US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

Similar documents
STUDY PROCESS & SCHEDULE

Kentucky s Surface Transportation System

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

ACTIVE TRANSPORTATION

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

Non-Motorized Overpass at SR 5/US1

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

2.0 LANE WIDTHS GUIDELINE

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

TRAFFIC IMPACT ANALYSIS

FY 2005 TRANSPORTATION CAPITAL PROGRAM

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

5. RUNNINGWAY GUIDELINES

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Accommodating Pedestrians in the Work Zone

section 4 Existing Conditions, Issues, and Options

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

TRASBURG RANSPORTATION

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

INDEX. Geometric Design Guide for Canadian Roads INDEX

10.0 CURB EXTENSIONS GUIDELINE

FY 2006 TRANSPORTATION CAPITAL PROGRAM

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

ADA on Construction. Guidance for Section C Plan Preparers

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

CURBSIDE ACTIVITY DESIGN

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

DRAFT Sellwood Bridge Existing Roadway Deficiencies

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

122 Avenue: 107 Street to Fort Road

Geometric Design Tables

Tonight is for you. Learn everything you can. Share all your ideas.

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Executive Summary. September 3, 2014

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Duwamish Way-finding and CTR Report

VILLAGE OF NILES TRAFFIC CALMING POLICY

Living Streets Policy

Complete Streets. Designing Streets for Everyone. Sarnia

DUNBOW ROAD FUNCTIONAL PLANNING

CHAPTER 1 STANDARD PRACTICES

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

JCE 4600 Transportation Engineering. Traffic Control

Project Application. Project Location: Salem Drive (Federal Route 1101)

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

List of Display Boards

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

General Design Factors

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Active Transportation Facility Glossary

Readington Road (C.R. 637) Construction

2.0 Existing Conditions

Chapter 4 On-Road Bikeways

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Clinton Street Bridge over the Maumee River. ODOT Project DEF April 1, 2015 Stakeholder s Meeting

complete streets design and construction standards public primer City of Edmonton

Pedestrian Project List and Prioritization

Draft North Industrial Area-Wide Traffic Plan

Mandan Commission Meeting August 2, 2016 Mandan City Hall

FOR HISTORICAL REFERENCE ONLY

Physical Implications of Complete Streets Policies

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

10 th STREET BRIDGE REPLACEMENT Schedule 'C' EA: Phase 3 Presentation to Council Recommended Design Alternatives City of Owen Sound August 27, 2018

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

COMMITTEE RECOMMENDATIONS. That Council approve:

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Classification Criteria

CHAPTER 1 GENERAL DESIGN

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Washington St. Corridor Study

Route 29 Solutions Projects

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Borough of Danville, PA Traffic Calming Program Guidelines

Chapter 3 DESIGN SPECIFICATIONS

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Kentucky Highway District 7

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Transcription:

Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6

Table of Contents I. Purpose of the Proposed Action... 1 II. Description of Project Area... 1 III. Need for Action... 2 A. Structural Deficiencies... 2 B. Operational and Geometric Deficiencies... 3 C. Other Considerations... 3 List of Tables Table 1: Existing Navigation Clearances... 4 Table 2: Major Employers... 5 Table 3: Average Daily Traffic (ADT) Volumes... 6 Exhibits Exhibit 1: Location Map Exhibit 2: Project Study Area Exhibit 3: Existing Roadway Network Exhibit 4: Existing Structure Photos Exhibit 5: Crash Data i

I. Purpose of the Proposed Action The purpose of the US Route 24 Bridge (Quincy Memorial Bridge) project is to provide a transportation facility for eastbound traffic across the Mississippi River that is safe, reliable, structurally sound, and meets current design standards. The project shall maintain connectivity across the river for the projected roadway traffic levels, and also make accommodations for bicycle traffic, while meeting the needs of the river traffic, and the local and regional economic needs. II. Description of Project Area The project is located west and adjacent to the City of Quincy, Illinois. The west approach to the bridge is in West Quincy, Marion County, Missouri and the east approach to the bridge is in downtown Quincy, Illinois in Adams County. The project study limits extend from just west of County Road 357 on the Missouri side about two miles east to Sixth Street on the Illinois side. The study limits encompass both the existing Bayview Bridge (US Route 24 westbound traffic) and the Quincy Memorial Bridge (US Route 24 eastbound traffic) (See Exhibit 1: Location Map and Exhibit 2: Project Study Area). The study area is extended to Sixth Street in Quincy to allow for consideration of alternatives that include either utilization of the Bayview Bridge or paralleling it. US Route 24 is part of the National Highway System (NHS), a network of strategic highways and significant routes serving major airports, ports, rail or truck terminals, rail stations and other transportation facilities essential to the nation s economy, defense and mobility. The US Route 24 bridges connect with US Route 61 to the west and IL 57, IL 96, IL 104 and Interstate 172 to the east, providing a regional link between Hannibal, Missouri, 21 miles south, Keokuk, Iowa, 38 miles north, and many surrounding rural communities in Illinois and Missouri. In 2013, an average of 9,100 vehicles per day crossed the existing eastbound bridge; approximately 6% were single or multi-unit trucks (531 trucks per day average). The westbound bridge carried an average of 10,800 vehicles per day in 2013, and of that, 605 were trucks. There are very limited alternate routes; the nearest river crossing is approximately 30 minutes south in Hannibal. US Route 24 also provides important access to the Historic Quincy Business District in downtown Quincy. The street network in the downtown area is comprised of both one-way couples and two-way local streets (See Exhibit 3: Existing Roadway Network). Eastbound US Route 24 ties directly into Maine Street and intersects 2 nd Street, 3 rd Street (Southbound IL 57), and 4 th Street (US Route 24 / Northbound IL 57). The existing eastbound structure was originally constructed in 1930 and is a continuous through-truss type bridge with a roadway deck that is 24 feet wide. This bridge is listed on the Illinois Department of Transportation (IDOT) Illinois Historic Bridge Survey and has been determined to be eligible for listing on the National Register of Historic Places; therefore, it is protected under Section 106 of the National Historic Preservation Act of 1966. There are two 12-foot wide traffic lanes, no shoulders and steel bridge guardrails. The structure is 3,512 feet long with the two main spans at 627 feet, 8 inches each. The existing bridge is currently marked for legal loads only due to the load-carrying capacity of the structure. A legal load only bridge is not structurally adequate to carry more than the legal weight limit on those highways where permits have been issued allowing certain vehicles to exceed normal weight limits. The existing westbound structure, the Bayview Bridge, was constructed in 1986 and meets all current highway standards for a one-way urban principal arterial roadway structure. 1

III. Need for Action The need for the project is to address the structural, operational and geometric deficiencies of the existing river bridge. Existing deficiencies are those roadway and structural elements not meeting current Federal Highway Administration or IDOT policies. The most recent structure ratings now categorize the bridge as both functionally obsolete and structurally deficient by federal standards. A structurally deficient bridge is one with a structural deficiency rating of four or less. This rating is a warning that structural bridge elements are deteriorating and in the case of the Memorial Bridge, the bridge has reduced load-carrying capacity. Although the structurally deficient label does not necessarily mean the bridge is unsafe, the structure is nearing the end of its expected service life and to remain in service, major rehabilitation or replacement would be required to address the deterioration conditions and deficiencies. A functionally obsolete bridge has geometric deficiencies, such as the deck width and vertical clearance that do not meet current design standards. The sufficiency rating for bridges ranges from 0 to 100 and is a computed value that factors in structural conditions, geometry and capacity. A structure with a lower rating implies a higher priority for improvement. The Quincy Memorial Bridge was last inspected in April 2014 and assigned a sufficiency rating of 16.9. Structures rated 50 or lower are eligible for Federal bridge rehabilitation or replacement funding. A. Structural Deficiencies The bridge has been subject to repairs in 1955, 1965, 1966, 1970, 1972, 1982, 1990, 1996, and 2001. In 1982, the deck was reconstructed and the outside curbs were removed to widen the traffic lanes from 10 to 12 feet with no shoulders. The most recent rehabilitation in 2003 included repairs to the structural steel and deck surface. The 2014 master structure report and inspection list the bridge superstructure as 4 or Poor Condition Advanced Deterioration and both the deck geometry and waterway adequacy are listed as 2 or Intolerable - High Priority For Replacement. 1. Superstructure: From the 2013 NBIS bridge inspection report, visible holes and heavy rusting are present in numerous members resulting in up to 15% section loss in truss members, up to 54% section loss in floor system, and up to 43% section loss on bottom flange in approach spans. (See Exhibit 4: Existing Structure Photos) 2. Substructure: From the 2012 Underwater Inspection report, the top of the pile caps are exposed on 16 of the 36 piers. Heavy debris accumulation is a continuous problem each year at the west approach spans. 2

B. Operational and Geometric Deficiencies The existing bridge has deficient roadway and shoulder widths, profile grades, railings and accommodations for pedestrians and bicyclists. Due to the alignment and profile of the existing structure, the existing profile of US Route 24, as the roadway continues east into downtown Quincy, is more than 8%. The maximum profile grade for this type facility is 7%. The existing deck width of 24 feet is insufficient; a minimum deck width of 30 feet is required according to IDOT design criteria for a one-way urban principal arterial roadway structure. The bridge cannot safely accommodate wide load traffic, disabled vehicles or bicycles. Due to the existing low profile of the west approach there is a history of flooding and overtopping of the bridge surface, resulting in closure of eastbound US Route 24 on multiple occasions, forcing traffic to be temporarily shifted to the Bayview Bridge. Closing the eastbound bridge results in disruption to traffic flow and additional maintenance of traffic costs. The U.S. Army Corps of Engineers (USACOE) has indicated that raising the profile of the west approach should be consistent with the existing levee height. The existing steel railing does not meet current IDOT standards for bridge railing configurations. The existing railing height is only 2.2 feet and the minimum steel railing height is 2.8 feet for this type facility. C. Other Considerations Although the structural deficiencies are the primary needs of the eastbound US Route 24 bridge project, the following also will be considered in development of the project alternatives. 1. Safety Concerns The crash data for the project study area shows that most are sideswipe crashes and rear end type, occurring near the east approach at the intersections of US Route 24 with 3 rd and 4 th Streets in downtown Quincy, Illinois. As traffic is coming off the bridge and heading east into Quincy, eastbound traffic continuing on US Route 24 must be in the inside (left) lane to turn north at 4 th Street. Traffic intending to go south on IL 57 must be in the outside (right) lane to turn south at 3 rd Street. The sideswipe crashes may be a result of these traffic weaving maneuvers, narrow traffic lanes on the bridge approach, and the steep uphill grade between the bridge approach and 3 rd Street. (See Exhibit 5: Crash Data). 3

2. Mississippi River Navigation As part of the study, the navigational channel and river traffic operations will be reviewed and coordinated with the USACOE and the U.S. Coast Guard (USCG). Since the Mississippi River is a navigable waterway, the USACOE and USCG regulate the vertical and horizontal navigation clearances. These clearances are established on a site-by-site basis, considering location of navigation channel obstructions, navigation channel geometry, barge traffic operations, typical flotilla configurations and input from river carrier associations. While the Quincy Memorial Bridge carries eastbound US Route 24 over the Mississippi River, the companion Bayview Bridge serves as the westbound crossing for the same US Route 24 over the Mississippi River. The Memorial Bridge is within 0.2 river miles of the Bayview Bridge, constructed in the 1980 s. The proximity of these two bridges warrants attention for both bridges to have similar vertical and horizontal navigation clearances. Navigation clearances for the Memorial Bridge and the Bayview Bridge are given in Table 1 below. Table 1 - Existing Navigation Clearances 1 Structure Circa Horizontal Vertical Comment (ft.) (ft.) Memorial Bridge 2 1930 s 617 55 Subject of this study. Bayview Bridge 1980 s 870 60 To remain in service. 1 From IDOT Structure Summary Report - for the Quincy Memorial Bridge, dated 12/08/2014. For the Quincy Bayview Bridge dated 03/25/2015. 2 The Quincy Memorial Bridge has two 627-8 truss spans over the navigation channel with a pier obstructing the navigation channel. Vertical navigation clearance at the Memorial Bridge is five feet less than the adjacent Bayview Bridge. The horizontal navigation clearance at the Memorial Bridge is noticeably less than the Bayview Bridge. Pier 9 of the Memorial Bridge is in the middle of the navigation channel and is a foremost justification for eliminating Pier 9 to widen the navigation channel, improve navigation safety and minimize the potential for a vessel collision event at Pier 9. 3. Impact to the Community The two US Route 24 bridges (Bayview & Memorial) act as a one-way couple with directional access for both states, play a significant role in the local and regional economies and provide residents of Adams (IL) and Marion (MO) County access to emergency services and jobs. The communities west of the river rely on the existing bridges for access to and from Quincy, and the Quincy businesses rely on US Route 24 traffic to generate customers. Maintaining both the eastbound and westbound river crossings and access to the Quincy business district is critical to the local and regional economies and their sustainability. 4

Major employers within the project area are shown in Table 2 below. Table 2 Major Employers Major Employers in Quincy and Adams County, IL Employees ADM (3 locations) 655 AMCON Distributing 160 Blessing Health System 2,552 Blue Cross Blue Shield 500 Broadcast Electronics 150 Fitzpatrick Brothers 100 Gardner Denver 365 Harris Broadcast Division 550 Hollister Whitney 204 Illinois Veteran's Home 525 J.M. Huber Corporation 200 John Wood Community College 418 Knapheide Manufacturing 800 Manchester Tank 276 Prince Agri Products 100 Quincy Compressor 300 Quincy Medical Group 667 Quincy Newspapers, Inc. 150 Quincy Public Schools 1,061 Quincy University 271 Titan International 900 Transitions 170 Wis-Pak 104 Source: Great River Economic Development Foundation http://www.gredf.org/wp-content/uploads/business- ClimateUtilities-in-Quincy-and-Adams-County-Illinois.pdf The principles of Context Sensitive Solutions (CSS) will be implemented to address the impact of this project on the community. CSS requires early coordination with stakeholders to better understand the concerns and needs of the community. One of the means to involve stakeholders is to organize an advisory committee of representatives from Quincy, Adams County in Illinois, Marion County in Missouri, businesses, industries and citizens that will provide direct and focused input during the development of the project. A Community Advisory Group (CAG) will be established early on in the study phase. 5

4. Pedestrian and Bicycle Accommodations There are currently no sidewalks or other accommodations for pedestrians or bicyclists to cross eastbound US Route 24 over the Mississippi River. The closest possible river crossing is at the Bayview Bridge, which carries westbound US Route 24 traffic. The Bayview Bridge has a 32-foot deck width consisting of two 12-foot lanes and 4-foot shoulders on each side. Pedestrians are currently prohibited from using this crossing. Bicyclists could be accommodated if the existing pavement marking was revised to two 15-foot lanes; 15 feet is the minimum allowable shared lane width for a two-lane highway structure, although the existing 2-10 parapet (bridge railing) height does not meet current standards for bicycle accommodations. IDOT policy specifies a 4-6 minimum outside railing height to accommodate bicyclists. The required width for a shared use path is 10 feet, which must be physically separated from live traffic by a barrier. Based on IDOT policy for a one-way urban principal arterial roadway structure, the minimum deck width is 30 feet not including shoulders or curb and gutter for shared unmarked bicycle lanes. The public has expressed interest in providing accommodations for pedestrians and bicyclists to cross the Mississippi River since the Mississippi River Trail passes through the project area and there are several existing bike trails throughout Quincy. In accordance with the Illinois Highway Code and IDOT s Complete Streets policy, bicycle and pedestrian accommodations shall be considered in the planning and development of the Memorial Bridge project. 5. Capacity and Adverse Travel As shown in Table 3 below, the existing Memorial Bridge currently carries approximately 9,100 vehicles per day and the projected volume for the Design Year of 2034 is 10,100 vehicles per day. Table 3 Average Daily Traffic Volumes Roadway Existing ADT (2013) Projected ADT (2034) EB US 24 (Memorial Bridge) 9,075 10,100 WB US 24 (Bayview Bridge) 10,800 12,000 US 24 (Missouri) 17,445 19,370 Broadway Street (IL 104) 12,600 14,000 Maine Street (US 24) 7,850 8,720 Although the existing capacity on the bridge is adequate for the design year forecasted traffic, the functionality of the roadway network in downtown Quincy is not ideal. The existing US Route 24 eastbound and westbound one-way streets are separated by three city blocks, which requires traffic to make two ninety degree turns in order to reach Broadway Street (IL 104) and the many destinations on Broadway, including Blessing Hospital. The many one-way streets and directional changes along state routes are not conducive to drivers unfamiliar with the area (See Exhibit 3: Existing Roadway Network). 6

ILLINOIS DEPARTMENT OF TRANSPORTATION US ROUTE 24 QUINCY MEMORIAL BRIDGE Quincy, IL/Marion County, MO LOCATION MAP EXHIBIT 1

US 24 WESTBOUND BAYVIEW BRIDGE US 24 EASTBOUND MEMORIAL BRIDGE ILLINOIS DEPARTMENT OF TRANSPORTATION US ROUTE 24 QUINCY MEMORIAL BRIDGE Quincy, IL/Marion County, MO PROJECT STUDY AREA EXHIBIT 2

ILLINOIS DEPARTMENT OF TRANSPORTATION US ROUTE 24 QUINCY MEMORIAL BRIDGE Quincy, IL/Marion County, MO EXISTING ROADWAY NETWORK EXHIBIT 3

SECTION LOSSES IN SUPERSTRUCTURE MEMBERS 100% SECTION LOSS IN SUPERSTRUCTURE MEMBER ILLINOIS DEPARTMENT OF TRANSPORTATION US ROUTE 24 QUINCY MEMORIAL BRIDGE Quincy, IL/Marion County, MO EXISTING STRUCTURE PHOTOS EXHIBIT 4

ILLINOIS DEPARTMENT OF TRANSPORTATION US ROUTE 24 QUINCY MEMORIAL BRIDGE Quincy, IL/Marion County, MO CRASH DATA EXHIBIT 5