifiCorp began transporting early coho salmon to the upper basin on August 25, 27. By the end of the August, a total of 6 fish had been transported and released at the head of Swift Reservoir. More than 75% of these fish (n=2) were NORs. 27 Coho Salmon (thru August 27) Stock Male Female Jacks Total Early (S-type) 6 6 Late (N-type) TOTAL 6 6 Floating Surface Collector The Swift Reservoir Floating Surface Collector (FSC) did not operate during the month of August. The vessel has been deballasted for summer maintenance and is scheduled to be returned to service by early-october.

Annual 997 36 545 2 3 4 2 2 8 4 8 3 4 926 92 339 586 9 26 247 34 283 67 49 47 43 4 4 2 3 3 5 7348 Reporting Date Sockeye Chum Pink Cutthroat (>3 inches) Cutthroat (< 3 inches) Rainbow (< 2 inches) Bull Trout (> 3 inches) Bull Trout (< 3 inches) Daily Total Fish Facility Report Merwin Adult Trap August 27 Spring Chinook Early Coho Late Coho S. Steelhead W. Steelhead Fall Chinook AD-Clip Wild Recap AD-Clip CWT Wild Recap AD-Clip CWT Wild Recap Fresh Recap Wild AD-Clip BWT RT Recap Wild AD-Clip Wild Recap M F JK M F JK M F JK M F JK M F JK M F JK M F JK M F JK M F JK M F JK M F JK M F M F M F M F M F M F M F M F JK M F JK M F JK M F M F M F -Aug 4 6 2 6 8 38 2-Aug 8 9 6 5 2 52 3-Aug 5 24 2 6 7 4-Aug 7 7 8 6 2 4 5-Aug 6-Aug 7-Aug 27 3 2 2 2 93 8-Aug 2 8 9 39 9-Aug 8 4 3 6 32 -Aug 4 7 6 3 -Aug 7 2 5 35 2-Aug 3-Aug 4-Aug 9 4 4 2 2 42 5-Aug 8 6 2 9 6-Aug 7-Aug 8-Aug 9-Aug 2-Aug 2-Aug 22-Aug 23-Aug 24-Aug 25-Aug 3 48 68 44 26-Aug 27-Aug 28-Aug 2 2 7 24 8 6 75 29-Aug 3-Aug 3-Aug Monthly 2 5 2 2 8 4 6 255 87 49 2 3 9 2 7 2 72 Only hatchery verses wild distinctions are currently being made. All hatchery fish are labeled as "AD-Clip". 2 Total counts do not include recaptured salmon.

Fish Facility Report Swift Floating Surface Collector August 27 Coho Chinook Steelhead Cutthroat Bull Planted Day fry parr smolt fry parr smolt fry parr smolt kelt fry < 3 in > 3 in Trout Rainbow Total 2 3 4 5 6 7 8 9 2 3 4 5 6 7 8 9 2 2 22 23 24 25 26 27 28 29 3 3 Monthly Total 325 66 935 43 695 7 43 54 9 3 32 38 8 287 8725