BEST PRACTICE GUIDE LIFTING OPERATIONS

Similar documents
Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

CPCS renewal test factsheet

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

On the Lee Tunnel project, some significant near misses involving cranes have occurred this year.

PRO Lifting Operations

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

Wilkins Safety Group

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

Safe Work Method Statement

Who Wants To Be a MEWP Millionaire?

MEWP - Boom Note: It is recommended that you read the Supporting Information page before you read this factsheet.

EQUIPMENT. (See also: Management of Health & Safety (51); Fork Lift Trucks (32); Warehousing (87); Work Equipment (91))

Lifting Operation & Lifting Equipment Procedure

MEWP - Scissor Note: It is recommended that you read the Supporting Information page before you read this factsheet.

CPCS renewal test factsheet

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

Contents. P a g e 2. Page 4 Introduction Page 5 Accreditations

Lifting & Hoisting Procedure

SAFETY HARNESSES IN MOBILE ELEVATING WORK PLATFORMS

NAVSEA STANDARD ITEM. 1.1 Title: Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

NAVSEA STANDARD ITEM

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1.

Load Charts Annotated Instructor s Guide. Module MODULE OVERVIEW PREREQUISITES OBJECTIVES PERFORMANCE TASKS MATERIALS AND EQUIPMENT LIST

B S Glass Ltd Safety procedures- outsourced Workplaces

Suitability of Work Equipment

Company Health and Safety Policy

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Provider of Training for the Management & Supervision of Lifting Operations

Specialists Window Cleaning Induction

VALE # Name: Dave Duczeminski Position: Manager Department: Maintenance Engineering

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Work Activity (e.g. Road Work): Work Location:.

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

A25/A26. MEWP Scissor and Boom

March 1999 Presentation on "Lifting Operations and Lifting Equipment Regulations 1998" by Chris Davies, HM Inspector, HSE Midlands Region.

TLILIC2001 Licence to Operate a Forklift Truck

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

Safe Use of Telehandlers in Construction Second Revision

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

Safe Work Method Statement

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS

CONTRACTOR SAFETY INDUCTION HANDBOOK

Guidance on Using Temporary Suspended Access Equipment

CPCS renewal test factsheet

Lifting Beam. Introduction. Important Notes. Key Benefits. User Guide

FATAL AND SEVERE RISK PROGRAM


LADDERS FIXED AND PORTABLE

Use of MEWPs in Arboriculture

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

Safe Work Method Statement

Don t let a fall shatter your life!

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

SOP GEN-007X Crane and Winch Operations

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

Health and Safety Code of Practice. SCP38 Working at Height

Safety in Precast Erection

Method statement for. The installation of. Precast Concrete Piles. (Site Name).

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Safe Working at Heights Theory Assessment

FALL PROTECTION (SAF-SPI-06)

SASOL LIFE SAVING RULES (LSRs)

Safe Work Method Statement

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

Worker s Safety Handbook for Rigger and Signalman

How severely could the risk hurt someone?

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

This guidance note gives simple, practical advice on what can be done to eliminate or reduce the risks.

1. SHEWMS DETAILS. Project No. Valid From

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

Fall Arrest; Then, Now and Tomorrow.

INSTALLATION, OPERATION AND SERVICE MANUAL ABS AIR BAG LIFT

M&EE Networking Group

Global EHS Powered Industrial Truck and Pedestrian Safety

Lifting Equipment Protocol

SEMFEW339 - SQA Unit Code H1WC 04 Slinging, lifting and moving materials and components

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

SAFE WORK METHOD STATEMENT

Safe Work Procedure for installation of external cladding

FA L L P R O T E C T I O N P L A N N I N

M ANITOWOC M-65 W. 65-MTon liftcrane 6,804 6,124. Courtesy of Crane.Market KG CLAMSHELL KG DRAGLINE

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

Provides the underpinning knowledge and practical experience on the safe and effective operation of the Automatic Ballast Sampler.

Contractor handbook. Purpose

PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS

Waste Industry Safety & Health

GOLDEN SAFETY RULES AFT DR

The Sample Company Pty Ltd

Total s Golden rules

Transcription:

BEST PRACTICE GUIDE LIFTING OPERATIONS LIFTING OPERATIONS MOVING LONDON FORWARD Best Practice Guide Lifting Operations Page 1 of 26 EA598_H&S_LM

A best practice guide produced in collaboration between: Index INTRODUCTION 2 HISTORY 3 This guide has been completed through voluntary contributions from Crossrail and Crossrail Contractor staff. The guide content has also utilised valuable information supplied by Crossrail subcontractors, namely: Laing O Rourke, Dragados Sisk Joint venture, GGR Cranes, Lifting Gear UK and Hewdens. THE BASICS 4 Lift Plan Basics 5 Team Structure & Roles 6 Competency 7 Communication 8 Slinging 9 Lifting Accessories 10 Lifting with Plant 11 CROSSRAIL ASPECTS 12 Blind Lifting 13 TIght Space Lifting 14 Crane Coordination 15 Lorry Unloading 16 TOP 10 CHECKS 17 LIFTING AFTER CIVIL CONSTRUCTION 19 Spider Cranes 20 MEWPs (Mobile elevated working platforms) 21 Manual Winches & manual gantry cranes 22 Counter Balance Cranes & Vacuum Suction Pads 23 Telehandlers & Pump trucks 24 NOTES 25 Best Practice Guide Lifting Operations Page 2 of 26 Best Practice Guide Lifting Operations Page 1 of 26

Introduction The Crossrail Lifting Operations Best Practise Guide has been created using lessons learned from lifting operations across the Crossrail project. The intent of the document is to: Raise awareness and improve understanding of lifting operations. Act as a reference document for all operatives. Demonstrate what good looks like. Provide Legacy information to future projects. History Lifting Operations is one of Crossrail s nine High Risk Activities (HRAs). A review of incidents from Period 1, 2013/14, to Period 10, 2014/15, identified 524 incidents in relation to Lifting. LIFTING OPERATIONS A breakdown of these by Incident level and classification is provided below. Lifting Incidents * This guide includes references to innovations, developed during the Crossrail project. Details of these are available through the Crossrail Learning Legacy website learninglegacy.crossrail.co.uk 90 80 3 Level 1 = 0 Level 2 = 26 Level 3 = 200 70 1 60 35 Level 4 = 298 50 27 4 21 13 40 24 30 13 1 2 20 43 40 34 38 12 12 8 1 9 4 10 0 Contact with object Incorrect equipment Bad prac@ce Exclusion zone Equipment failure 22 23 8 5 8 1 17 14 3 3 12 12 3 2 7 2 1 6 6 5 6 6 3 4 LiH plan Unsecured load Working under suspended Dropped load Communica@on Damaged equipment Extended swing radius Contact with person Chandelier lih General Uncontrolled lih Competence Unstable ground Best Practice Guide Lifting Operations Page 2 of 26 Best Practice Guide Lifting Operations Page 3 of 26

Part A The Basics This section details topics which are common to all lifting operations Lift Plan Basics What basic information and documents should be included in a lift plan? Risk assessment/method statement. Letter of appointment roles and responsibilities. Crane information, including working radius diagrams. Schedule of common lifts (minimum columns): Item Weight Lifting Method Schematic / Photograph Notes and Good Practise (Complex lifts should be covered by a separate lift plan). Lifting zone control measures. No item to be lifted without an approved lift plan. The Appointed Person should be immediately informed if one is not in place. Have you considered? The site layout and how it will change with time. Construction progress (openings: Access/Egress) and lifting zones. Using scaled drawings for mapping. Crossrail innovations to consider (see Learning Legacy website for details): INV00188 LiftPROApp. INV00021 Magnetic Logisitic s Board. INV00174 Activity Board. INV00728 Hazard Identification Meeting. Best Practice Guide Lifting Operations Page 4 of 26 Best Practice Guide Lifting Operations Page 5 of 26

Team Structure & Roles To execute safe lifting practise it is important to know and understand the roles and responsibilities of team members. There are three key positions for planning and executing lifting operations: Appointed person Responsible for planning and controlling all aspects of the lift, (producing the lift plan, method statement, risk assessment and choosing the crane and accessories). Crane Supervisor Responsible for supervising the lifting operation and ensuring the lift plan is adhered to and the method statement is followed. Competency The relevant qualifications of team members related to lifting activities should be approved and recorded. Lifting operatives must have a valid CPCS card (Red: Trained Operative, Blue: Competent Operative) or ALLMI (Association of Lorry Loader Manufactures and Importers). Training and mentoring should be ongoing for everyone (red card operatives need a minimum 300hrs to be eligible to apply for blue card). Crossrail innovations to consider (see Learning Legacy website for details): INV00239 Interactive Induction. INV00758 Coloured Armbands after Briefings. Slinger/Signaller Responsible for attaching/detaching the load and directing the crane using the agreed signalling method. In tunnelling environments such as Crossrail, there are further key roles which will interface with lifting operations: Pit boss Overall responsibility for ensuring the safe and efficient execution of works within an area and liaising with Shift Managers, Shift Engineers, Lead Miners and other Pit Bosses. Lead miners Responsible for ensuring safe and efficient execution of works within their work area and liaising with Shift Managers, Shift Engineers, Pit Bosses and other Lead Miners. The level of competence and the quality of communication are also major aspects for the execution of safe lifting practise. Competence verification including onsite practical. New starters or red card holders, to have documented mentoring until competence is approved. CPCS qualification achieved in the language of Project working. Best Practice Guide Lifting Operations Page 6 of 26 Best Practice Guide Lifting Operations Page 7 of 26

Communication There are various Communication styles: Audible Communication: Conversation, Radio, Head Sets, Alarms. Visual Communication: Hand Signals (BS7121), Signage, Lights, Site Plans. Physical Communication: Barriers, Vibration alarm. Meetings (daily/weekly and task start briefings). Forums (Share knowledge and Improve site operations). Signage / Exclusion zones to have regular reviews. Variation of the lifting warning sound to avoid local workforce becoming desensitised. Crossrail innovations to consider (see Learning Legacy website for details): INV00216 Wind Alert Levels. INV00015 Safety Peer Review. INV00045 Safety Glove Messages. INV00174 Activity Board. INV00021 Magnetic Logisitics Board. INV00239 Interactive Induction. INV00810 Wireless Banksman Alarm. INV00073 MyZone. INV00089 Green Beacon. Best Practice Guide Lifting Operations Page 8 of 26 Best Practice Guide Lifting Operations Page 9 of 26

Slinging Lifting Accessories The Lift Plan (Item, Weight, Lifting Method, Lifting Points, extra notes). Manufacturer s lifting Instructions. Lifting accessories and their correct attachment configurations. Common slinging arrangements (pictures). Crossrail do not allow Chandelier Lifts. Any lift not in the schedule of common lifts, should have its own bespoke approved lift plan signed by the Appointed Person. Conducting a test lift (should be conducted for all lifts). The slinging method and the associated reductions to the load capacity. The security of the load (An extra method may be required to secure the load, i.e a ratchet strap). 80 o 75 o 60 o 45 o 7t 10t 20t 30t Which accessories can be used for which loads. How to correctly inspect you accessories before and after each use. When the equipment was formally inspected (Maximum 6monthly which colour code is currently active). How/where to quarantine/discard defective or damaged equipment. Crossrail do not approve the use of 1 Tonne single-use bags, as a lifting container, in and out of a shaft. They should be placed in a lifting cage of other approved lifting container. Checking the lift plan for recommended accessory to be used. The reduction in load capacity due to lifting accessory and slinging method. Sling Material Sinlge leg in-line Sinlge leg choked Chain 1 0.8 Wire Rope 1 1 Webbing 1 0.8 Fibre Rope 1 0.8 Round N/A N/A Horizontal Force As the angle of the load increases, the safe working load decreases. Are the slings single use, will multiple lifts be required. Crossrail innovations to consider (see Learning Legacy website for details): INV00562 Bespoke Lifting Cage. Single leg in-line Single leg choked How you will safely attach and detach the load. Where will the centre of gravity will be. Best Practice Guide Lifting Operations Page 10 of 26 Best Practice Guide Lifting Operations Page 11 of 26

Lifting with Plant The safe working load limits (WLL) of the plant. Each lifting plant requires its own lift plan, tracked lifting should be included in the schedule of common lifts. Excavator lifting requires additional CPCS qualification. All excavators lifting loads over 1t must have an installed Safe Load Indicator (SLI) and must have check valves. Lorry Loader (hiab) require an offloading check sheet with test certs and driver competency. The suitability of selected plant and lift plan. The ground stability and slope of your lifting area,(beware of slopes and excavations). How the load will move/rest when tracking during lifting. The tracking route and interface with pedestrians/other. Crossrail innovations to consider (see Learning Legacy website for details): INV00144 360Degree CCTV. INV00740 Optronics. INV00352 Lifting of Plant. INV00504 Excavator Warning Lights. Part B Crossrail Aspects This section details topics which common to the Crossrail project Best Practice Guide Lifting Operations Page 12 of 26 Best Practice Guide Lifting Operations Page 13 of 26

Blind Lifting Tight Space Lifting Blind lifting associated incidents are typically related to: Communication. Load path and when the load becomes blind. Crossrail innovations to consider? (see Learning Legacy website for details): Hook Cam mounted on the hook block to assist the crane driver. Tight Space lifting is often similar to Blind lifting, though communication problems are heightened by dimensional issues with the load and proposed load path. Crossrail innovations to consider? (see Learning Legacy website for details): INV00562 bespoke Lifting cage. An understanding of the blind zone (layout, exclusion zones, controls in place, personnel, etc). The dimensions of the load. The dimensions of the opening/ load path. Communication method between all members of the lifting team. Can at least one slinger/signaller see the load throughout the entire lifting operation. What is creating the obstructions? Propping systems, electrical/ mechanical services, Scaffolding/ Edge protection (Think: Risk, Mitigation, Recovery). The noise in the lifting environment. Slinger/Signaler safe location and sufficient visibility of the load path. Adopting the Two second rule when the driver losses contact with the slinger the lift is ceased until communication has been re-established. (Radio s: check your battery and have a spare one to hand). Off level slinging and associated effects to load capacity. Utilising a lifting bag/quiver. That the jib is centralised over the load prior to lifting. Best Practice Guide Lifting Operations Page 14 of 26 Best Practice Guide Lifting Operations Page 15 of 26

Crane Coordination Lorry Unloading Crane coordination increases the demand for clear, concise designation of roles and responsibilities and associated communication. Interface Construction Documentation. Load Path interaction with working zones and site boundaries (multiple principal contractors). How to programme a lift (daily/ weekly crane coordination meetings). Who has overall responsibility and control for each lift. Crossrail innovations to consider? (see Learning Legacy website for details): INV00021 Magnetic Logisitics Board. INV00073 MyZone. INV00089 Green Beacon. INV00810 Wireless Banksman Alarm. INV00146 Collaborative Planning. Is the load pre-slung or will it require slinging. Can the load be attached from ground level. Is assistance required to sling the load. Is there a safe method to access the load; walking route on the lorry bed, working at height (edge protection, harness, designated anchor points, rescue plan). Is there other materials on the lorry bed preventing safe access or lifting. Can the lifting operator see the load and the full surrounding environment. An exclusion zone to prevent people entering a pinch point or crush zone. Can the lorry access site to a location that will require a singular lift to storage or delivery location (avoid double handling). Is there sufficient space allocated for delivery (avoid stacking and double handling). Oversailing of the load (clear defined boundaries). Utilising SMEE restrictions. Notification of lifts and implementation of temporary exclusion zones (typically for over sailing: signage, alarms, lights). Different lifting warnings for different cranes. Best Practice Guide Lifting Operations Page 16 of 26 Best Practice Guide Lifting Operations Page 17 of 26

Part C Top 10 Checks The section details a simple checklist to consult prior to lifting operations Top 10 Checks Before Have you checked the Lift Plan? Have you inspected the equipment for damage? Is the load secure and will it be stable during lifting? Are all staff ready to commence and in positions of safety? Where is the lifting/load path/laydown areas? Will there be communication or visibility difficulties during the lift? Is the load path clear? Communicate the start of the Lift. Has a practise lift been performed? After Have you inspected the equipment for damage? Is there anything which could be improved? Best Practice Guide Lifting Operations Page 18 of 26 Best Practice Guide Lifting Operations Page 19 of 26

Part D Lifting after Civil Construction This section details lifting plant to be utilised in the future of the Crossrail Project Spider Cranes Regulation Operatives should be CPCS A66 qualified. Check and utilise as per manufacturing specifications. Check regulation safe working load of the crane, Spider cranes should have a safe load indicator. The maximum wind speed a spider crane should be used is 10 meters per second. Ticks / Do s Check for a firm and level ground. Testing and outrigger mats may be required. Lift plans are required. Spider cranes always require a lift plan. All loads to be attached and detached by CPCS accredited slinger signallers. Crosses / Dont s Do not feel pressured to utilise plant up to its safety limits. (ie wind speed 10m/s). Always access the conditions as per the environment. Do not use if you are not qualified, have not been briefed, are not familiar with the plant. Best Practice Guide Lifting Operations Page 20 of 26 Best Practice Guide Lifting Operations Page 21 of 26

MEWPs (Mobile elevated working platforms) Regulation There must be a rescue plan in place in the unlikely event that someone is injured or equipment fails. Operatives must be able to prove competence and training by holding IPAF or CPCS accredited qualifications. Ticks / Do s MEWPs come in all shapes and sizes, from Boom lifts (articulated and telescopic lift) to scissor lifts (vertical lift). Use the right MEWP for the task. Sequence activities to minimise risks when utilising a MEWP. (Obstructions, Concurrent Works, Entrapment, etc). Try to eliminate working at height if possible. If a MEWP is required, having a banksman is considered best practise. Crosses / Dont s Use unsecured tools and materials. Make sure equipment cannot fall and set an exclusion zone below a MEWP. Utilise a MEWP without considering the working environment. Be cautious for entrapment and overturning. Manual Winches & manual gantry cranes Manual Gantry Cranes Must be used by operatives who have been familiarised with how to operate this equipment. Must not exceed safe working load at any time. Ground conditions must be suitable for the gantry crane to manoeuvre with a load. The person operating the gantry crane must assess the planned route prior to operation. Consider the motion of the load when manoeuvring (swinging of the load). Should have a lift plan. Manual Winches Firstly check that the equipment is fit for use and that there is no damage to the equipment. Never exceed the safe working load (This should be visible on the equipment!) Should always establish where the centre of gravity of the load is by assessing the load prior to lifting. Must have regular inspections, which should be documented. Always visually inspect before use. Best Practice Guide Lifting Operations Page 22 of 26 Best Practice Guide Lifting Operations Page 23 of 26

Counter Balance Cranes & Vacuum Suction Pads Counter balance crane Should be fit for use with no damage to hook or crane. Should not exceed the safe working load. If this is not clearly marked do not use the equipment. Operatives must have been familiarised with the piece of equipment and prove competency before use. Must be used in accordance with manufacturers specifications. It is best practice to have a fail safe mechanism e.g. dual action suction pads. Exclusion zone under the lifting operation are mandatory. Telehandlers & Pump trucks Telehandler It is essential that you first look at the load and whether it is suitable for transportation. Ideally lifting of materials will have specified points for the forks to be placed. On occasions this will not be available, materials should be positioned to be evenly balanced across the forks. The route for transportation is key as you aim to have a steady load at all times whilst in transit. If a pallet is being used, check for damage before every use, quarantine damaged pallets. Underslung loads only to be permitted when operators have undergone additional CPCS Cat E training (suspended loads) covering this activity. Pump Trucks Instead of using telehandlers or forklift trucks to move palletised materials you can use pallet trucks. Pump trucks must be suitable for the load to be lifted and must be used within the manufacturer specifications. This method reduces manual handling but still requires manual labour to transport the load. Ground conditions must be suitable for transportation via a pump truck. Check the pallet is not damaged before every use, quarantine damaged pallets. Vacuum suction pads Must be regularly inspected and documented. Must be the correct type of suction pad suited to the material it is lifting. Best Practice Guide Lifting Operations Page 24 of 26 Best Practice Guide Lifting Operations Page 25 of 26

Notes Notes Best Practice Guide Lifting Operations Page 26 of 26 Best Practice Guide Lifting Operations Page 27 of 26