RST INSTRUMENTS LTD.

Similar documents
PACKER OPERATING PROCEDURES

OCEAN DRILLING PROGRAM

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Precision Liquid Settlement Array Manual

RG1200 Service and Repair Manual

Inflatable Packers for Grouting 11/10/00

INSTRUCTION MANUAL. January 23, 2003, Revision 0

!!!! SERVICE MANUAL PRESSURE POT 2 GALLON. Service Manual: LT Washington St 931 Progress Ave., #7

Pressure Dump Valve Service Kit for Series 2300 Units

ATD LB PRESSURE BLASTER INSTRUCTION MANUAL

Pressure Dump Valve Service Kit for Series 3000 Units

with self-sealing gas valve system

UNITY 2. Uni-DAAMS Manual. Version 1.3 (Changes to Section 1.1) March 2010

THE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301

Steel Spring Driven Reel Instruction Manual

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

PANACEA P200 STAINLESS STEEL USER MANUAL

4400 TwinHybrid Gas Seal

H4802, H4802-1, H , and Pole Tampers

THE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401

Operating Procedure TITON SUBSEA BOLT TENSIONER

Instruction Manual Updated 7/26/2011 Ver. 2.2

Operating Instructions Models and Hydrostatic Test Pumps

CMT Multilevel System Assembly Manual

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

Constant Pressure Crude Oil Container Model CPCCP

PANACEA P125 USER MANUAL

Retractable Hose Reel with 3/8" x 50' PVC Hose

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

FITTINGS THREAD LUBRICANTS. Fittings 20,000 PSI

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

5/16 MAXFLOW SPOUTS 17/64 MAXFLOW SPOUTS. 5/16 black spout with barbs $0.25 $ /64 white spout without barbs. 5/16 white spout without barbs

DBML-60/80 Squeeze Tool

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

INSTRUCTION MANUAL. PRESSUREMETER Model PENCEL. Roctest Limited 2016, All rights reserved

Poollift Delphin. Version: February, 2015 MANUAL AND OPERATING INSTRUCTIONS

SAILTEC, INC CONGER COURT, OSHKOSH, WI USA

Installation Instructions

PANACEA P100 LOW PRESSURE USER MANUAL

G7S Hand Pump Owner s Manual

Freedom8 ShoeBox Compressor Manual

8. Carefully layout all the parts of the reservoir setup and clean any dirt, grime or dust from the parts. ( image 8 ) 8

SIGNATURE DEF REELS Models: Bare Reel Reel Reel Reel

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

KJ4000 Operating Instructions & Parts Manual NSN

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

Air Operated Hydraulic Pumping Systems to 50,000 psi

Hodge Clemco Ltd. SG-300 Suction Gun. Owner s Manual. Hodge Clemco Ltd

First the grid is assembled: bend it round so that the fixing hooks go from outside to inside.

DM-WH (English) Dealer's Manual. MTB Wheel Set. Non-Series WH-MT68 WH-MT66 WH-MT35 WH-MT15

HYDRAULIC PUNCH DRIVER 38456, 38520, 7306 / 7306SB, 7310 / 7310SB, 7506, 7606SB, 7610SB, 7625 / 7625Pg / 7625PgSB, 7646 / 7646Pg / 7646PgSB

! CAUTION! ! WARNING! General Information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

APP pumps APP and APP Disassembling and assembling

MUELLER GAS. No-Blo Operations Using D-5. Drilling Machine. Reliable Connections. General Information 2

3/8" Dr. Air Butterfly Impact Wrench

Single and Triple Rain Barrel Setup

MUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.

Booster Pump PB4-60 Replacement Kits

Index Table. Model 794. Installation, Operating and Maintenance Instructions

SIMPLAIR PIPING TOOL. JXT Company

Yoke Block Instruction Manual

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

DM-RCWH (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Wheel Set. WH-RX31 SM-AX x12 SM-AX x12

2 in. 18 Gauge Brad Nailer. User manual

BLADDER CARE INSTRUCTIONS

Operating Instructions Models 36200, , 46200, Hydrostatic Test Pumps

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Compact Triple Cabinet Outlet Station Model Installation and Operating Instructions

Media-Isolated Mag Plus Probe Low Pressure-ISO Kit

On-Off Connector Skirt

12S 1st Stage. -Maintenance Procedure-

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

Installation Instructions and valve Maintenance Rev. 0 of 21/09/15

Installation and commissioning instructions 255 series and 256 series

ATD /8 x 50 Retractable Air Hose Reel Owner s Manual

LEAK TROUBLESHOOTING

Hydro-Mech Bridge Plug

D05 Pressure Regulating Valves

QUIK-jet Micro-Injection System

Disassembling and assembling APP and APP 16-22

PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web:

Standard Grout Header. Protected Pressure Gauge. High Pressure Gauge. In-Line Grout Header. Inline Protected Pressure Gauge

3" UC Ultra-Chuck Durable Lightweight Air Inflated Bladder Chuck Operation/Repair Manual. (76.2 mm) DOUBLE E COMPANY, INC.

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

Installation, Operation, and Maintenance Manual

Hydrostatic Pressure Testing

Series RT Spring Driven Hose Reels Operating Instructions

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

Helium-Oxygen Blender

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

BCV31 DN20 - Blowdown Control Valve

PVQ 13 A2 R SE 1 S 20 C-11 D

Transcription:

RST INSTRUMENTS LTD. Borehole Packers Instruction Manual Copyright 2016 Ltd. All Rights Reserved Ltd. 11545 Kingston St., Maple Ridge, B.C. Canada V2X 0Z5 Tel: (604) 540-1100 Fax: (604) 540-1005 Email: info@rstinstruments.com Website: www.rstinstruments.com

i INSTRUCTIONS FOR ASSEMBLY AND USE OF RST BOREHOLE PACKERS Although all efforts have been made to ensure the accuracy and completeness of the information contained in this document, reserves the right to change the information at any time and assumes no liability for its accuracy. Product: Borehole Packers Installation Manual Document number: BPM0001G Borehole Packer Instruction Manual Revision: G Date: May 31, 2016

ii Table of Contents 1 GENERAL DESCRIPTION... 1 2 METHOD OF ASSEMBLY... 1 3 LOWERING & INFLATING THE PACKERS... 7 4 DEFLATING THE PACKERS... 7 5 DETERMINING PRESSURE NEEDED TO INFLATE PACKERS... 7 6 REVIEW... 8 7 SAFETY... 8 8 CHANGING THE PACKER GLAND... 9 9 TROUBLE SHOOTING... 9 List of Figures Figure 1: Wireline Triple Packer Setup... 2 Figure 2: Wireline Double Packer Setup... 3 Figure 3: Double Shafted Packer... 4 Figure 4: Sampling Pump Setup... 5 Figure 5: Pressure Sensor Setup... 6 Figure 6: Packer Test Setup... 10 Figure 7: B Packer Inflation Curve... 11 Figure 8: N Packer Inflation Curve... 12 Figure 9: H Packer Inflation Curve... 13 Figure 10: P Packer Inflation Curve... 14 Figure 11: I85 Packer Inflation Curve... 15 Figure 12: P5-9 Packer Inflation Curve... 16 Figure 13: P6-10 Packer Inflation Curve... 17 Figure 14: P8-12 Packer Inflation Curve... 18 Figure 15: P10-16 Packer Inflation Curve... 19 Figure 16: P12-20 Packer Inflation Curve... 20 Figure 17: BP1000 Packer Inflation Curve... 21 Figure 18: BP1002 Packer Inflation Curve... 22 Figure 19: BP1004 Packer Inflation Curve... 23 Figure 20: BP1006 Packer Inflation Curve... 24 Figure 21: BP1008 Packer Inflation Curve... 25

1 1 GENERAL DESCRIPTION RST Borehole packers are designed to enable permeability or other packer testing to be performed in open holes and through-the-bit in diamond drill holes, using the drill rods to conduct the test water. Although these instructions below primarily deal with through-the-bit applications, the methodology is the same for open hole applications. To carry out a test, the diamond bit is pulled back from the bottom of the hole by some predetermined amount and the packer assembly is lowered through the rods until the seating cone comes to rest on the drill bit. In this position, the lower packer of the system has passed through the bit and is suspended just below it, while the upper packer remains inside the rods just above the bit. Thus, when the two packers are inflated the lower one packs off the hole and the upper one packs off the rod. The portion of the hole to be tested then becomes the section between the lower packer and the hole bottom. When straddle zone testing, three packers are required. The Portion of the hole to be tested is then the section between the middle and lower packer. (see Figure 1: Wireline Triple Packer Setup) 2 METHOD OF ASSEMBLY It will be noted that each individual packer has one end, which is fixed, and one end which is free to slide along the stainless steel pipe which forms the mandrel of the packer. This sliding end is attached to the packer only by the inflatable gland, and cannot, therefore, transmit torque. On no account should wrenches be applied to the sliding head, or to the central shaft, on which they slide, when assembling or dismantling the system. It should also be noted that the ends of the packers are equipped with 1/8 NPT to 3/16 tube connectors for attaching inflation line. Since the packers used are identical, it is immaterial which packer is chosen to be the upper, and which to be the middle or lower one. To avoid possible damage when screwing plugs or tube fittings into or out of the air inserts in the sliding heads, always hold the sliding head with a wrench before applying torque to the fitting being screwed in or out. Similarly, when screwing bushings or other fittings on or off the stainless steel shaft which protrudes through the sliding head, always hold the shaft with a wrench or vise-grip to avoid loosening it where it screws into the fixed head of the packer. To avoid damaging the seal, always hold the shaft at the end furthest from the sliding head.

2 STUFFING BOX WIRELINE TO INFLATION SUPPLY TO WATER SUPPLY WIRE LINE SWIVEL ADAPTER PIPE COUPLING DRILL RODS SLIDING HEAD UPPER PACKER FIXED HEAD SEATING CONE 6" PIPE NIPPLE DRILL BIT WATER PIPE FIXED HEAD MIDDLE PACKER SLIDING HEAD PIPE COUPLING TEST ZONE PERFORATED SPACER PIPE (for zone testing) FIXED HEAD SLIDING HEAD LOWER PACKER PIPE CAP Figure 1: Wireline Triple Packer Setup

3 STUFFING BOX WIRELINE TO INFLATION SUPPLY TO WATER SUPPLY WIRE LINE SWIVEL ADAPTER PIPE COUPLING DRILL RODS SLIDING HEAD UPPER PACKER FIXED HEAD SEATING CONE 6" PIPE NIPPLE DRILL BIT WATER PIPE FIXED HEAD BOTTOM PACKER SLIDING HEAD TEST ZONE Figure 2: Wireline Double Packer Setup

4 Figure 3: Double Shafted Packer

5 Figure 4: Sampling Pump Setup

6 Figure 5: Pressure Sensor Setup

7 3 LOWERING & INFLATING THE PACKERS When the packers are being lowered, tape the air line to the wire-line every 20-25 allowing no slack, except for the six inches of slack immediately above the top packer. Lower the packer wire until you feel or hear the seating cone clunk into the bit. Calculate the pressure needed for sealing the borehole (see Section 5). Slowly inflate the packer by opening the regulator gradually. The delivery pressure (pressure in the air line) gauge will show a gradual upward movement and you will hear air escaping into the line. Allow 50psi of air into the line at a time, adding air only when the hissing has subsided. DO NOT GIVE THE SYSTEM A BIG SHOT OF AIR ALL AT ONCE. After the delivery pressure gauge reads the appropriate pressure, close the regulator. The bottle pressure gauge will fall but the delivery pressure should remain constant. If the delivery pressure needle falls, it means there is a leak in the inflation system somewhere - a poor air fitting, for example. NOTE: The inflation procedure may take up to 20 minutes, depending on the depth of the borehole and the size of the packer. DO NOT RUSH this procedure. 4 DEFLATING THE PACKERS After the pump tests are completed, loosen off the packer stuffing box and remove the washers and rubbers. Open the bleed valve on the regulator and allow the air to escape. The air will rush out to the hose while the packers are deflating. When no air is escaping from the hose, allow an additional 5 minutes for complete deflation. Then, GENTLY pull on the wire line and the packer should come free through the bit. If the packer heads hang up on the bit, rotate the head as slowly as you can and jiggle the wire line up and down till the packers come free.. Rewind the airline onto the reel at the same time. Do not allow any slack to develop in the airline within the rods during retrieval since it will pile up and jam between the rods and the cone or uppermost packer. DO NOT TRY TO RUSH ANY OF THESE PROCEDURES!! 5 DETERMINING PRESSURE NEEDED TO INFLATE PACKERS Use the following formula to determine the pressure needed to obtain a proper seal and prevent damage. P 1 = Static head of water P 2 = Test injection pressure at collar + head of water in shaft Pp max = P 1 + packer maximum working pressure for hole diameter (from Packer Inflation Curve) Pp min = P 2 + P to contact borehole wall (from Packer Inflation Curve) + 50 psi Where Pp max is the maximum safe pressure before damage to the packer can occur Where Pp min is the minimum pressure to insure proper seal and prevent slippage Inflation pressure needed, P i, should be: Ppmax > Pi >Ppmin e.g.: N packer in a 2.5 hole. Packer set at 900 feet. Static water level above packer 700 ft. test injection pressure at collar 100psi.

8 Therefore, P1 = 700 (0.43) = 301psi P2 = 100psi + 900 (0.43) = 487psi Ppmax = 301psi + 1350psi = 1651psi Ppmin = 487psi + 120psi + 50psi = 657psi Therefore choose an inflation pressure, Pi, of 1651>Pi >657 6 REVIEW a) Thread Packer Stuffing Box in Top Rod. b) Lower the Packers. c) Inflate Packers. d) Fill Rods with Water. e) Tighten Down Packing Nut on Stuffing Box. f) Begin Tests Under Engineer s Instructions. g) Deflate Packers h) Retrieve Packers i) Check Glands for Tears or Blisters Before Re-inserting. j) Repeat steps A thru I for Next Test. 7 SAFETY In the interest of safety, the following points should be carefully noted. 1) These packers are high-pressure devices, designed to operate at high internal pressures. Under no circumstance should they be inflated above the maximum unconfined working pressure given in the packer specifications in an unconfined situation. e.g: In the open, when testing air line connections for leaks, etc. 2) The packers should never be inflated, even partially, without ensuring that a pipe coupling, or bushing, or some such restraining device is screwed on the end of the shaft which protrudes through the sliding packer head. This is so that in the event of the rubber gland having been damaged, the sliding head cannot fly off if the gland fails. 3) When the packers are in place down the hole, and fully inflated, never stand in the line with the opening of the hole. If, because of damage or some other unforeseeable cause, the packers should fail under these conditions, material can be blown from the hole with great violence. 4) When assembling the system, make sure that all screw-on fittings and couplings are tight. 5) Inflate packers very, very gradually.

9 8 CHANGING THE PACKER GLAND 9 TROUBLE SHOOTING The most common cause of problems with this equipment is air leaks. Make sure that all tube connections are clean before assembling, and when tightening with a wrench, use firm pressure only. DO NOT OVER TIGHTEN. In bad ground, the system may have to be relocated elsewhere in the hole because the lower packer may not completely pack off the hole. A test to ascertain whether the lower packer is effectively packing off the hole may be done as follows: pour water through the rods until return flow is observed at the collar, around the outside of the rods. Then, with the water flow being maintained continuously, inflate the packers. If the lower packer is effectively sealing the hole, the return flow at the collar will cease.

10 Figure 6: Packer Test Setup

11 mm 76.2 in 3.0 B Packer BQ Packer 71.1 2.8 66.0 2.6 61.0 2.4 55.9 2.2 Borehole Dia. 50.8 45.7 40.6 2.0 1.8 1.6 Operating Zone 35.6 1.4 30.5 1.2 25.4 1.0 20 1379 40 2758 60 4137 Pressure 80 5516 100 120 psi 6895 8274 kpa Figure 7: B Packer Inflation Curve

12 mm in 114.3 4.5 NQ N Packer 101.6 4.0 88.9 3.5 Borehole Dia. 76.2 3.0 63.5 2.5 Operating Zone 50.8 2.0 38.1 1.5 20 1379 40 2758 60 4137 80 5516 Pressure 100 6895 120 140 160psi 8274 9653 11032 kpa Figure 8: N Packer Inflation Curve

13 mm 152.4 in 6.0 H HQ Packer 139.7 5.5 127.0 5.0 114.3 4.5 Borehole Dia. 101.6 88.9 4.0 3.5 Operating Zone 76.2 3.0 63.5 2.5 50.8 2.0 20 1379 40 2758 60 80 100 120psi 4137 5516 6895 8274 kpa Pressure Figure 9: H Packer Inflation Curve

P Packer 14 Figure 10: P Packer Inflation Curve

15 mm 215.9 in 8.5 I85 185 Packer 203.2 8.0 190.5 7.5 177.8 7.0 165.1 6.5 Borehole Dia. 152.4 139.7 127.0 6.0 5.5 5.0 114.3 4.5 Operating Zone 101.6 4.0 88.9 3.5 76.2 3.0 10 690 20 1379 30 2069 40 50 2758 3448 Pressure 60 4137 70 4827 80 5516 psi kpa Figure 11: I85 Packer Inflation Curve

16 mm in 266.7 10.5 P5-9 Packer 241.3 9.5 215.9 8.5 Borehole Dia. 190.5 7.5 165.1 6.5 Operating Zone 139.7 5.5 114.3 4.5 10 690 20 1379 30 2069 Pressure Figure 12: P5-9 Packer Inflation Curve 40 50 60 70 psi 2758 3448 4137 4827 kpa

17 mm 304.8 in 12.0 P6-10 P6-10 Packer 279.4 11.0 254.0 1 Borehole Dia. 228.6 203.2 9.0 8.0 Operating Zone 177.8 7.0 152.4 6.0 127.0 5.0 10 690 20 1379 30 2069 Pressure 40 50 60 70 psi 2758 3448 4137 4827 kpa Figure 13: P6-10 Packer Inflation Curve

18 mm in 368.3 14.5 P8-12 Packer 342.9 13.5 317.5 12.5 Borehole Dia. 292.1 11.5 266.7 10.5 241.3 9.5 Operating Zone 215.9 8.5 190.5 7.5 10 690 20 1379 Pressure 30 2069 40 2758 50 psi 3448 kpa Figure 14: P8-12 Packer Inflation Curve

19 mm in 457.2 18.0 P10-16 Packer 431.8 17.0 406.4 16.0 381.0 15.0 Borehole Dia. 355.6 14.0 330.2 13.0 304.8 12.0 Operating Zone 279.4 11.0 254.0 1 228.6 9.0 10 690 20 1379 30 2069 Pressure 40 2758 50 3448 psi kpa Figure 15: P10-16 Packer Inflation Curve

20 mm in 596.9 23.5 P12-20 Packer 546.1 21.5 495.3 19.5 Borehole Dia. 444.5 17.5 393.7 15.5 Operating Zone 342.9 13.5 292.1 11.5 10 690 20 1379 30 2069 Pressure 40 2758 50 3448 psi kpa Figure 16: P12-20 Packer Inflation Curve

21 BP1000 PACKER INFLATION CURVE 3.5 3.3 3.1 OD,max 2.9 OUTSIDE DIAMETER, inches 2.7 2.5 2.3 2.1 OD,min 1.9 1.7 1.5 5 10 15 20 25 PRESSURE, psi Figure 17: BP1000 Packer Inflation Curve

22 BP1002 PACKER INFLATION CURVE 4.5 4.0 OD,max OUTSIDE DIAMETER, inches 3.5 3.0 2.5 OD,min 2.0 5 10 15 20 25 PRESSURE, psi Figure 18: BP1002 Packer Inflation Curve

23 BP1004 PACKER INFLATION CURVE 5.0 OD,max 4.5 4.0 OUTSIDE DIAMETER, inches 3.5 3.0 OD,min 2.5 5 10 15 20 25 PRESSURE, psi Figure 19: BP1004 Packer Inflation Curve

24 BP1006 PACKER INFLATION CURVE 5.5 OD,max 5.0 4.5 OUTSIDE DIAMETER, inches 4.0 OD,min 3.5 3.0 5 10 15 20 25 PRESSURE, psi Figure 20: BP1006 Packer Inflation Curve

25 BP1008 PACKER INFLATION CURVE 7.0 OD,max 6.5 OUTSIDE DIAMETER, inches 6.0 5.5 5.0 OD,min 4.5 5 10 15 20 25 PRESSURE, psi Figure 21: BP1008 Packer Inflation Curve