Black Brant Vb. Please read and understand all instructions before building!

Similar documents
RESQ TRAINING INTERNATIONAL. Rev 0 - July 2012 USER INSTRUCTIONS. User Instructions for TED Training Emergency Dummy by RESQ-Gear.

APCF1 Model Tripod.

How to Install a Toilet By See Jane DrillTM Copyright 2013, All Rights Reserved

Large Diameter TECTITE Installation and Specifications Manual

Cantilever Beam Bending of Soft Tissue

Compressions: Push hard and fast on the center of. Airway: Tilt the victim s head back and lift the chin to. Breathing: Give rescue breaths

Let s explore and find what works!

WHITE WOLF. X-ray View MID POWER MODEL ROCKET KIT BUILDING INSTRUCTIONS KIT SPECIFICATIONS:

USEFUL POINTS TO REMEMBER

The. Guidelines: Printing. Instructions: Model Parts: print on both. every-day printer. prefer to print on. (each have their own preferences).

How to set your saddle height in under 23 minutes without the guesswork

Installation Manual for VersaScreen Pro and VersaScreen IceBlaster Gutter Protection Products. Table of Contents

STEP 1 A. Lay the two Motor Mount Tubes on a flat surface with ends even and Glue them together with White Glue. Allow Glue to set before moving on.

PARK BOYS BASKETBALL--Skill Improvement Drills

INDOOR FLAG FOOTBALL RULES. Play clock is 25 second from the time the official whistles ready for play. Warning will be given at ten second left only.

Stickin Together: Surface Tension, Cohension, and Adhesion

Aliphatic Resin Wood Glue. 18" Fabric Parachute Part #PNC50 Part # Part #11700 Part #J0016. Launch Lug

Fundamentals of Successful Pole Vaulting Anthony Bertoli University of Northern Iowa

Complex Care Hub Manual: High Flow Nasal Prong (HFNP) Oxygen Therapy

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

Coach's Manual. North Shore Girls Softball League 2007

Prospect Park Baseball Association PEE WEE DIVISION RULES Revised January, 2011

Badminton. Introduction. Origin

WORKSTATIONS mysite User Guide. mysite Workstation System User Guide

patient education program 4156 South 52 nd Street, Omaha, NE ChildrensOmaha.org/HomeHealthcare

TYPE 1 BEARINGS. The spherical knuckle allows the bearing to self-align while the rudderstock rotates within the bearing.

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Crusader Senior Girls Summer Workout Program:

Content. Support Pack. Support Pack

Little Dog Dual Deploy

KYA Baseball Playing Rules Updated 5/8/2017

A AAA A A. BreakAway Speed Sports Training. Soccer Coaching Clinic. 2l Warm Up: 1) General Practice Tips:

TDM on the Web. How To Use TDM On The Web. Below is information and instructions for using the scheduling modules in TDM

Better Bicycling Fact Sheet

Gema s OptiColor System

CPE GAMES CLASSES COLORS. Object: Successfully run your choice of one of the two over-lapping mini-agility courses on the same field

Nordson AP-300/600 Plasma Systems Operational Manual July 2017

Down and Out Mount Assembly & Installation Directions

YMCA OF GREATER LOUISVILLE AGE 3 YOUTH SOCCER, RULES Updated August 2016

BURNINGTREE STUMPS WITH

Athletics Rules. New Hampshire

Guide to Routine Construction for NAIGC Men s Rules

BaseStation 1000 Irrigation Controller Keeping a Pond or Cistern Full

UNIT PLAN PRIMARY SCHOOL

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Official Competition Rules for 2017

Grade 8 Science:Unit 1-Water Systems

Chapter 17 Ballistics By the end of this chapter you will be able to:

General Build Instructions for Mach 1 BT50 and BT55 Single Fin Kits. Needed Items for Assembly

Technical Data Sheet DW1 Undercoats

Let s go through the mechanics of air resistance that way we can understand why an aero helmet may be a good option for someone.

SAMPLE COMPETITIVE PRO BY TOM SAUDER FAST BREAK SOCCER

Slim Down and Out Swivel Mount Assembly & Installation Directions

IMPORTANT SAFETY INFORMATION

Recreational Games. Ladder Ball

The guidelines are written for singles events; you should follow the same principles for doubles events

Rev B Medivators Inc.

SMALL SIDED FOOTBALL 2012

Sports Categories Details (Rules and Regulations inclusive)

MY FIRST SERVE PLAYBOOK. Congratulations On Completing the Game Challenge! I am in the grade. on (Write in today s date)

Lab rotation on vacuum techniques and thermal imaging

Instructor Guide. Counter Sinking. Flush Riveting

Softball Umpire Fitness Testing Protocols. Softball Umpire Fitness Testing Protocols

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

Autoclear Superior Pack

AGM 33 PIKE ALL FIBERGLASS. Specifications Length: 92 Diameter 5.5 Weight: 24 lbs Motor Mount: 75mm Fins: 6-3/16 G10 CP: 68 from nose tip Parts List

Differences between NFHS and Official Baseball Rules (OBR)

Technical Data Sheet EW1 Top coats

Introduction. Ballistic evidence helps explain: o What type of firearm was used. o The caliber of the bullet. o The number of bullets fired

Official Competition Rules for 2017

Arterial and Venous Patient Training Arm

V O L L E Y B A L L C A R N I V A L

OWNER S MANUAL WinTech Racing

Activity: Energy In-Energy Out

High Stick causing medical attention will result in an automatic 5 minute major and a game

HAWKS Flag Football Rule Book. First Edition. 1/1/2017 Spring Hill Hawks

Modified ISL Playing Rules

USTA Atlanta Combo Doubles Registration Information Play begins in late April

Policy and Procedures

Activity 2: The Incredible Journey

Policy Document. Water Safety Policy

WCSC Walnut Tournament 2018

Levels of Play, Skill Goals & Coaching Guides: T-Ball:

2018 Dance Camp Chicago Rules

Pediatric Therapy 2675 Central Avenue ~ Billings, Montana ~

Autoclear Superior 250

UCT OPERATING MANUAL UCT POSITIVE PRESSURE MANIFOLD.

Recreational Sports Racquetball Rules

Girls T20 Smash U16 Playing Conditions

Modified ISL Playing Rules

American Association of State Highway and Transportation Officials

The information in this document supersedes the Pairs Skating Calling Clarifications for Juvenile, Intermediate and Novice.

Freshman Baseball Post Season Player Evaluation

OPERATIONS CHALLENGE 2017

Intro to Flag Football

All Students MUST fly with the assistance of a Club approved Instructor until such time as he/she has passed his/her Wings Test.

OFFICIAL RULES FIELD:

Bloat is an abnormal accumulation of air, fluid and or foam in the stomach.

USTA Northern California Junior Team Tennis Section Championship Rules (Updated as of 8/1/16)

A Guide to Relocating Hazardous Materials

Transcription:

Black Brant Vb The Black Brandt VB kit cntains all the parts necessary* t build a flying high pwer rcket: (1) Pre-sltted main airframe (1) Nse cne (3) Fins (1) Pistn ejectin kit: (1) Pistn tube (1) Sltted bulkplate (1) Pistn strap (1) D-ring (1) Parachute (1) Mtr munt tube (1) Airframe t MMT centering ring (1) Ntched airframe t MMT cent. ring (1) Shck crd (2) Launch lug (1) Decal sheet (1) Instructin sheet (this ne!) BRISTOL AEROSPACE ALF-VB-08 *Epxy, paint, and mtr nt included. STORAGE AND FIRING TEMPERATURE +10 F TO +125 F Please read and understand all instructins befre building! The center f pressure (CP) f this rcket is 37 inches frm nse tip. After finishing yur rcket, permanently mark the center f pressure n the airframe. After lading the rcket with a mtr, make sure that the center f gravity (balancing pint) is at least ne bdy diameter frward f the center f pressure mark. The center f gravity can be mved frward by adding weight t the nse cne. Cpyright Public Missiles Ltd. 2000

Other items yu will need: > Masking tape > One set f epxy > Cellphane tape > One sheet each 120 and 220 sandpaper > Ruler and pencil Please read and understand all instructins befre cntinuing! All surfaces t be bnded must be scuffed with 120 grit sandpaper. Step 1 Dry fit bth centering rings int the airframe and ver the mtr munt tube. The ntched ring can be a little snug in the airframe and n the mtr tube. If it is tight, sand the ID and/r OD fr a better fit. The standard centering ring shuld be a little lser in the airframe and ver the mtr munt tube t aid in later remval. Sand the ID and/r OD fr a lser fit if necessary. Standard centering ring Tape tabs Gap in epxy Mtr tube Gap in epxy fillet Ntched centering ring Spread a bead f epxy arund the circumference f ne end f the mtr tube leaving a 1 gap in the bead fr the ntch in the centering ring. Slip the ntched centering ring ver the mtr tube with the ntch aligned with the gap in the epxy bead. Be sure the ntch in the ring remains clear f epxy. Lcate the ring 1/2 frm the end f the mtr tube and allw the epxy t set. Apply an epxy fillet t each side f the ring still keeping the ntch clear. Slide the standard centering ring ver the mtr tube until 1/8" f the mtr tube is prtruding beynd the ring. Make 3 r 4 tabs using cellphane tape as shwn abve t aid in remving this ring later. D nt use any glue at this time, this centering ring will be remved in a subsequent step. Step 2 Epxy Fill ntch cmpletely with epxy ~4.0 Masking tape Ntch Pistn strap Spread a layer f epxy abut 1 wide and 4 lng n the mtr tube just belw the ntch in the upper centering ring. Slip ne end f the pistn strap (the widest strap in the kit) thrugh the ntch in the centering ring. Pull thrugh abut 4" f this strap thrugh the ntch and press it firmly int the epxy n the side f the mtr tube. Hld the strap in place against the tube with masking tape until the epxy cures. Remve the masking tape. Fill the entire centering ring ntch with epxy. Stuff the free end f the strap int the mtr tube t keep it ut f the way fr the next step.

Step 3 Yu will need a lng stick r dwel fr applying epxy in this step. Just belw is a drawing f ne gd methd fr creating an extended epxy applicatr. Simply epxy a dwel r stick t a tngue depressr r ppsicle stick. Mark the stick at 7.0 7.0 Make a mark n the stick at 7.0 s yu can tell hw deep the stick is in the airframe when spreading the epxy. Using yur extended epxy applicatr, spread a bead f epxy arund the inside circumference f the airframe 7.0 frm the bttm f the airframe. Keep the mark n the stick even with the end f the airframe 7.0 Strap n mtr tube NOT in line with a fin slt Hlding the airframe upright (vertical), push the mtr tube assembly int the airframe, making sure the strap is NOT in line with a fin slt, until the bttm f the mtr tube is flush with the bttm f the airframe. Keep the assembly vertical until the epxy cures. Mtr tube flush with airframe Step 4 A) Apply a bead f epxy t the rt edge f a fin. Push the fin thrugh the slt in the airframe and against the mtr munt tube. Make sure that the fin is perpendicular t the airframe. Use tape t hld the fin in psitin while the epxy cures. Repeat this prcess fr all fins. B) Apply an epxy fillet t bth sides f each fin. Carefully smth the epxy with yur finger befre it begins t gel. Allw the epxy t set up befre rtating the rcket t d the next set f fins. Once the epxy has fully cured, yu shuld sand the fillet smth with fine sandpaper. Sanding will help the primer hld better t the epxy. C) Gently pull the centering ring ff the end f the rcket by tugging n the tape tabs. Using a stick, apply an epxy fillet t the fins at the mtr munt tube and the inner airframe wall. D) Remve the tape tabs frm the centering ring and permanently epxy it in the base f the rcket 1/8 in frm the bttm f the airframe. Epxy fillet pints

Step 5 NOTE: In this step yu will be using the free end f the strap that yu munted t the mtr tube assembly. A B C D E F A) Pull the free end f the strap thrugh the slt in the pistn bulk plate. B) Slip the metal "D" ring ver the strap. C) Feed the strap back thrugh the slt. D) Pull n the strap until the D ring is wedged at the slt. E) Flip the assembly ver. Spread a layer f epxy n the underside f the pistn plate as shwn. Fld the shrt end f the strap flat against the pistn plate and press it int the H epxy. Yu can use a clamp t hld the strap in the epxy while it sets. G F) When the epxy has cured, pull the strap until the "D" ring is wedged tight at the slt. Apply epxy t the strap at the "D" ring. G) Epxy the pistn plate inside the pistn bdy 1/8" frm the tp. H) Apply an epxy fillet t bth sides f the pistn plate. Step 6 In the next step yu will tie the shrt end t the eyelet n the nsecne 1/3 f shckcrd In the next step yu will tie the lng end t the D ring n the pistn Prepare the parachute per the parachute instructins. Thread the shck crd thrugh the lp yu made in the parachute shrud lines and tie it using the knt illustrated n the left. Nte that the chute shuld be attached t the shck crd at abut the 1/3 pint f the shck crd. Alternatively, yu can tie the shck crd t a kwik-link and then attach the kwik-link t the lp in the shrud lines.

Step 7 Thread the lng end f the shck crd thrugh the D ring and tie it using the knt illustrated belw. Alternatively, yu can tie the shck crd t a kwik-link and then attach the kwiklink t the D ring. Use the same knt t attach the ther end f the shck crd t the eye blt n the paylad sectin. 6.0 T cinch the knt, alternately pull n the trailer and push the knt twards the attach pint. Repeat until tight. T make sure the knt never slips, place a drp f epxy n the trailer where it meets the knt. DO NOT saturate the knt with epxy r CA! Pull trailer Push knt Drp f epxy Step 8 Using a sharp pinted knife, remve the flash frm the eyelet at the base f the nsecne. If necessary, yu can enlarge the eyelet by using the knife t extend the pening tward the nsecne bdy (nt tward the edges as this will weaken the eyelet. Thread the shck crd thrugh the eyelet and tie it t the nsecne using the knt illustrated belw. Add a drp f epxy t the trailer at the knt t make sure the knt never slips. DO NOT saturate the knt with epxy r CA. Alternatively, yu can tie the shck crd t a kwik-link and then attach the kwik-link t the nsecne eyelet. 6.0 Drp f epxy

Step 9 The rcket drawn belw is generic and may nt represent the kit yu are building. It is intended t prvide a general guideline fr munting launch lugs t this r any rcket. Sand the entire surface f each launch lug with 100 r 120 grit sandpaper. Epxy ne launch lug in place 1 t 2 inches frm the bttm f the rcket and the ther launch lug at abut the CG (balancing pint) f the rcket (withut mtr installed). If the rcket yu are building has a tailcne r battail, then munt the first lug just abve it. Be sure the lugs are perfectly in line with each ther, parallel t the airframe and nt in line with a fin. Apply an epxy fillet t bth sides f each lug. CG 1 t 2 frm bttm f rcket Secnd lug at abut the balance pint f the rcket (withut mtr)

Black Brant Vb Clred stripes are self-adhesive Mn-Cte available at mst hbby shps in 6x36 inch sheets. Stripes can als be painted n, but this mre time cnsuming and difficult. 0.25 n base f nse 1.25 MPE BRISTOL AEROSPACE ALF-VB-08 MPE BRISTOL AEROSPACE ALF-VB-08 Tw red fins and ne white fin STORAGE AND FIRING TEMPERATURE +10 F TO +125 F +10 F TO +125 F STORAGE AND FIRING TEMPERATURE WHITE RED SILVER BROWN Revised 3.27.00