Levante. Ultravap. Automation-ready blow down evaporators from Porvair Sciences

Similar documents
Ultravap Mistral. Fully automation-compatible blow down evaporators from Porvair Sciences

Flow Switch LABO-VHZ-S

Instruction Manual. Rugged PCB type. 1 Terminal Block. 2 Function. 3 Series Operation and Parallel Operation. 4 Assembling and Installation Method

Using Rates of Change to Create a Graphical Model. LEARN ABOUT the Math. Create a speed versus time graph for Steve s walk to work.

Automatic air-main charging and pressure control system for compressed air supplies

MCW100A, B Time Proportional Rotary Position Controller

LSU RISK ASSESSMENT FORM Please read How to Complete a Risk Assessment before completion

67.301/1. RLP 10: Pneumatic volume-flow controller. Sauter Components

XSz 8... XSz 50 Solenoid actuated fail-safe safety valve

3 (R) 1 (P) N/en

Type 14 Flanged Diaphragm

MVS. Electronic fan speed controller for DIN rail. Key features. Article codes Technical specifications. Area of use

KINEMATICS IN ONE DIMENSION

Type Control action Setpoint range Air Weight Volume flow % capacity I n /h kg. Pressure diff. 1) Pa

LEWA intellidrive. The mechatronic All-in-One pump system. intelligent flexible dynamic high precision. Foto: ratiopharm

Zelio Control Measurement Relays RM4L Liquid Level Relays

PRESSURE SENSOR TECHNICAL GUIDE INTRODUCTION FEATURES OF ELECTRIC PRESSURE SENSOR. Photoelectric. Sensor. Proximity Sensor. Inductive. Sensor.

Avoiding Component Failure in Industrial Refrigeration Systems

Simulation of Scattering Acoustic Field in Rod and Identify of. Ultrasonic Flaw Detecting Signal

29 B ROUTE Bus Times Summer NOTES a = Time at Vicarage Way. * = On Schooldays bus operates up to 5 minutes later.

2020 ClearTrace In-line Turbidity System

User manual. EVD evolution. electronic expansion valve driver. Integrated Control Solutions & Energy Savings READ CAREFULLY IN THE TEXT!

Morningstar Investor Return

Time & Distance SAKSHI If an object travels the same distance (D) with two different speeds S 1 taking different times t 1

Filter Regulator with Back Flow Mechanism AW20K/30K/40K. How to Order. Symbol. Note 4) J N R W Z. Note 5) Note 6) Accessories Note 3) Symbol.

Chapter : Linear Motion 1

Interpreting Sinusoidal Functions

TRACK PROCEDURES 2016 RACE DAY

2. JOMON WARE ROPE STYLES

INSTALLATION AND OPERATION MANUAL

BRAVO 100 BRAVO 101 BRAVO 110

Clemco Industries Corp. ISO 9001 Certified

CALCULATORS: Casio: ClassPad 300 ClassPad 300 Plus ClassPad Manager TI: TI-89, TI-89 Titanium Voyage 200. The Casio ClassPad 300

INSTALLATION AND OPERATION MANUAL

Bill Turnblad, Community Development Director City of Stillwater Leif Garnass, PE, PTOE, Senior Associate Joe DeVore, Traffic Engineer

Capacity Utilization Metrics Revisited: Delay Weighting vs Demand Weighting. Mark Hansen Chieh-Yu Hsiao University of California, Berkeley 01/29/04

INSTRUCTIONS FOR USE. This file can only be used to produce a handout master:

3. The amount to which $1,000 will grow in 5 years at a 6 percent annual interest rate compounded annually is

INSTALLATION AND OPERATION MANUAL

Strategic Decision Making in Portfolio Management with Goal Programming Model

Patent NO: 8,430,895. Revision (3) OPERATION INSTRUCTIONS. Fully Automatic AirGun by Air-Ordnance. HPA (High Pressure Compressed Air)

What the Puck? an exploration of Two-Dimensional collisions

INSTALLATION AND OPERATION MANUAL

Stroke Types. The stick tip starts high and ends high. "A loud note that prepares for another loud note".

Owner s Manual SSCI. Wheeling, IL (800) Form No /08

Installation & Technical Handbook for Marsh Industries Products

SWIMMING POOL HEAT PUMP UNITS. Installation & Instruction Manual DURA - series

An Alternative Mathematical Model for Oxygen Transfer Evaluation in Clean Water

INSTALLATION AND OPERATION MANUAL

Ministry of Agriculture and Rural Development Animal and Plant Health Regulatory Directorate

2017 MCM/ICM Merging Area Designing Model for A Highway Toll Plaza Summary Sheet

ANALYSIS OF RELIABILITY, MAINTENANCE AND RISK BASED INSPECTION OF PRESSURE SAFETY VALVES

INSTALLATION AND OPERATION MANUAL

Name Class Date. Step 2: Rearrange the acceleration equation to solve for final speed. a v final v initial v. final v initial v.

DIMENSIONS AC Road travel

1 A B C D E F G H I J K L M N O P Q R S { U V W X Y Z 1 A B C D E F G H I J K L M N O P Q R S { U V W X Y Z

RECOMMENDATION FOR INTERCHANGEABLE STUD BOLTS AND TAP END STUDS FOR API SPEC 6A FLANGES

CHARACTERIZATION AND MODELING OF A PROPORTIONAL VALVE FOR CONTROL SYNTHESIS

P/Q. Alternate control. Real-time Fieldbus Reference. Enhanced Diagnostic E-SW-PS/S E-SW-PS/S. E-SW-*/S programming software. Set code (see note)

Monte Carlo simulation modelling of aircraft dispatch with known faults

A BETTER WAY THRU ROCKAWAY

Nozzle valve system for the variable atomization of very small liquid volumes

A NEW 296 ACRE DISTRIBUTION PARK

INSTALLATION AND OPERATION MANUAL

HKS Colour System Colour system consisting of 3 series for optimum colour fidelity and colour identity

CMA DiRECtions for ADMinistRAtion GRADE 6. California Modified Assessment. test Examiner and Proctor Responsibilities

Nozzle valve system for the variable atomization of very small liquid volumes

AP Physics 1 Per. Unit 2 Homework. s av

Control elements. Fine adjustment. Function selector. Status indication. 24 V DC typ. 0,25 W / 0,25 VA. 24 V DC typ. 0,03 W / 0,09 VA. min.

WELCOME! PURPOSE OF WORKSHOP

Preparing your files for digital press, offset printing, and promotional product items. Submission Checklist. Before Creating Your Project

As time goes by - Using time series based decision tree induction to analyze the behaviour of opponent players

Simulation Validation Methods

INSTALLATION AND OPERATION MANUAL

Oath. The. Life-changing Impact TEACH HEAL DISCOVER. Going Into the Wild to Save Rhinos. Tracking Down Outbreaks page 2. Teaming Up for Nekot page 7

CHAPTER TEST REVIEW, LESSONS 4-1 TO 4-5

104 october 2011 CYCLING PLUS

Dannmar EQUIPMENT SX-6/XL USER MANUAL. Dannmar Equipment 646 Flinn Avenue, Suite A Moorpark, CA Tel:

INSTALLATION AND OPERATION MANUAL

POWER DANGER NOW COMMERCIAL. Controls Ba Erodes Slowly to Deliver Lo ACTIVE INGREDIENT: OTHER INGREDIENTS:...32% with Anti-Scale Additive

The Great Recession in the U.K. Labour Market: A Transatlantic View

Proportional Reasoning

The Home of Control & Automation in Ireland. Monsoon

EXAMINING THE FEASIBILITY OF PAIRED CLOSELY-SPACED PARALLEL APPROACHES

QUICKJACK WARNING INSTALLATION AND OPERATION MANUAL MODELS: BL-3500 BL ,500 / 5,000 POUND CAPACITY QUICKJACK

INSTALLATION AND OPERATION MANUAL

2017 Komen NENY Race for the Cure

"Pecos Bill Rides a Tornado" Stages Written by: Striker

Southern Equestrian Challenge BIET IEA Horse Show Zone 4 Region 10 Host: BIET Co-Host: Chelsea Equestrian

Gas services renewal programme

500 SERIES ADVANTAGES

WORLD GROWTH AND INTERNATIONAL CAPITAL FLOWS IN THE XXI st CENTURY

SBP200 SBP202 SBP202. See modifications table for upgrades, specifications and standards.

Section 3: Investigating animals: hunters and the hunted

HafcoVac Compressed Air Industrial Vacuum Product Line

3.00 m. 8. At La Ronde, the free-fall ride called the Orbit" causes a 60.0 kg person to accelerate at a rate of 9.81 m/s 2 down.

Explore Graphs of Linear Relations. 1. a) Use a method of your choice to determine how much water will be needed each day of a seven-day cruise.

A Study on the Powering Performance of Multi-Axes Propulsion Ships with Wing Pods

Segment Ball Valves Eccentric ball valves

The Measuring System for Estimation of Power of Wind Flow Generated by Train Movement and Its Experimental Testing

Transcription:

A U T O M A T I O N - R E A D Y B L O W D O W N E V A P O R A T O R S

Uravap Levane Auomaion-ready bow down evaporaors from Porvair Sciences Robo-compaibe dry down saion for LCMS appicaions Inuiive graphica coour ouch screen dispay Up o five sored evaporaion programmes Up o hree programmabe seps per mehod On board gas managemen Remoe conro from PC opion RS232 connecion wih fu remoe conro command se Reversibe screen for inegraion a side of robo Bui-in fume managemen and opiona duc connecor Faser evaporaion imes Choice of 24-, 48-, 96- and 384-we heads Sma fooprin o fi in your hood Eco mode exends he ife of he heaer and fan, if fied. The Uravap Levane is he aes in Porvair Sciences popuar series of nirogen bow-down sampe concenraors and evaporaors. Using echnoogy from our very successfu Uravap Levane series of roboready, inegraion compaibe evaporaors we have redesigned he cassic singe pae evaporaor o mee he needs of he modern aboraory. Now you ge fu-coour ouch screen graphic dispays, an inegraed auo-ranging power suppy and opiona fume vening wih pug-in fan modue. Combined wih rea-ime run dispays showing acua gas emperaure, gas fow rae and sage heigh, he Uravap Levane pus you more in conro of he evaporaion process. Offering mui-sep ramped programming wih fu aphanumeric program naming, he Levane is our saeof-he-ar sandaone evaporaor. auminium bie sides, see cover paes powder-coaed for soven resisance and wide arge rubber fee for bench op mouning. The Levane has a bui-in fume duc and an opiona fan uni is avaiabe o speed soven vapour remova away from he pae, hus increasing he evaporaion rae furher. New auo-ranging 110/220V power suppies eiminae he need for a ransformer and provide sufficien power o drive he heaers and moor wihou drawing an excessive oad, hereby exending he ife of your insrumen. The precision engineered mechanism uses a sandard ANSI/SLAS pae nes o accep mos micropae formas and ube racks. I can accommodae ubes up o 80mm in heigh in a variey of configuraions o aow he use of 2 Dram vias, 1.5m HPLC vias, bar-coded ubes in racks and many oher common formas. Evaporaor heads are made o mach hese formas in 24-, 48-, 96- and 384-we configuraions. Our unique 96-we spira neede head, which creaes a vorex in cerain paes o speed up evaporaion, can aso be used on he Uravap Misra. Designed o give you ong ife in he aboraory, Uravap Series evaporaors are robusy bui wih soid A parameers can be programmed hrough he arge coour ouch screen dispay, using he syus provided. ACTUAL LENGTH OF THE ULTRAVAP A LEVANTE 0 1 2 3 4 5 6 7 8 9 10 1

Fexibe programming In comparison wih previous modes, he Uravap Levane has a smaer fooprin, aowing beer access and saving vauabe bench space. The evaporaion abe is abe o rise under he conro of a sepper moor as he drying process proceeds. Precision Swiss-made sepper moors are used in a Uravaps o precisey conro he upward movemen of he sage in 0.1cm incremens, ensuring ha wih carefu programming, he evaporaor head remains jus above he surface of he iquid o be removed for opimum efficiency. An on-board digia fow conroer aows accurae programming of rea gas fow raes for he firs ime, ensuring reproducibe resus every ime. Up o five mehods wih fu aphanumeric names may be sored, edied and recaed. Mehods may be sen via RS232 o/from an exerna compuer. Each programme aows he abe o rise in up o hree disinc ramped phases, so ha a fas iniia drying period can be foowed by a gener fina drying phase. In remoe conro mode, conro commands are sen direcy from he robo conroer o he Levane. These sandard commands are ised in he manua, bu mos robo manufacurers have drivers avaiabe o conro he Levane, making inegraion a seamess process. Each mehod consiss of hree secors, aowing conro of ime, gas emperaure, gas fow rae and sage heigh for each secor. 196 435 168 (DIMENSIONS IN MILLIMETRES) 455 1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 3 A C T U A L W I D T H O F T H E U L T R A V A P L E V A N T E

Fexibiiy in operaion Any Uravap Levane can be operaed direcy over he bui-in RS232 ink, so ha programming can be carried ou remoey and sar/sop commands sen from a nework. Saion I.D. numbers can be se and sored for each uni. Unis can easiy be aken ou of remoe conro mode for mainenance or where a randomaccess programme is required. The Uravap Levane comes wih an RS232 connecion and a remoe command se. Whis no sporing he smar pae shue of he premium Uravap Misra, i is si possibe o connec o and operae from a robo iquid handing saion using he Uravap Levane. This shoud appea o he budge-conscious aboraory who may wish o auomae he dry-down boeneck in he fuure. The informaive run-ime dispay shows he progress of each evaporaion run wih rea-ime informaion on gas emperaure, gas fow rae, sage posiion and remaining run-ime, wih an easy o read cursor dispay. Smar safey Mehod securiy Auhoriy o change or edi sored mehods is conroed by a password-proeced adminisraive user eve in he Levane sofware, ensuring ha unauhorised users canno amper wih sored proocos. Oher users may ony reca and run sored mehods approved by he adminisraor. The Uravap Levane has been designed o proec you from harm, o proec your robo, if conneced, and o ook afer your sampes. The moving pae sage has four sensiive microswiches o deec obsaces or obsrucions. Triggering his safey sysem auomaicay sops he Levane and promps he user o cear he obsrucion before re-seing he sage. In addiion o he safey roe, his sysem aso provides posiive pae deecion for any robo conneced and is abe o confirm correc pacemen of a pae. Adminisraive and user eves can be se and proeced by PIN code o preven unauhorised mehod ediing. Audibe and visua warning of any obsrucion is ceary shown and mus be ceared by he user or he remoe operaing sysem for maximum safey. ACTUAL LENGTH OF THE 2 33 34 35 36 37 38 39 40 41 42 43 ULTRAVAP A LEVANTE

Removabe/reversibe screen Coour ouch screen programming Opiona proecive ani-spash membrane Opiona 4 fume exracor duc wih buiin fan Warm nirogen gas injeced direcy ino each we of he micropae for opima drying Choice of inerchangeabe neede heads. Spira or sraigh 96; 384, 48 and 24 sraigh Tough, cear spash and safey guard Acceps paes or vias up o 60mm heigh overa SLAS sandard pae nes Bui-in digia fow meer and fu gas conro Precision sepper moor raises pae sage owards needes during run o speed evaporaion Rubber fee reduce vibraion. Secure mouning poins for inegraion o roboic ce Quick reease spashguard for head change and ceaning RS232 conro by exerna PC or LH robo sysem Gas ine for N2 or dry air on 8mm I.D. quickconnec Auo-ranging power suppy operaes on 110V or 220V, 50/60Hz

Soven compaibiiy The Uravap Levane is suppied wih an evaporaor head of your choice, which may be inerchanged quicky and easiy wih a head of a differen paern as your workfow demands. Wih a choice of 96 sraigh or 96 spira needes, pus 24, 48 and 384 sraigh needes, he sphere of appicaion for Uravap Levane is huge. Mos common chromaography sovens can be evaporaed wih ease, incuding dichoromehane, mehano, aceonirie and hexane. The nirogen bow-down mehod is no, however, suiabe for high-boiing poin sovens such as DMF, DMSO and waer. I is no recommended for use wih acids or acid chorides, as specia corrosion-resisan sysems are needed for his work. The choice of sraigh or spira needes aows he user o choose beween faser dry down (spira) and beer fina drying in V-we paes (sraigh). The spiras cause a vorex o form in he soven, increasing he surface area and hus speeding up he rae of evaporaion. Spira needes are ony suiabe for use wih square-we paes and arger vias. Evaporaor sysem requiremens The new Uravap Levane is designed o run from 110V or 220V a 50/60Hz using an auo-ranging power suppy. A bui-in digia gas fow meer conros he fow rae and swiches off he heaers if he gas suppy drops beow 30L per minue for maximum safey. Beween 30 and 5L per minue, he Levane may be operaed wihou heaing using gas a inpu emperaure ony. Simiary, if he pressure exceeds 7 bar, safey vaves wi shu down he sysem o preven damage. Opima gas suppy is 70L per minue a 6 bar. Ordering informaion Ca. No. Descripion Qy/Pack 500224 Uravap Levane fuy robo compaibe Bowdown Evaporaor wih 96 spira needes, 110/230V 1 500225 Uravap Levane fuy robo compaibe Bowdown Evaporaor wih 96 sraigh needes, 110/230V 1 500226 Uravap Levane fuy robo compaibe Bowdown Evaporaor wihou neede head, 110/230V 1 229072 Repacemen 96 Neede Head wih spira needes for a Porvair evaporaors 1 229036 Repacemen 96 Neede Head wih sraigh needes for a Porvair evaporaors 1 229073 Repacemen 384 Neede Head wih sraigh for Uravap RC. Misra & Levane ony 1 229409 Repacemen 24 Neede Head wih sraigh for a Porvair evaporaors 1 229410 Dedicaed 48 Neede Head sraigh for use wih HPLC via adapor for a Porvair evaporaors 1 F U L L Y A U T O M A T I O N - C O M P A T I B L E B L O W D O W N E V A P O R A T O R S Simpify he connecion of your evaporaor o your aboraory robos wih Uravap Misra. Reques a brochure or visi our websie - www.micropaes.com P/N 420010 Porvair Sciences Limied 2015. Produced by Cream Ink Limied www.creamink.com Prined in he UK. A rademarks acknowedged. Saes and Cusomer Services Porvair Sciences Ld Cywedog Road Souh Wrexham Indusria Esae Wrexham Norh Waes UK LL13 9XS Te: +44 (0) 1978 666222 Fax: +44 (0) 1978 660007 emai: in.saes@porvair-sciences.com www.micropaes.com Accouns Porvair pc 7 Regis Pace Bergen Way Kings Lynn Norfok UK PE30 2JW Te: 44 (0)1553 765500 Fax: +44 (0)1553 765599