Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Similar documents
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

CTH M Reconstruction

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Long Island Rail Road Expansion Project Floral Park to Hicksville

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Report. Typical Sections. City of Middleton, WI

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Clackamas County Comprehensive Plan

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Access Management Regulations and Standards

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

INNOVATIVE INTERSECTION DESIGN

Blair/Williamson Intersection Expressed Needs

Access Management Benefits & Techniques. Access Management Workshop June 2, 2006

STANLEY STREET December 19, 2017

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Figure 1: Vicinity Map of the Study Area

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

Fleur Drive Reconstruction

Application of a Complete Street

South Carolina Department of Transportation. Engineering Directive

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Iowa Highway 58 Corridor Improvement Study

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

Off-road Trails. Guidance

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

6.4 RECOMMENDED IMPROVEMENTS

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION


CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

SECTION 3 STREET DESIGN

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

Route 47 (North Main Street) Reconstruction

APPENDIX L: COST ESTIMATING TOOLS

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,

Giles Run Connector Road

Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Vehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.

122 Avenue: 107 Street to Fort Road

Chapter 4 Traffic Analysis

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Multimodal Through Corridors and Placemaking Corridors

RZC Appendix 8A Marymoor Subarea Street Requirements

Road Diets FDOT Process

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Lynchburg District Update

Hospital Link Project Project Update September 2017

Comments EXECUTIVE SUMMARY

FEASIBILITY STUDY MACARTHUR BOULEVARD

Station Plan: Penn & 43rd Avenue

Preliminary Engineering Study

Appendix 3 Roadway and Bike/Ped Design Standards

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

Multimodal Analysis in the 2010 Highway Capacity Manual

3.9 Recreational Trails and Natural Areas

Safety of U-turns at Unsignalized Median Openings

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Angie Silva Kitsap County Commissioners Office Stef Herzstein, PE, PTOE Transpo Group Jessica Lambert Transpo Group

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

Access requests to County streets and roadways are processed through one of the following methods:

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Innovative Intersections

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

5. RUNNINGWAY GUIDELINES

Modern Roundabouts. BY : Mark T. Johnson, P.E. An Informational Presentation Prepared For:

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Roundabouts: The Virginia Experience AASHTO SCOTE June 20, 2012

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

Complete Streets Successes, Opportunities, and Challenges

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

Board of Supervisors February 27, 2017

Malabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)

On Road Bikeways Part 1: Bicycle Lane Design

3.0 ACCESS CONTROL PLAN - HARMONY ROAD (SH68)

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Fairfax County Parkway Widening Fairfax County

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Access Management in the Vicinity of Intersections

Pedestrian & Bicycle Safety Innovations & Applications

Transcription:

Public information meeting #4 4 to 7 p.m., September 30, 2009 Hales Corners Welcome Thank you for attending this public information meeting for the WIS 100 Corridor Study. Your interest and comments are important because the Wisconsin Department of Transportation (WisDOT) is presenting the recommended preferred alternative for the WIS 100 corridor at this meeting. The meeting has an open house format. A 15-minute slide presentation providing an overview of the project need, preferred alternative and schedule will be run continuously in one corner of the room. We invite you to view the exhibits, talk with WisDOT and consultant staff, ask questions and provide your comments on the WisDOT preferred alternative. Information on display Project need displays Displays showing project need for improving safety and addressing future congestion are shown. These are the same displays shown at previous meetings. Other project needs are covered in this handout. Preferred alternative on aerial maps Two identical sets of aerial maps with the preferred alternative for the entire corridor are displayed. Access changes at median openings and driveways are shown. The potential loon truck turnaround locations on Layton Avenue are shown. Signals are the preferred intersection control on WIS 100. Intersections that will be signalized are indicated by a signal symbol. The preferred roundabout at the existing braided intersection of Janesville Road and Forest Home Avenue is shown. Potential stormwater detention pond locations are shown on the maps. The stormwater analysis is ongoing and a final decision on sites has not been made. A separate exhibit shows all the sites being considered on one map. Preferred typical roadway cross sections Exhibits showing the typical mainline cross sections for the various segments of the 5.3-mile corridor are adjacent to the aerial maps. Inside this handout Triangle Area revisions Over 2 dozen alternatives have been considered since early 2007 to address this highly congested area. Since the November 2008 public meeting, WisDOT determined that shifting the road to the west avoiding the utility parcel and the towers was needed because there is no location was available to relocate the towers and utility parcel. Two options shifting to the west were reviewed: a 6-lane and an 8-lane. The 8-lane option is the preferred alternative in the Triangle area because it provides the best operations of the conventional intersection improvements considered while avoiding the utility parcel and towers. Loomis Road (WIS 36) intersection This important, high-traffic-volume intersection had three alternatives remaining as of the last meeting: a roundabout, a jughandle intersection, and a traditional signalized intersection. The signalized Loomis Road intersection is the preferred alternative because it has fewer right-of-way impacts and it does not introduce indirection to the local roadways. It is and is shown on the aerial map. Bridges over Rawson Avenue The WIS 100 structures over Rawson Avenue are scheduled for reconstruction in 2011 because of bridge maintenance needs. Maps showing the project area are on display. Pages 2 and 3: Project needs Page 5: Triangle area revision Page 4: Preferred alternative roadway description Page 6: Tentative construction schedule and estimated construction costs, project contacts, request for comments

Public information meeting September 30, 2009 Project needs overview There are three main needs to be addressed by the WIS 100 corridor study: safety, bicycle/pedestrian accommodations and motor vehicle capacity. Crash rates are high along the corridor. Corridor crash rates are 1.6 to 2 times higher than the statewide average (except between Drexel and Rawson which is lower than average). Injury crash rates are 1.5 to 2 times the statewide average. The intersections at Edgerton, Janesville, Layton, St. Martins and Grange Avenue had the highest intersection crash rates in the period studied, between 2001 and 2005. Accommodations for pedestrians and bikes. Sidewalks are discontinuous and there are no existing accommodations for bicyclists. Local communities want this addressed as part of this study. Projected traffic volumes exceed capacity. Traffic Volumes 2005-2033 50-75% Growth 75-100% Growth 100-125% Growth >125% Growth Traffic is expected to grow by 50 percent to 150 percent by 2033 along most of the WIS 100 corridor. Overall traffic volume ranges are shown in vehicles per day (vpd). Franklin area: 8,700 to 23,400 vpd existing 27,500 to 49,900 vpd future (2033) Hales Corners: 28,200 to 44,800 vpd existing 52,200 to 67,700 vpd future (2033) Greenfield (at W. Layton Avenue): 31,000 vpd existing 46,500 vpd future (2033) The highest traffic growth is in the southern section of the corridor and the highest future volumes will be in the northern section. Traffic congestion will increase and operations at intersections will worsen by 2033. Page 2

Public information meeting September 30, 2009 Project needs overview, continued Level of congestion (known as Level of Service or LOS) is designated from A to F. LOS A represents excellent travel conditions while LOS F represents failing operations with unacceptable delays. By 2033, if no improvements are made, the side streets at nearly all unsignalized intersections will fail during peak commuting hours. Some signalized intersections will operate at LOS E or F overall and many individual signalized movements will fail. LOS D is the goal the study will try to achieve. The schematic on the left shows existing conditions during the afternoon peak commuting hours and the level of service at key intersections. The schematic on the right shows the level of service in the future (design year 2033) if no improvements are made to the corridor. Page 3

Public information meeting September 30, 2009 Preferred Typical Roadway Cross Section 1 2 3 Existing posted speed is 45 mph to 50 mph Four-lane urban roadway with 12-foot lanes Curb and gutter, grassed median, storm sewer Inside and outside paved shoulder offsets required because of higher speed facility On-street bike accommodation West side: 5-ft sidewalk and 8-ft grassed terrace East side: 10-ft shared use path and 8-ft grassed terrace One relocation is required. Other parcels will require strip right-of-way and/or temporary easements Existing posted speed is 50 mph Six-lane urban roadway with 12-foot lanes Other road items same as in Puetz to Drexel section Shared use path connects to 5-ft sidewalk at Phyllis Lane Most parcels will require temporary easements, some parcels will require strip right-of-way Existing posted speed is 40 mph Six-lane urban roadway with 12-foot lanes Curb and gutter, grassed median, storm sewer No extra paved shoulder offsets required because of lower speed On-street bike accommodation provided 5-ft sidewalk and 7-ft grassed terrace both sides Most parcels will require temporary easements, some parcels will require strip right-of-way 4 5 Existing posted speed is 35 mph Change made since last Public Meeting: - An 8-lane roadway is the preferred alternative to provide needed capacity through the Triangle area. Includes three 11- ft and one 12-ft lane in each direction. Curb and gutter, minimum width median, storm sewer On-street bike accommodation provided Sidewalk (5-ft wide) and 5-ft grassed terrace 7 relocations required. Other parcels will require strip right-of-way and/or temporary easements Existing posted speed is 35 mph Six-lane urban roadway, two 11-ft and one 12-ft lane in each direction Curb and gutter, minimum width median, storm sewer On-street bike accommodation provided Sidewalk (5-ft wide) and 5-ft grassed terrace There is potential that Village of Hales Corners would replace the east sidewalk with a 10-ft wide bike/ped path adjacent to the ATC towers. Coordination with We Energies and ATC is ongoing. A shared use path would not eliminate the need for on-street bike accommodations. Most parcels will require temporary easements, some parcels will require strip right-of-way Page 4

Page 5 Public information meeting September 30, 2009 Triangle Alternative Change Since Last Public Meeting Since the November 2008 public meeting, WisDOT determined that shifting the road to the west avoiding the utility parcel and the towers was needed because there is no location available to relocate the towers and utility parcel. Shifting the roadway to the west with 6-lane and 8-lane options was reviewed. The 8-lane option has one more relocation than the 6-lane option and provides the best operations for a conventional solution. (an urban interchange provided the best operations out of the two dozen alternatives considered but impacts would be extreme. The 8-lane option shifted to the west is WisDOT s preferred alternative for the Triangle area. 6-lane shifted west impacts: 1 Residential relocation (X) 5 Commercial relocations (X) 10 parcels w/strip right-of-way (RWR or RWC) 8-lane shifted west impacts: 2 Residential relocation (X) 5 Commercial relocations (X) 14 parcels w/strip right-of-way (RWR or RWC)

Schedules Public information meeting September 30, 2009 WIS 100 corridor study Public information meeting #4 September 30, 2009 Complete Environmental Document Fall 2009 Opportunity for Public Hearing Winter 2009 60% plans complete Summer 2010 Right-of-way Plat Summer 2010 Tentative construction schedule and estimated construction costs as available 2011 Reconstruct bridges over Rawson Avenue (estimated $5.2 million) 2014 Reconstruction/expansion Loomis Avenue to College Avenue (estimated $25.5 million) 2015 Reconstruction/expansion 60th Street to Loomis Avenue (from an earlier corridor study) 2016 Reconstruction College Avenue to Layton Avenue estimated ($19.5 million) Please share your comments We appreciate your continuing feedback on the project. Please use one of the comment forms to provide your written comments and drop them off in the comment box or mail them in. Project Contacts Vida Shaffer, P.E. Joan Petersen, P.E. WisDOT SE Region Strand Associates, Inc. 141 NW Barstow Street 633 West Wisconsin Avenue Waukesha, WI 53187 Milwaukee, WI 53203 Phone: (262) 548-6766 Phone: (414) 271-0771 E-mail: vida.shaffer@dot.wi.gov E-mail: joan.petersen@strand.com Thank you for attending this Public Information Meeting. www.dot.wisconsin.gov/projects/wis45100study/index.htm. Page 6