FALL 2014 WORKSHOPS TAKEAWAYS

Similar documents
FOLSOM-HOWARD STREETSCAPE OVERVIEW

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

TRANSBAY JOINT POWERS AUTHORITY

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Paoli Road Improvement Feasibility Study

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

ABOUT THIS OPEN HOUSE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Better Market Street Project. Project Update January 15, 2015

Major Bike Routes 102 Avenue Workshop April 21, 2015

Application of a Complete Street

Community Task Force March 14, 2018

RiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017

Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of

FINAL REPORT DECEMBER 2011

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Bicycle Master Plan Goals, Strategies, and Policies

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Capital Metro Downtown Multimodal Station

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Freeway ramp intersection study

Moving Ahead. (Community Engagement) Chapter Three

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Polk Streetscape Project

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

C C C

Technical Working Group November 15, 2017

Comments EXECUTIVE SUMMARY

The Bay Bridge Corridor Congestion Study

City of Memphis On-Street Parking Modification Guidelines

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Display Boards Including Five Refined Design Concepts

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

PEDESTRIAN ACTION PLAN

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Central Freeway and Octavia Circulation Study

North Shore Transportation Improvement Strategy

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

MEMORANDUM. July 2, 2014

WATERFRONT TRANSPORTATION ASSESSMENT T R A N S P O T A T I O N A U T H O R I T Y B O A R D SAN FRANCISCO, CALIFORNIA

Golden s Plan. For the Highway 6 & 93 Corridor

Recommendations. Central Salem Mobility Study

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Thank you for attending

McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School

Broad Street Bicycle Boulevard Design Guidelines

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Governance and Priorities Committee Report For the July 2, 2015 Meeting

SFMTA PROJECT TIMELINE

September 2017 I City of New Westminster

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

TRANSPORTATION COMMISSION Agenda Staff Report

Mission Bay Loop (MBL) Public Meeting

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

What are the transportation needs in the

Welcome! San Jose Avenue Open House August 25, 2015

Owl Canyon Corridor Project Overview and Summary

MnDOT Implementation of Complete Streets Policy. January 2014

Montford Drive Parking & Circulation Study

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Basalt Creek Transportation Refinement Plan Recommendations

Community Task Force November 15, 2017

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

BICYCLE STRATEGY UPDATE

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL

Cycle Track Design Best Practices Cycle Track Sections

Living Streets Policy

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Austin Avenue Bridges Project. Public Meeting Summary

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Arterial Transitway Corridors Study. Ave

San Jose Transportation Policy

Arterial Management Plan for US Route 250 and State Route 623

Sandwich Pedestrian/Bicycle Planning

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

July 13, Commissioner Richard Sullivan Department of Conservation and Recreation 251 Causeway Street Boston, MA RE: EOEA ENF 13777

Transcription:

SFMTA WORKSHOP FEEDBACK The SFMTA and partner agencies are continuing to utilize feedback from the Fall 2014 workshops to inform priorities and next steps for the Embarcadero Enhancement Project. Throughout summer and fall 2015, the Port of San Francisco is gathering additional input from business-related stakeholders and Port tenants (via a survey and individual interviews) to help round out perspectives on specific transportation needs and concerns. The general concept of a protected bikeway along the Embarcadero is also included in the assumptions for the upcoming Waterfront Land Use Plan Update process, which is also being led by the Port of San Francisco. As the Project transitions from the initial public education/outreach phase to the conceptual design development phase, much work remains to assess and respond to specific ideas generated from the fall 2014 workshops. As a starting point, however, the following comments and next steps are provided to inform interested stakeholders: FALL 2014 WORKSHOPS TAKEAWAYS Based on lack of interest in the fall 2014 workshops, combined with alreadyidentified challenges, the SFMTA will not explore a (separate) center-running bikeway design alternative. A short stretch of center-running bikeway may still be an option, however, if it is helpful to resolve conflicts as part of a successful one-way or two-way bikeway alternative. The SFMTA will conduct a focused mobility and circulation study for the Pier 39 / Fisherman s Wharf area in order to identify and assess bikeway design alternatives and related potential changes within a broader context. More information on this effort will be made available in the fall of 2015. Traffic analysis may need to be integrated into the Project s future environmental review phase. The concept to shift a majority of the vehicular traffic on The Embarcadero to the city-side of the MUNI tracks will be further developed as a potential alternative north/west of Mission Street, and presented at the next series of public outreach events Additional responses to Big Ideas proposed during the workshops are provided on the following page. NEXT STEPS Promote workshop results with business stakeholders to solicit confirmation / reaction to key themes and big ideas Further develop conceptual design options to address intersection design, load zone scenarios, workshop ideas Prepare scope of work for Pier 39 / Fisherman s Wharf focused circulation study Collect additional multi-modal traffic data; incorporate results of Port tenant transportation survey when available Schedule public open house and workshop series #2 for late 2015 / early 2016 A revised project schedule summary graphic is also provided on page 25. 23

The Embarcadero Enhancement Project Underground roadway at Ferry Building with local at-grade roadway Pedestrian bridge from Market Street to Ferry Building / Elevated bikeway Remove traffic from water-side of the Embarcadero Move MUNI tracks to enlarge Ferry Building plaza and create wider Promenade/waterside bikeway Build a new sea wall Big Ideas Cantilevered bikeway over sea wall / Underwater bike route Add sculptural/architectural elements for a bikeway, possibly thematic/gepgraphic Managed bi-directioal traffic lanes by time of day (i.e. movable dividers) SFMTA Comments The SFMTA will confirm underground conditions to inform feasibility, although conflicts are anticipated with the existing BART and MUNI tunnel. High construction costs and impacts may also limit the viability of this concept. Technical requirements for a structure include approximately 450-foot ramps on either side of bridge span, which may not be feasible without significant impacts (depending on location). Potential concerns include accessibility, visual impacts to Ferry Building vistas. Potential elevated bikeway/shared path may be further explored near Pier 39. The SFMTA will study potential consolidation of vehicle travel lanes on the south/west side of the MUNI tracks for the segment adjacent to the Ferry Building. Assumption remains that MUNI tracks will not be moved. A new sea wall is beyond the scope of this project. However, the project will consider potential impacts of sea level rise in the environmental phase and incorporate appropriate mitigations/sustainable design features where practical and in conjunction with ongoing Port seawall replacement analysis/activities. A cantilevered or underwater bikeway would pose numerous conflicts with existing water-related operations (ferries, cruise ships) and historic buildings, and would be cost-prohibitive. This option will not be considered, although the SFMTA may explore limited grade-separation for highly-constrained areas. Will be considered for any/all proposed designs, particularly during the detailed design phase. Project will be subject to City Public Art Ordinance, which mandates up to 2% of the project budget to be allocated for public art. The SFMTA has considered movable roadway diverters (similar to those used for the Golden Gate Bridge) and deemed their use infeasible due to ongoing operational costs as well as a lack of differentiated travel demand (i.e., demand is too steady / bi-directional to warrant flip-flopping of travel lanes). 24

Project Status / Revised Schedule Completed Initial Survey / Open House / Presentations Fall 2014 Design Workshop Series Ongoing / Fall 2015 Port Tenant Transportation Survey Ongoing Stakeholder Presentations Test Design Options for Feasibility Fall 15 / Winter 16 Establish Design Alternatives Conduct Public Open House / Workshop Series #2 Presentations / Refine Alternative(s) To Be Determined Select Preferred Concept Design(s) Environmental Review Phase* Detailed Design* Construction* *Funding has not yet been identified for these phases The Embarcadero Enhancement Project will conduct a public open house and additional workshops in 2015/2016 in order to identify preferred alternatives for a future environmental phase 25

The Embarcadero Enhancement Project This page intentionally left blank 26

APPENDIX A: GAMEBOARD PHOTOS Folsom Street / Rincon Park WORKSHOP #1 Brannan Street / Brannan Wharf Park 27

The Embarcadero Enhancement Project Brannan Street / Brannan Wharf Park King Street / AT&T Park 28

WORKSHOP #2 Ferry Building (Group #1) Ferry Building (Group #2) 29

The Embarcadero Enhancement Project Broadway (Design #2) Broadway (Design #1) 30

WORKSHOP #3 Battery Street / Pier 27 31

The Embarcadero Enhancement Project Chestnut Street / Pier 31 Bay Street / Pier 33 32

Beach Street / Pier 39 33