Iowa Highway 58 Corridor Improvement Study

Similar documents
IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

APPENDIX E Evaluation of Improvement Alternatives

Appendix D: Concept Screening

INNOVATIVE INTERSECTION DESIGN

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

Terwillegar Drive Expressway Draft Concept Plan

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

List of Display Boards

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

Washington St. Corridor Study

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Frequently Asked Questions

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

1. Provide a dedicated westbound approach bus lane at the intersection;

West Circle Drive (CSAH 22) Traffic Operations Study

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

City of Fairfax, Virginia City Council Work Session

Welcome! San Jose Avenue Open House August 25, 2015

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

TRAFFIC IMPACT ANALYSIS

FM #: ETDM #: 11241

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Intersection Traffic Control Feasibility Study

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

Golden s Plan. For the Highway 6 & 93 Corridor

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Freeway System Considerations

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

You are invited to an... OPEN HOUSE. Recommended Approach for the Franklin Avenue / East River Parkway Intersection

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

EXISTING (2006) CONDITIONS

Maywood Town Hall Meeting. May 4, 2016

Final Project Prioritization Plan

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Access Management Regulations and Standards

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

Section Access Control Plan - SH 14 (Mulberry Street)

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

A-1 Arcadia with Signal

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Project Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Comments EXECUTIVE SUMMARY

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

STANLEY STREET December 19, 2017

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Mandan Commission Meeting August 2, 2016 Mandan City Hall

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

Bay to Bay Boulevard Complete Streets Project

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Welcome to the Sellwood Bridge Project Open House!

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Giles Run Connector Road

Route 79/Davol Street Corridor Study

5. RUNNINGWAY GUIDELINES

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

CSAH 101 Preliminary Design

INTERSTATE 540 IMPROVEMENT STUDY

Dell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization

This page intentionally left blank.

TRANSPORTATION IMPROVEMENT PLAN

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM. DATE June 2, 2011

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

Transcription:

1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014

2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer

3 Outline of Presentation Review of Project Purpose and Need Recap of Previous Public Meeting Description of Alternatives Project development process and schedule

4 IA 58 Project Corridor

5 Purpose and Need of Project Increase safety for vehicles, pedestrians and bicyclists Improve the flow of traffic Provide capacity to accommodate future traffic growth

6 Traffic Volumes on IA 58

7 Traffic Growth on IA 58 IA 58 Traffic, North of Viking Road 30000 25000 20000 15000 Daily Traffic Volume 10000 5000 0 2001 2005 2009 2013

8 Traffic Growth on Viking Road Viking Road Traffic, East of IA 58 25000 20000 15000 10000 Daily Traffic Volume 5000 0 2001 2005 2009 2013

9 Future Traffic Projected for IA 58 50000 45000 40000 35000 30000 25000 20000 15000 10000 5000 0 IA 58 Traffic, North of Viking Road Approx. maximum capacity of existing road 2001 2005 2009 2013 2040 Daily Traffic Volume

10 Traffic Safety

11 Traffic Crashes on IA 58 (2008-2012) Between Ridgeway Ave and Greenhill Rd 168 crashes reported 35 injuries 2 fatalities (both at Viking Road) (several additional fatalities occurred in prior years) Viking Road intersection is ranked No. 13 in statewide list of Intersection Safety Improvement candidates Viking Road intersection is ranked No. 4 in statewide list of Intersection Safety Improvement candidates

12 Summary of Crashes at Viking Road / IA 58 77 total crashes 2 fatalities 12 injuries 23 other possible injuries 33 left-turn violations 22 rear-end collisions 7 broadside collisions 15 other types

13 Recap of Previous Public Information Meeting

14 Meeting Held October 15, 2013 Around 50 people in attendance 19 Alternatives Shown 2 alternatives at Greenhill Road 4 alternatives at Viking Road 4 alternatives at Performance Drive 9 alternatives at U.S. 20/Ridgeway

15 Meeting Held October 15, 2013 Comments Received Many commented on need to keep Ridgeway Avenue connected to Iowa 58 Many commented on problems at Nordic Drive/ Viking Road intersection Many commented on problems at Nordic Drive/ Ridgeway Avenue intersection Several indicated support for proceeding with project as soon as possible, due to increasing safety and traffic problems Some expressed concern about limited access

16 Meeting Held October 15, 2013 Since October 15. Continued evaluation of alternatives Engineering Factors Environmental Factors Public Comments Reduced Alternatives to Two at Each Location Options without Ridgeway connection removed Options with traffic operations problems removed

17 Greenhill Road Alternatives

Greenhill Road Loop Ramp Alternative

Greenhill Road Interchange Loop Ramp Alternative Typical Interchange Layout Similar to Highway 20 at Hudson Road No Impact to Detention Basin in Southwest Corner Two Signalized Ramp Intersections Graphic Shows Iowa 58 Over Greenhill Final decision on over/under orientation has not been made Iowa 58 over Greenhill does not impact recreational trail tunnel Additional Lane Construction Required on Greenhill Road Right turn lanes for on-ramps Longer left turn lane for on-ramps No Buildings Impacted Right-of-Way needed from some property owners

Greenhill Road Single Point Alternative

21 Greenhill Road Single Point Interchange Operation

22 Greenhill Road Single Point Interchange Operation Phase 1 Left Turns From Ramps

23 Greenhill Road Single Point Interchange Operation Phase 2 Left Turn From Mainline

24 Greenhill Road Single Point Interchange Operation Phase 3 Greenhill Thru Traffic

Greenhill Road Interchange Single Point Interchange Alternative Modern Interchange Layout Many in Rochester, MN area One in Des Moines (at I-35/Mills Civic Parkway) Minimizes impact to adjacent properties Minimizes Construction on Greenhill Road Only need to add right-turn acceleration lane for northbound right turns One Signalized Ramp Intersection Graphic Shows Iowa 58 Over Greenhill Final decision on over/under orientation has not been made Iowa 58 over Greenhill does not impact recreational trail tunnel No Buildings Impacted Minor impacts to detention basin Right-of-Way needed from some property owners

26 Viking Road Alternatives

Viking Road Tight Diamond Alternative

Viking Road Interchange Tight Diamond Alternative Typical Interchange Layout Similar to University Avenue at Iowa 58 Mainline Lanes Shifted 15 East Double Left Turn Lanes Onto Highway Ramps Signalized Ramp Intersections Graphic Shows Iowa 58 Over Viking Final decision on over/under orientation has not been made Additional Improvements at Nordic Drive and Andrea Drive Signals and turn lanes at Nordic Drive Additional turn lanes at Andrea Drive No Buildings Impacted Right-of-Way needed from some property owners

Viking Road Single Point Alternative

Viking Road Interchange Single Point Interchange Alternative Modern Interchange Layout Many in Rochester, MN area One in Des Moines (at I-35/Mills Civic Parkway) Minimizes impact to adjacent properties Reduces Construction on Viking Road Mainline Lanes Shifted 15 East One Signalized Ramp Intersection Graphic Shows Iowa 58 Over Viking Final decision on over/under orientation has not been made Additional Improvements at Nordic Drive and Andrea Drive Signals and turn lanes at Nordic Drive Additional turn lanes at Andrea Drive No Buildings Impacted Right-of-Way needed from some property owners

31 U.S. 20/Ridgeway Avenue Alternatives

U.S. 20/Ridgeway 32 System Interchange Alternative

U.S. 20 Interchange System Interchange Alternative Direct Connection of Movements Between Highway 58 and 20 Requires significant bridge construction Requires significant earthwork fill Maintains Connections to Ridgeway Avenue and Butterfield Road Access to John Deere, KwikStar, Camping World essentially the same Alignments Shifted to Minimize Impact to Current Developments Impact to cell-phone tower to be reviewed Right-of-Way needed from some property owners Minimal Construction on Ridgeway Avenue Reconstruction of some turn lanes Minimal Construction on Butterfield Road Three ramp intersections reused

U.S. 20/Ridgeway Existing Layout Modifications Alternative

U.S. 20/Ridgeway Existing Layout Modifications Alternative

U.S. 20 Interchange Existing Layout Modifications Alternative Add Southbound Right Turn Lane to Ridgeway Avenue Intersection Add Double-Left Turn Lanes to Iowa 58 at Ridgeway Avenue Existing box culverts will be extended or replaced Add Double-Left Turn Lane Southbound Iowa 58 to Eastbound U.S. 20 Requires Two-Lane Ramp to Eastbound U.S. 20 Intersection would be signalized No Buildings Impacted Right-of-Way needed from some property owners City of Cedar Falls welcome sign will need relocation Intersection Operation Improved With Construction, But Will Not Handle Projected Future Traffic Volumes Will experience delays and long queues

37 Example of Diverging Diamond Interchange

38 Recreational Trails

Recreational Trails South of Viking Road Recreational Trail Graphic

Recreational Trails North of Viking Road Recreational Trail Graphic

Recreational Trail Information Proposed and Planned Trails Will Relocate Trail Away From Viking Road Interchange Still allows access to industrial park and commercial area Two Routes to Connect Between U.S. 20 and Mayors Bridge West connection along Chancellor Drive to Prairie Lakes Trails East connection behind Target and Walmart Pedestrian Crossing of Ramp Intersections at Viking Road Trail Crossing of Ramp Intersections at Greenhill Road

42 What s Next?

43 Project Development Process Project development steps Environmental Assessment Determine Preferred Alternative Design Right-of-Way Acquisition Construction Project will be built in several stages Viking Road area is first priority First construction project may start in 2017 Schedule depends on funding and approvals

44 Tentative Project Schedule Collect Data Develop and Analyze Alternatives Public Informational Meeting #1 Final Evaluation of Alternatives Public Informational Meeting #2 Prepare Environmental Assessment Public Hearing Environmental Clearance Final Design, Right-of-Way Acquisition and Construction* 2013 2014 Future Current Status * NOTE: Schedules for design, right-of-way acquisition and construction depend on funding availability and approvals

45 Comments and Feedback Please provide all written comments by May 20, 2014