STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015

Similar documents
TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Foothill Expressway Improvements Between El Monte and San Antonio

INNOVATIVE INTERSECTION DESIGN

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

CITY OF SPOKANE VALLEY Request for Council Action

CEE 2720 Carnegie TOD Recommendations Traffic Group 4/26/12

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

PennDOT ICE Policy An Introduction

Arterial Management Plan for US Route 250 and State Route 623

Comments EXECUTIVE SUMMARY

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Chapter 4 Traffic Analysis

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

University Avenue & Farley Avenue/University Bay Drive Area Scenario Base Conditions Multiple concerns

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Route 79/Davol Street Corridor Study

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Fairfax County Parkway Widening Fairfax County

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

REDEVELOPMENT TRAFFIC IMPACT STUDY

Defining Purpose and Need

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Project Goals and Objectives

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Joshua Jester, E.I., Florida Department of Transportation, District One

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

Clay Street Realignment Project Traffic Study

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

City of Wilsonville 5 th Street to Kinsman Road Extension Project

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Road Diets FDOT Process

APPENDIX E Evaluation of Improvement Alternatives

Blair/Williamson Intersection Expressed Needs

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

New Seward and 36 th Avenue Intersection Conceptual Design

Giles Run Connector Road

Huntington Station Metro Zone / North Kings Highway Concept Plan

EXECUTIVE SUMMARY. Page 1 of 6

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Boston Post Road Design Feasibility Study

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

Albany Shaker Road Corridor Study Public Meeting # 2

Proposed Action, Purpose and Need Technical Memorandum

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

Intersection Traffic Control Feasibility Study

LOOP 360 IMPROVEMENT STUDY

Transportation Impact Study for Abington Terrace

Superstreets. A Tool for Safely and Efficiently Managing Congestion

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

Clay Street Bridge Replacement Project

Chapter V Transportation Concept Alternatives

County of Fairfax, Virginia. Department of Transportation

RM 620 FEASIBILITY STUDY

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

3.9 - Transportation and Traffic

Route 7 Corridor Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

Capital Region Council of Governments

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Innovative Intersections

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

West Circle Drive (CSAH 22) Traffic Operations Study

Benefits and Limitations of J- Turn Intersections

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Maywood Town Hall Meeting. May 4, 2016

Bicycle and Pedestrian Connectivity Study Phase 2

Project Description Form 6V

Corridor Studies. LA 415 and LA 73

Edgemont Village Traffic and Parking Technical Report January 2014

Transcription:

STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015

Introduction How we got to here WIS 57 Bridge over WIS 100 in need of replacement Local support favors At-Grade Intersection vs Interchange Supports economic development Improves visibility and connectivity of the quadrants bordering the intersection Various alternatives evaluated Multiple PIM s, LOM s, and meetings with Village to discuss alternatives New project team reevaluated assumptions and alternatives, working within Region, CO, and with FHWA to discuss feasibility

Project Updates Scoping level ICE completed Alternative Selection ICE pending PI Improved Service Interchange Traditional At-Grade Intersection Median U-Turn Intersection

Intersection Control Evaluation (ICE) Safety Crash Analysis Access Operational Analysis Right of Way Impacts Cost

Intersection Control Evaluation (ICE) Pedestrians and Bicycles OSOW Freight Network Environmental Impacts

Intersection Control Evaluation (ICE)

Improved Service Interchange Current Alternatives

At-Grade Signalized Intersection Current Alternatives

At-Grade Signalized Intersection Current Alternatives

WIS 57 WIS 57 Current Alternatives Median U-Turn Intersection WIS 100 WIS 100

Current Alternatives Safety Interchange to At-Grade Intersection 22%-56% increase in crashes At-Grade to Median U-Turn Intersection 20%-50% reduction in crashes

Current Alternatives Operational Analysis Intersection Eastbound STH 100 HCM Delay PM Peak 2040 (s/veh) Westbound STH 100 HCM Delay PM Peak 2040 (s/veh) Northbound STH 57 HCM Delay PM Peak 2040 (s/veh) Southbound STH 57 HCM Delay PM Peak 2040 (s/veh) Existing Service Interchange 24.2 15.4 0 0 Improved Service Interchange 12.1 12.8 0 0 Conventional At-Grade Signalized Intersection 32.4 17.2 49.2 43.8 Median U-Turn Intersection 12.6 12.2 21.9 18.0 Sensitivity Analysis Intersection Percent Excess Capacity Improved Service Interchange 40% - 45% Conventional At-Grade Signalized Intersection 5% - 10% Median U-Turn Intersection 35% - 40%

Operational Analysis Improved Service Interchange 2040 LOS Through LOS A LOS B Left-Turns LOS A LOS B Through LOS A Left-Turns LOS C LOS D At-Grade Intersection 2040 LOS Through LOS A LOS C Left-Turns LOS D Through LOS D Left-Turns LOS D

Operational Analysis Median U-Turn 2040 LOS Through LOS A LOS B Left-Turns LOS C LOS D Through LOS B LOS C Left-Turns LOS C LOS D

WIS 57 Current Alternatives WIS 100 Strengths Weaknesses Improved Service Interchange At-Grade Signalized Intersection Median U-Turn Intersection Familiar condition Anticipated lowest crash frequency Lowest conflicting volumes Lower user delay Short pedestrian crossings at ramp termini Low sensitivity to growth Two signals at WIS 57 / WIS 100 Bridge visually divides the village Unsafe for pedestrians/ bicycles crossing free-flow ramps along WIS 57 Familiar Condition Greater exposure for redevelopment than Improved Service Interchange Preferable conditions for pedestrians/bicycles Local support favors at-grade Potential future access Higher Conflicting Volumes Longer pedestrian crosswalks for WIS 57 Anticipated higher crash frequency Higher overall user delay on WIS 57 Eliminates left turning movements Reduces crash frequency and severity compared to traditional at-grade intersection Improves operations compared to traditional at-grade intersection Greater exposure for redevelopment than Improved Service Interchange Preferable conditions for pedestrians/bicycles Local support favors at-grade Low sensitivity to growth Potential future access Unfamiliar Condition Greater distance traveled for left-turning movements Additional right-turn lanes required Construction Costs $10,000,000 $7,000,000 $7,000,000

Agency Outreach Federal Highway Administration City of Allisonville Indiana Utah Department of Transportation Median U-Turn

Next Steps Provide the Village with the opportunity to review new information Follow up meeting(s) with Village and stakeholders Early December Partner with Village to select alternative

Next Steps Present alternative to Village board January 18, 2016 Recommend alternative to the public February, 2016 Finalized ICE report April, 2016 PS&E May, 2019

Questions